Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40,351.85Rejected-Finance | L1 | Rejected-Finance L1 | |
| 2 | L2₹53,926+₹13,574.15 (33.6%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹68,443.28+₹28,091.43 (69.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹84,416.74+₹44,064.89 (109.2%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | M/S PRAKASH CONSTRUCTION L4 | M/S HARIPAL SINGH L1 | M/s Raja Ram Shukla Contractor L3 | UMA SHANKAR CHAUDHARY CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cutting and proper disposal of Narkul & moonj at both side of Flapper | 435 | M2 | 6.5 ₹2,827.5 | 4.35 ₹1,892.25 | 5 ₹2,175 | 4.16 ₹1,809.6 Lowest |
| 2.00 | Earth Work with rough dressing and poper disposal for cleaning both side of Flapper Floor and Channel including cost of all labour and T&P etc.required for comlection of work. | 210 | M3 | 66 ₹13,860 | 65 ₹13,650 | 45 ₹9,450 | 42.24 ₹8,870.4 Lowest |
| 3.00 | Earth Work in fiilling in all type soil i/c loading, unloading, carriage with proper manual compaction and dressing etc including cost of all labour and T&P etc.required for comlection of work. | 258 | M3 | 224 ₹57,792 | 60 ₹15,480 Lowest | 190 ₹49,020 | 143 ₹36,894 |
| 4.00 | Cleaning of Flapper gate R/S and C/S Portion stool ,Kachara and Other. | 2 | No | 495 ₹990 | 30 ₹60 Lowest | 450 ₹900 | 316 ₹632 |
| 5.00 | Oiling & Greesing of Flapper gate | 2 | No | 600 ₹1,200 | 150 ₹300 Lowest | 580 ₹1,160 | 384 ₹768 |
| 6.00 | Painting of Flapper with two coat including cost of all materials,labour and T&P etc.required for Completion of work. | 7 | M2 | 203 ₹1,421 | 100 ₹700 Lowest | 170 ₹1,190 | 129 ₹903 |
| 7.00 | Distempering of Flapper gate of Abutment,Wing wall,para pet with two coat oil bound distempeer of approved make of Burger ,Jenson & Nicholsen ,Shaimar,Asian,Nerolac over on Priming coat of cement primer on new surface after thoroughly brushing the surface free from morter drooping and other foreign matter and also including preparing the surface even with plaster of paris/shiting and sand paered sooth including Cost all Material ,labour and T&P ect.required for completion of works. | 103.37 | M2 | 61.2 ₹6,326.24 | 80 ₹8,269.6 | 44 ₹4,548.28 | 39.17 ₹4,049 Lowest |
Tender Value
₹84,000
EMD Value
₹2,000
Closing Date
12 Jun 2026, 2:00 pmClosed
Assistant Engineer-II, Flood Work Div-1,Basti
Assistant Engineer-II, Flood Work Div-1,Basti
CLEANING ,PAINTING AND REPAIR OF REGULATOR AT KM 14.390 AND 15.500 OF H.P BUND ON RIGHT BANK RIVER MANWAR IN DISTT BASTI
2026_UPIDC_1157733_2
01/A.E-II/2026-27
Open Tender
Civil Works
Item Wise
7 days
Basti
Please refer Tender documents.
2 documents required · 2 mandatory
₹559
₹2,000
31 Jul 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and proper disposal of Narkul & moonj at both side of Flapper | 435 | M2 | - | - |
| 2 | Earth Work with rough dressing and poper disposal for cleaning both side of Flapper Floor and Channel including cost of all labour and T&P etc.required for comlection of work. | 210 | M3 | - | - |
| 3 | Earth Work in fiilling in all type soil i/c loading, unloading, carriage with proper manual compaction and dressing etc including cost of all labour and T&P etc.required for comlection of work. | 258 | M3 | - | - |
| 4 | Cleaning of Flapper gate R/S and C/S Portion stool ,Kachara and Other. | 2 | No | - | - |
| 5 | Oiling & Greesing of Flapper gate | - | No | - | - |
| 6 | Painting of Flapper with two coat including cost of all materials,labour and T&P etc.required for Completion of work. | 7 | M2 | - | - |
| 7 | Distempering of Flapper gate of Abutment,Wing wall,para pet with two coat oil bound distempeer of approved make of Burger ,Jenson & Nicholsen ,Shaimar,Asian,Nerolac over on Priming coat of cement primer on new surface after thoroughly brushing the surface free from morter drooping and other foreign matter and also including preparing the surface even with plaster of paris/shiting and sand paered sooth including Cost all Material ,labour and T&P ect.required for completion of works. | 103.37 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.61 MB
BOQ_2169629.xls
BOQ • 0.27 MB
Buklet.pdf
Tender Documents • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .