Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LRejected-Finance | ₹12.9 L | L1 | Rejected-Finance Due to administrative reason |
| 2 | L2₹13.1 LRejected-Finance | ₹13.1 L | L2 | Rejected-Finance Due to administrative reason |
| 3 | L3₹13.6 LRejected-Finance 28 1 THURAIYUR PUTHUCHINNAKAVUR METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹13.6 L | L3 | Rejected-Finance Due to administrative reason |
| 4 | L4₹14.1 LRejected-Finance | ₹14.1 L | L4 | Rejected-Finance Due to administrative reason |
| Sl No | Description | Qty | Unit | Sathish Kumar & Co L1 | TRadhakrishnanandco L2 | Kadeesh Constructions L4 | SRI SELVALAKSHMI ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete. | 112 | One cubic metre only 1 m3 | 409 ₹45,808 | 250 ₹28,000 | 409 ₹45,808 | 357 ₹39,984 |
| 2.00 | Drilling holes of 40 mm dia – 1.40 m deep in Hard granite surface, fabrication and fixing 25mm dia. RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of grouting the same with cement slury or resin capsules at 600mm spacing including cost of all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification. | 90 | One numbers only 1 No | 824 ₹74,160 | 1,000 ₹90,000 | 922 ₹82,980 | 1,093 ₹98,370 |
| 3.00 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete.
Upto 3m height
Base Slab (without form work) | 15.5 | One cubic metre only 1 m3 | 13,000 ₹2,01,500 | 15,000 ₹2,32,500 | 14,350 ₹2,22,425 | 9,958 ₹1,54,349 |
| 4.00 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete.
Upto 3m height
Stem Wall (with form work ) | 33 | One cubic metre only 1 m3 | 14,000 ₹4,62,000 | 17,000 ₹5,61,000 | 16,779 ₹5,53,707 | 19,206 ₹6,33,798 |
| 5.00 | Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials, lead, lift, labour charges etc complete | 4,350 | One kilogiram only 1 KG | 107 ₹4,65,450 | 80 ₹3,48,000 | 101 ₹4,39,350 | 91 ₹3,95,850 |
| 6.00 | Supply of rubble backfilling the available earth (60%) with rubble (40%) including cost of consolidation by watering by layer by layer including cost of all materials, labour lead, lift etc., complete. | 87 | One cubic metre only 1 m3 | 480 ₹41,760 | 500 ₹43,500 | 691 ₹60,117 | 381 ₹33,147 |
| 7.00 | Supplying and fixing 110mm dia PVC pipe for weep hole including cost of cutting and fixing in RCC wall, cost of all materials, labour, lead, lift etc., complete. | 16 | One Running meter only 1 RM | 220 ₹3,520 | 200 ₹3,200 | 238 ₹3,808 | 208 ₹3,328 |
Tender Value
Refer Docs
EMD Value
₹18,700
Closing Date
15 Oct 2025, 2:00 pmClosed
SE/C/HP/ERODE
955, EVN Road, Erode
Construction of RCC Protection wall at Ch.26.00 M from the back wall of the Sholayar Power House I to avoid saddle water entering into the Power House
2025_EB_610389_1
SECHPERDKadGenCircle05202526
Open Tender
Civil Works
Solaiyar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,700
Yes
29 Jan 2026
30 Sept 2025
16 Oct 2025
30 Sept 2025
15 Oct 2025
30 Sept 2025
Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete.
Drilling holes of 40 mm dia – 1.40 m deep in Hard granite surface, fabrication and fixing 25mm dia. RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of grouting the same with cement slury or resin capsules at 600mm spacing including cost of all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification.
Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete. Upto 3m height Base Slab (without form work)
Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete. Upto 3m height Stem Wall (with form work )
Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials, lead, lift, labour charges etc complete
Supply of rubble backfilling the available earth (60%) with rubble (40%) including cost of consolidation by watering by layer by layer including cost of all materials, labour lead, lift etc., complete.
Supplying and fixing 110mm dia PVC pipe for weep hole including cost of cutting and fixing in RCC wall, cost of all materials, labour, lead, lift etc., complete.
TRadhakrishnanandco (BID ID -1487613)
SRI SELVALAKSHMI ENTERPRISES (BID ID -1486760)
Kadeesh Constructions (BID ID -1487444)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid