| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹23.9 L+₹15,627.80 (0.66%)Rejected-Finance KRAL PORA BAGH I MEHTAB NEAR MANCHOWA PETROL PUMP DISTRICT BUDGAM 190019 J K | BUDGAM | BUDGAM | J K | 190019 | L2 | Rejected-Finance NOT BEING L1 | |
| 3 | L3₹25.1 L+₹1.3 L (5.46%)Rejected-Finance | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | M/S RATHER CONSTRUCTION CO L2 | M/s Nasir Rasool Dar L3 | M/S LATIF AHMED MIR L1 |
|---|---|---|---|---|---|---|
| 1.00 | M&L for disconnecting all the electrical connections from H.T. and L.T. side of unserviceable transformer of cap upto and including 100 KVA i.e. Jumpers/cable from the cable end box or bushings & earthing terminal of the transformers including taking down, loading, unloading of transformer & transportation by vehicle from substation to the repairing workshop including reinstallation, commissioning and testing complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | 1,000 ₹2,000 Lowest | 1,000 ₹2,000 Lowest | 1,000 ₹2,000 Lowest |
| 2.00 | All as per srl item No 01 here-in-above but cap of transformer above 100KVA upto 250 KVA complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | 1,000 ₹2,000 Lowest | 1,000 ₹2,000 Lowest | 1,000 ₹2,000 Lowest |
| 3.00 | All as per srl item No 01 here-in-above but cap of transformer above 250KVA upto 500 KVA complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | 1,000 ₹2,000 Lowest | 2,000 ₹4,000 | 1,000 ₹2,000 Lowest |
| 4.00M&L for opening the transformer cover along with the conservator by removing the nuts bolts then after removing the internal H.T. & L.T. connections by taking them out by removing studs, bushings, taking out the core-winding assembly out of the tank, removing out burnt HV and LV windings from the core assembly, cleaning of core assembly with CTC including necessary repairs for the unserviceable transformers having ratio 11 / 0.433 KV, draining & decanting of burnt transformer oil and cleaning of sludge deposited in the tank with CTC for the transformers. Rewinding of HV and LV coils with suitable size super enamelled copper wire/ strip (As Existing) having suitable class insulation material. Heating of core winding assembly in hot chamber for 48 hours and removing all the moisture present in it, removal of leakage of tank if any by welding, refilling transformer oil to tank, after putting the core-winding assembly into the tank, reassembling making the internal H.T. & L.T. connections by fixing the studs, bushing, fitting the top cover by replacing cork sheet gasket along with conservator, testing the transformer in the workshop duly filled with oil, all as directed by Engineer-in-Charge for various capacities as under:- Note : Unserviceable items required for repairs including copper wire required for rewinding of transformer shall be measured and paid separately under relevant item of this schedule. Transformer oil with die electric strength not less than 45 KV either new or filtered shall be filled and shall be measured and paid seperately under respective item. | ||||||
| 4.01 | (a) Upto 100KVA | 2 | Each Job | 1,000 ₹2,000 Lowest | 2,000 ₹4,000 | 1,000 ₹2,000 Lowest |
| 4.02 | (b) Above 100KVA upto and including 250KVA. | 2 | Each Job | 1,000 ₹2,000 Lowest | 2,000 ₹4,000 | 1,000 ₹2,000 Lowest |
| 4.03 | (c) Above 250KVA upto and including 500KVA. | 2 | Each Job | 1,000 ₹2,000 Lowest | 4,000 ₹8,000 | 1,200 ₹2,400 |
| 5.00 | S&F super enamelled copper winding wire/ strip of any size for H.T. coils of transformers all as specified. | 330 | KG | 600 ₹1,98,000 Lowest | 900 ₹2,97,000 | 1,000 ₹3,30,000 |
| 6.00 | S&F copper winding strip of any size for L.T. coils of transformers including providing insulation all as required. | 270 | KG | 450 ₹1,21,500 Lowest | 900 ₹2,43,000 | 1,000 ₹2,70,000 |
| 7.00S&F in replacement of LT bushings 433V of suitable size for outdoor/ indoor type transformer of the capacity as under:- | ||||||
Tender Value
₹33 L
EMD Value
₹66,000
Closing Date
29 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE AF SRINAGAR
CWE AF SRINAGAR
REPAIR/MAINT OF HT DISTRIBUTION NETWORK, ISOLATORS, 11 KV BUS BAR, PANELS, AVR AND OTHER CONNECTED WORKS UNDER GE (AF) SRINAGAR
2025_MES_728261_1
CWE(AF)SGR/SGR-33/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE AF AWANTIPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE AF AWANTIPUR
₹66,000
Yes
13 Nov 2025
1 Sept 2025
6 Oct 2025
1 Sept 2025
29 Sept 2025
15 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .