| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance F 3 FIRST FLOOR IMTIYAS COMPLEX NEAR JAMIYA MASZID PANDITHWADA PONDA GOA | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹4.7 L (2.35%)Admitted-Finance | ₹2.1 Cr+₹4.7 L (2.35%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹7.1 L (3.55%)Admitted-Finance | ₹2.1 Cr+₹7.1 L (3.55%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHERKALA CONSTRUCTIONS PVT. LTD. L1 | EXPANSE INDIA BUILDCON PVT LTD L3 | SITARAM INFRAPROJECT PVT LTD, L2 |
|---|---|---|---|---|---|---|
| 1.00 | Metal Beam Crash Barrier
Type - B, Providing and erecting a "Thrie" metal beam
crash barrier \providing and erecting "Thrie Beam " Crash barrier comprising of following three factory made unitesviz. 1) Thrie Beam 2) Spacer Block 3) Vertical Post. The Thrie beam 3mm thick cold roll formed guard rail raw material Conforming to IS-5986-2011 with minimum Grade 255 & with minimum yield stress of 255 Mpa which is fixed by bolted connection to spacer block C- channel of size 150mm* 75mm & 5mm thick, 54.6cm height spaced 2meter centre to centre, fixed to Vertical Post C-channel of size 150mm*75mm&5mm thick cold roll formed section made from HR coils raw material conforming to IS-5986- 2011 with minimum Grade 255 & with minimum yield stress of 255MPa, with 85cms free height above road or Ground level, and embedded to 115cms deep in cement concrete block of size 35cm*35*115cm or as directed by Engineer Incharge, assembled & fixed as per drawings of MORTH&H Circular No.RW/NH/33022/1/94-DO/III, dated 24/6/1994 & construction operation as per 811 or revevant MORT&H specifications for Roads & Bridge Works (latest edition). All fittings (bolts, nuts, fasteners, washers etc.) shall be conforming to IS:1367 & IS:1364 & galvanished by hot dip zinccoated process @0.55kg/m2 conforming to relevent IS specifications all etc. complete | 1,150 | RM | 4,700 ₹54,05,000 | 4,500 ₹51,75,000 Lowest | 5,800 ₹66,70,000 |
| 2.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
Ordinary soil
Mechanical Means (Depth upto 3 m) | 652 | cum | 75 ₹48,900 Lowest | 100 ₹65,200 | 150 ₹97,800 |
| 3.00 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 958 | cum | 75 ₹71,850 Lowest | 100 ₹95,800 | 200 ₹1,91,600 |
| 4.00 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ),
trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 411 | cum | 100 ₹41,100 Lowest | 110 ₹45,210 | 900 ₹3,69,900 |
| 5.00 | Plain Rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. complete | 142 | cum | 1,200 ₹1,70,400 | 1,200 ₹1,70,400 | 980 ₹1,39,160 Lowest |
| 6.00 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
PCC Grade M20 | 522 | cum | 5,700 ₹29,75,400 | 6,250 ₹32,62,500 | 4,000 ₹20,88,000 Lowest |
| 7.00 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
RCC Grade M30
Case II - Using Batching Plant, Transit Mixer and Concrete Pump | 380 | cum | 9,500 ₹36,10,000 | 10,500 ₹39,90,000 | 4,500 ₹17,10,000 Lowest |
| 8.00 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications . | 26.6 | Tonnes | 95,000 ₹25,27,000 | 85,000 ₹22,61,000 | 80,000 ₹21,28,000 Lowest |
| 9.00 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. | 222 | cum | 1,000 ₹2,22,000 | 750 ₹1,66,500 Lowest | 1,000 ₹2,22,000 |
| 10.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge.
75 mm dia | 143 | RM | 200 ₹28,600 Lowest | 200 ₹28,600 Lowest | 1,100 ₹1,57,300 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
30 Jun 2022, 5:30 pmClosed
Executive Engineer, WD XV(NH), PWD, Ponda-Goa
Office of the Executive Engineer, WD XV(NH), PWD, Ponda-Goa
Road Safety measures Improvement and providing crash barriers and other safety devices in isolated stretches on NH 748 km.84.00 to 97.00 in the state of Goa.
2022_MoRTH_695626_1
PWD/WDXV(NH)/ASW/22-23/07
Open Tender
Civil Works - Highways
Works
330 days
Ponda
Tender fee Rs. 2000 to be submitted through the portal bharatkosh.gov.in scanned copy of the receipt shall be sent by email to ee15 OFFICIAL id and the same shall be uploaded on the portal.
8 documents required · 8 mandatory
₹0
₹4.4 L
4 Aug 2022
17 Jun 2022
4 Jul 2022
17 Jun 2022
30 Jun 2022
21 Jun 2022
17 Jun 2022 - 27 Jun 2022
Amount
Metal Beam Crash Barrier Type - B, Providing and erecting a "Thrie" metal beam crash barrier \providing and erecting "Thrie Beam " Crash barrier comprising of following three factory made unitesviz. 1) Thrie Beam 2) Spacer Block 3) Vertical Post. The Thrie beam 3mm thick cold roll formed guard rail raw material Conforming to IS-5986-2011 with minimum Grade 255 & with minimum yield stress of 255 Mpa which is fixed by bolted connection to spacer block C- channel of size 150mm* 75mm & 5mm thick, 54.6cm height spaced 2meter centre to centre, fixed to Vertical Post C-channel of size 150mm*75mm&5mm thick cold roll formed section made from HR coils raw material conforming to IS-5986- 2011 with minimum Grade 255 & with minimum yield stress of 255MPa, with 85cms free height above road or Ground level, and embedded to 115cms deep in cement concrete block of size 35cm*35*115cm or as directed by Engineer Incharge, assembled & fixed as per drawings of MORTH&H Circular No.RW/NH/33022/1/94-DO/III, dated 24/6/1994 & construction operation as per 811 or revevant MORT&H specifications for Roads & Bridge Works (latest edition). All fittings (bolts, nuts, fasteners, washers etc.) shall be conforming to IS:1367 & IS:1364 & galvanished by hot dip zinccoated process @0.55kg/m2 conforming to relevent IS specifications all etc. complete
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary soil Mechanical Means (Depth upto 3 m)
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
Plain Rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. complete
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M30 Case II - Using Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications .
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge. 75 mm dia
Providing & erction of 30 watts solar panel (12 VDC) Amber (Orange) colour polycarbonate lamp (300 mm dia) blinkers of 24 hrs backup on bridge including excavation & concreting in CC 1:2:4, as per the direction of engineer-in-charge in all respects.
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 2012 made of high intensity Grade sheeting using ASTM sheeting "C' type XI micro prismatic retro reflective material vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)etc complete as per MORT &H Specifications Fifth Edition. A 10 years warranty for Retro Reflective Sheeting from the original sheeting manufacturer & a certified copy of three years outdoor exposure report from an independent test lab for the product offered shall be submitted by the contractor [A] 90 cm equilateral triangle
[B] 60 cm x 45 cm rectangular
By Mix in Place Method (Construction of granular subbase by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 for grading- I Material
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadamnspecification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.) including primer coat with bitumen emulsion @ 0.60 Kg/m2 Grade -II (19mm nominal size). for Grading II(19 mm nominal size)
Rate Analysis 3 Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder VG-40 @ 5.4 TO 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) including tack coat of bitumen VG-10 @ 0.20 Kg/m2. Grade II ( 10 mm nominal size )
Supplying and fixing Pre-cast cement concrete kerbstones(factory made,the factory should be ISO certified and registered under Dirctorate of Industries, Govt. of India) of M-20 with 20 mm nominal size granitic/basaltic aggregate properly consolidated by mechanical plat-form and vibrators with smooth finish including fixing at site complete as per specification. Size 60 cm L x45 cm H x 15 cm T
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
SITARAM INFRAPROJECT PVT LTD,
EXPANSE INDIA BUILDCON PVT LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_731918.xls
BOQ • 0.29 MB
SBD1.pdf
Tender Documents • 14.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .