Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC | 1 | Accepted-AOC Contract Awarded |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
6 Dec 2019, 2:00 pmClosed
SE/GCC-1/Chennai
230KV GIS SS, Guindy Campus, 3rd floor, A10, Thiru.Vi.Ka. Industrial Estate, Guindy, Chennai-32
Dismantling,Pulling and Transportation of 1 No. 50 MVA Power Transformer at Porur 230 KV SS toTRB/Ambattur and Transportation of the same to Oragadam 230 KV SS from TRB/Ambattur and other accessories with oil from Porur 230 KV SS toOragadam 230 KVSS
2019_EB_148534_1
OTMM (W)-17/2019-20 of SE/GCC-I/CHN
Open Tender
Electrical Works
Works
30 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,900
Yes
20 Apr 2020
22 Nov 2019
7 Dec 2019
22 Nov 2019
6 Dec 2019
22 Nov 2019
Amount
Hire charges for crane for Complete Dismantling of 50 MVA ,HHE make Power Transformer accessories
Labour charges for Complete dismantling of 50 MVA, HHE make Power Transformer accessories
Draining of Transformer oil from the Power Transformer main tank to empty oil barrels over and above 800 ltrs.
Loading of Power Transformer tank, oil barrels, H.V., and L.V. Bushings and turret etc into Truck including Raising and lowering, for insertion of rails at Porur 230 kV SS.
Pulling of Power Transformer from plinth and loading into truck at Porur 230 kV SS for a weight of 55 MT and for an approximate pulling distance of 20 metres.
Unloading of Power Transformer from Truck including Raising and lowering of Tr.tank, oil barrels, H.V., and L.V. Bushings for insertion of rails at TRB/Ambattur.
Pulling of Power Transformer from from the truck and placing safer place at TRB/Ambattur for a weight of 55 MT and for an approximate pulling distance of 10 metres.
Transportation of Power Transformer tank,oil barrels,H.V., and L.V. Bhusings and turret from Porur 230 kV SS to TRB/Ambattur
Loading of Power Transformer accessories and oil barrels at Porur 230 kV SS.
UnLoading of Power Transformer accessories and oil barrels at Oragadam 230 kV SS.
Transportation of Power Transformer accessories and oil barrels from Porur 230 kV SS to Oragadam 230 kV SS.(BEYOND CITY LIMIT) for a total weight of 9.2 MT and for an approximate distance of 40 KM.
Loading of Power Transformer into the truck and placing on plinth including Raising and lowering of Transformer tank,oil barrels and accessories at TRB/Ambattur.
Pulling of Power Transformer from safer place to Truck at TRB/Ambattur for a weight of 55 MT and for an approximate pulling distance of 10 metres.
Unloading of Power Transformer from the truck and placing on plinth including Raising and lowering of Transformer tank, oil barrels and all accessories at Oragadam 230 kV SS.
Pulling of Power Transformer from Truck and placing in plinth at Oragadam 230kV SS for a weight of 55 MT and for an approximate pulling distance of 20 metres.
Transportation of Power Transformer tank,oil barrels, Bushings, Turret from TRB/Ambattur to Oragadam 230 kV SS for a total weight of 70 MT and for an approximate distance of 60 KM.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .