| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Finance | -0.10% | ₹7.5 L | L1 | Admitted-Finance |
| 2 | L2₹7.6 LAdmitted-Finance | +1.00% | ₹7.6 L | L2 | Admitted-Finance |
| 3 | L3₹7.8 LAdmitted-Finance | +3.00% | ₹7.8 L | L3 | Admitted-Finance |
Tender Value
₹2.3 L
EMD Value
₹5,000
Closing Date
13 Feb 2026, 4:00 pmClosed
EE(ZONE-3)
EE(ZONE-3) JAL KAL VIBHAG NAGAR NIGAM VARANASI
LAYING OF 250MM DIA NP-3 SEWER LINE FROM C.33/284-B TO C.33/283-X1 CHITTUPUR IN CHETGANJ WARD.
2026_NNVAR_1111810_1
668/II/ZONE-3/J.K.N.N. DATED-29.01.2026
Open Tender
Civil Works - Water Works
120 days
EE(ZONE-3) JAL KAL VIBHAG NAGAR NIGAM VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GM JAL KAL
₹5,000
27 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
Dismantling of Interlocking road with all labour T&P complete.
Excavation of earth mixed soil c sand with all labour T&P complete.
Bailling out or pumping out/liquid mud during trench excavation with all labour T&P complete.
Providing and laying granular, bedding with carefully compacted graded hard crusher broken stone of 100% passing through 20mm sieve, 20- 50% passing through 10mm sieve and 100% retained on 6mm sieve with all labour T&P complete.
Supply of 250 mm dia NP-3 sewer pipe with all labour T&P complete.
Laying, jointing and testing of 250 mm dia NP-3 sewer pipe line with all labour T&P complete.
Provision for inter connection in between proposed sewer line and existing disposal point with all labour T&P complete.
PCC work 1:4:8 cement sand & 40mm thick brick ballast with all labour T&P complete.
1st class brick 1:4 cement sand with all labour T&P complete.
12mm thick plaster 1:3 cement sand with all labour material T&P complete.
CC for frame fixing 1:2:4 cement sand & 20mm thick stone ballast with all labour T&P complete.
Supply of polycrite cover with m.s. frame.
Cartage charges for cover & frame from store to site.
Lighting of during night work.
Provision for site clearance after constuction work with all labour T&P complete.
Repairing of damaged water connection during work with all labour T&P complete.
Repairing of damaged sewer connection during work with all labour T&P complete.
Repairing of unforseen items i.e. power cable, water line, telephone cable, damaged during laying of sewer line with all labour, material T&P complete.
Supply of sand and filling into trenche with all labour, material T&P complete.
Supply of G.S.B. and filling into trenche with all labour, material T&P complete.
Providing and erecting temporary barricading at site as par drawing/direction of engineer-in-charge.
Reinstatement of dismantled Interlocking road with all labour T&P complete.
Disposal of excavated earth where sufficient width of road is not available for stacking of excavated earth average lead 250m.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_2055493.xls
BOQ • 0.29 MB
td.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid