| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC KUMARDIHI PANDEESHWAR BARDDHAMAN BARDDHAMAN 713363 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹4.8 L+₹5.83 (<0.01%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹4.9 L+₹12,664.94 (2.65%)Rejected-Finance VILL ETHORA P O ETHORA DIST PASCHIM BARDHAMAN PIN 713359 | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
21 Feb 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Lowering three pumps , dismantling , transportation of 2 set of 550 Volt ,1000 GPM pump set complete with pipe range and electricals at OC project of Nakrakonda Kumardihi B Colliery under Bankola Area.
2023_ECL_270781_1
ECL/GM/BA/E TENDER/22-23/Enm/133 Dt. 11.02.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹6,000
28 Aug 2023
11 Feb 2023
22 Feb 2023
11 Feb 2023
21 Feb 2023
11 Feb 2023
11 Feb 2023 - 15 Feb 2023
Amount
Item Description/ Heading
Lowering of complete 3.3KV Operated 1000 GPm single impeller split casing pump including shifting and extension of 6" delivery line and shifting and reassembling of 8" suction line (PUMP NO-1)
Lowering of complete 550V operated 1000 GPM single impeller split cashing pump including shifting and extension of 6" delivery line and sgifting and reassembling of 8" suction line (PUMP NO-2)
Lowering of complete 550V Operated 1000 GPM single impeller split casing pump including shifting and extension of 6" delivery line and shifting and reassembling of 8" suction line (PUMP NO-3)
Extension of 8" suction pipe 3 times for installed pump in continuation to dewatering ( as required)
Labour charges for dismantling of 8" MS suction pipes with foot valve 6" valves 6" non return valve 6" and 8" bends and transporting the same from installation site to colliery store (PUMP NO 3)
Cleaning dismantling of istalled 6" delivery pipe and transportation the same from pump site in OCP to CM Project ( PUMP NO 3)
Complete dismantling of pump , motor , Power cables (200 m , 95 sqmm)FLP 550V starter , FLP550V ACB , bed plate and loading transportation , unloading from site to CM Project workshop (PUMP NO-3)
Labour charges for dismantling of 8" MS suction pipes with foot valve 6"sluice valve 6" Non return valve ,6" and 8" bends and transporting the same from installation site to colliery store (PUMP NO 2, 550V, 1000GPM)
Cleaning dismantling of installed 6" delivery pipe and transportating the same from pump site in OCP to CM Project (PUMP NO 2, 550V,1000GPM)
Complete dismantling of pump , motor , power cables (200 M , 95 sqmm ) FLP 550V FLP transportation , unloading from site to CM Project workshop (PUMP No 2,550V, 1000 GPM)
Dismantling from OCP substation , loading transportation , unloading 3.3KV FLP VCB incoming , outgoining cable from OCP to CM Project Workshop.
Dismantling from OCP substation , loading , transportation , Unloading ,3.3KV/550V , 600KVA FLP TSU from OCP to CM Project workshop.
Total impact of GST for the purpose of CTC
MUKHERJEE AND CHATTERJEE CONSTRUCTION
MUKHERJEE ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .