Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC | L1 | Accepted-AOC LOWEST RATE | |
| 2 | L2₹15.6 L+₹2.1 L (15.2%)Rejected-Finance | L2 | Rejected-Finance Highest rate | |
| 3 | L3₹15.8 L+₹2.2 L (16.1%)Rejected-Finance | L3 | Rejected-Finance Highest rate | |
| 4 | L4₹16.5 L+₹2.9 L (21.4%)Rejected-Finance | L4 | Rejected-Finance Highest rate | |
| 5 | L5₹16.9 L+₹3.3 L (24.3%)Rejected-Finance 19 96A PERUNGODU NEYYOOR | L5 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | K. MUTHU L2 | C Selvakumar L4 | P Selvan L3 | SUBASH L5 | PRAVIN CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 2.00Improvements of Multi Purpose Evacuation Centre with Community Hall at Kuttam village in Kuttam Panchayat in Radhapuram Panchyat Union | ||||||||
| 3.00 | Chipping of concrete and roughening the surface including all cost etc complete (PWD SOR 25-26 W-0036) | 34.43 | sq.m | 36.29 ₹1,249.46 | 38.6 ₹1,329 | 36.76 ₹1,265.65 | 35 ₹1,205.05 | 33.7 ₹1,160.29 Lowest |
| 4.00 | Dismantling of Pressed Tiles & Weathering Course including all cost etc complete (PWD SOR 25-26 W-0037) | 280.66 | sq.m | 41.33 ₹11,599.68 | 23.4 ₹6,567.44 | 23.24 ₹6,522.54 | 22 ₹6,174.52 Lowest | 38.4 ₹10,777.34 |
| 5.00 | Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing compound at 2 % by wt of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 34.43 | sq.m | 250.57 ₹8,627.13 | 270.5 ₹9,313.32 | 258.53 ₹8,901.19 | 250 ₹8,607.5 | 237 ₹8,159.91 Lowest |
| 6.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 280.66 | Cum | 1,110.82 ₹3,11,762.74 | 1,183.3 ₹3,32,104.98 | 1,131.46 ₹3,17,555.56 | 1,540 ₹4,32,216.4 | 1,037.2 ₹2,91,100.55 Lowest |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 3.44 | sq.m | 5,808.56 ₹19,981.45 | 6,099.9 ₹20,983.66 | 5,832.65 ₹20,064.32 | 6,500 ₹22,360 | 5,355.2 ₹18,421.89 Lowest |
| 8.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 1,877.22 | sq.m | 122.47 ₹2,29,903.13 | 65.2 ₹1,22,394.74 | 62.26 ₹1,16,875.72 | 60 ₹1,12,633.2 | 57.1 ₹1,07,189.26 Lowest |
| 9.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 826.04 | sq.m | 225.75 ₹1,86,478.53 | 238 ₹1,96,597.52 | 227.57 ₹1,87,981.92 | 200 ₹1,65,208 Lowest | 208.6 ₹1,72,311.94 |
| 10.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 152.8 | sq.m | 129.44 ₹19,778.43 | 141 ₹21,544.8 | 134.83 ₹20,602.02 | 140 ₹21,392 | 123.5 ₹18,870.8 Lowest |
| 11.00 | `Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer. | 85.05 | sq.m | 139.48 ₹11,862.77 | 157.1 ₹13,361.36 | 150.22 ₹12,776.21 | 170 ₹14,458.5 | 123.5 ₹10,503.68 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
9 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (B.pt), Radhapuram
Block Development Office, Radhapuram
Improvements of Multi Purpose Evacuation Centre with Community Hall at Kuttam village in Kuttam Panchyat In Radhapuram Panchayat Union
2026_RDTN_716491_1
A2/3008/2026
Open Tender
Civil Works
Item Rate
Block Development Office, Radhapuram
as per tender document
4 documents required · 4 mandatory
₹0
₹25,000
18 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
9 Nov 2026
23 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Improvements of Multi Purpose Evacuation Centre with Community Hall at Kuttam village in Kuttam Panchayat in Radhapuram Panchyat Union | - | - | - | - |
| 3 | Chipping of concrete and roughening the surface including all cost etc complete (PWD SOR 25-26 W-0036) | 34.43 | sq.m | 43.2 | ₹1,487.38 |
| 4 | Dismantling of Pressed Tiles & Weathering Course including all cost etc complete (PWD SOR 25-26 W-0037) | 280.66 | sq.m | 27.31 | ₹7,664.82 |
| 5 | Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing compound at 2 % by wt of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 34.43 | sq.m | 303.79 | ₹10,459.49 |
| 6 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 280.66 | Cum | 1,329.56 | ₹3,73,154.31 |
| 7 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 3.44 | sq.m | 6,853.88 | ₹23,577.35 |
| 8 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 1,877.22 | sq.m | 73.16 | ₹1,37,337.42 |
| 9 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 826.04 | sq.m | 267.42 | ₹2,20,899.62 |
| 10 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 152.8 | sq.m | 158.44 | ₹24,209.63 |
| 11 | `Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer. | 85.05 | sq.m | 176.52 | ₹15,013.03 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_860706.xls
BOQ • 0.40 MB
kuttamtener.pdf
Tender Documents • 1.10 MB
singletender1.pdf
PDF • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .