Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.2 L+₹13,689.68 (1.36%)Rejected-Finance | ₹10.2 L+₹13,689.68 (1.36%) | L2 | Rejected-Finance L2 |
Tender Value
₹10.2 L
EMD Value
₹20,000
Closing Date
17 Mar 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
M.G.C.C.D. - 7 BIJNOR
Construction of V.R.B. at Km. 3.000 of Raipur Mr. (Lot- 20)
2025_UPIDC_1001451_63
03/EE/2024-25
Open Tender
Civil Works - Canal
Item Rate
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹20,000
Yes
30 Apr 2025
11 Mar 2025
17 Mar 2025
11 Mar 2025
17 Mar 2025
11 Mar 2025
Amount
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work.
Cement concrete in 1:3:6 including all cost of material, labour , T&P etc. for completion of work.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work.
For CC work
For RCC work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work.
Cement concrete in 1:2:4 (M-15) including all cost of material, labour , T&P etc. for completion of work.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work.
Supply and laying Tarfelt sheet in Two layers on Bed Block including all cost of material, labour and T&P etc. complete.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete.
Earth work in filling in ordinary soil including ramming and dressing the surface to be required level and slope also including carriage beyond 3.00 KM up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Providing and laying coarse sand including all cost of material, labour and T&P etc. complete.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete.
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete.
M/S DILSHAD AHMED (BID ID -5046400)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .