Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹9.5 L+₹6,991.50 (0.74%)Accepted-Finance | L2 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹19,200
Closing Date
1 Feb 2024, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Renovation of High tension Automatic power factor controller unit of Standard make at CWPH HP I.
2024_DJB_252605_12
NIT 17
Open Tender
Miscellaneous Works
Item Rate
30 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹19,200
9 Feb 2024
25 Jan 2024
1 Feb 2024
25 Jan 2024
1 Feb 2024
25 Jan 2024
Dismantling of defective components like capacitors, fuses, lights, relays etc. from 380 kVAr HT APFC panels including dismantling of terminations, wirings, hardware etc. as required at site
Supply of 127 kVAr, 3.6 kV, 50 Hz, 3 phase capacitor units, complete with terminal cover, discharge device and mounting arrangement including all hardware etc. for replacement of defective capacitors in APFC panel Make - Standard
Supply of 100A, 3.3 kV fuses for protection of 127 kVAr capacitor units Make - Standard
Supply of microprocessor-based HT APFC relay with digital display of power factor and other parameters for operation capacitor banks
Supply of LED indication lights of various colours to replace defective/burnt out lights Make -Standard
Installation and connection of various components as described above in APFC panels using necessary hardware and terminations with aluminium links, multistrand copper wires, lugs and tapes etc. as required at site
Servicing of APFC panels including complete dusting of the panel, cleaning of vacuum contactors, Decarbonising of joints, alignment of doors, checking of all nuts &bolts etc. as required at site
Servicing of VCB panels including complete dusting of VCB panels, cleaning of contact points, Decarbonising of joints, checking of all nuts &bolts etc. as required at site
Testing & commissioning of APFC panels as per required parameters including following: i. Meggering of all equipment for phase to phase, and phase to earth. ii. All function tests iv. Monitoring of power factor during warranty period
RP Electricals
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .