Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.2 LAdmitted-Finance | -20.00% | ₹11.2 L | L1 | Admitted-Finance |
| 2 | L1₹11.2 LAdmitted-Finance | -20.00% | ₹11.2 L | L1 | Admitted-Finance |
Tender Value
₹14.0 L
EMD Value
₹27,944
Closing Date
18 Aug 2026, 3:00 pmClosed
EE XIII(R), PWD MAPUSA GOA
EE XIII(R), PWD MAPUSA GOA
Urgent Disaster Management works including pre-monsoon maintenance of road infrastructure and storm water drainage system in Mapusa constituency
2026_PWD_31029_1
6/4/PWD-WD-XIII (R)/ASW/13/2026-27L9
Open Tender
Civil Works - Roads
Percentage
120 days
MAPUSA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹27,944
19 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
18 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying of laterite stone soling of size 150-200 mm size and murrum having P.I. Value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc. (Measurements shall be considered on finished item) . | 120 | cum | 1,867 | ₹2,24,040 |
| 2 | Clearing and GrubbingRoad Land .(Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.);By Manual Means:-;In area of light jungle | 3.5 | hect | 86,980 | ₹3,04,430 |
| 3 | Supply of semi skilled labour Rs. 460/- per day add 10% Contractor Profit | 700 | Nos | 506 | ₹3,54,200 |
| 4 | Hiring charges of Hydraulic excavators 1 M3 bucket ( JCB) Rs. 600 per
hour x 8 add 10% contractor profit | 50 | days | 5,280 | ₹2,64,000 |
| 5 | Supply of tipper truck on hire Rs.4500/- per day add 10% Contractor profit | 50 | days | 4,950 | ₹2,47,500 |
| 6 | Add 1% labour cess | 1 | m3 | 3,044.3 | ₹3,044.3 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 1.14 MB
BOQ_31427.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].