| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.0 L+₹3,132.55 (1.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.1 L+₹7,458.45 (2.50%)Admitted-Finance 213 BAGPOTA ROAD SONALI PARK SARSUNA KOLKATA KOLKATA KOLKATA 700061 | KOLKATA | WEST BENGAL | 700061 | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
7 Oct 2026, 11:00 amClosed
EXECUTIVE ENGINEER
516 D H ROAD KOL-34
MAINTENANCE OF ROAD WITH HOT-MIX WORKS AT DIFFERENT PLACES OF K. K. ROAD, BORODA SARANI,SUKANTA PALLY,PROMOD NAGAR ETC. IN WARD NO.-122, BR.-XIII
2026_KMC_1043366_1
KMC/XIII/122/09/26-27
Open Tender
CIVIL WORKS
Percentage
50 days
W-122
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹6,000
9 Oct 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including
spreading the spoils properly over the flank as necessary or on berm
to approximate grade & camber and rolling the sub-grade with power
roller to proper camber and grade as per direction and satisfaction of
Engineer-in-charge including uprooting and removing plants and
jungles when and where necessary.
(a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16
Page No.240) | 112.5 | SQUARE METER | 14.4 | ₹1,620 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including
spreading the spoils properly over the flank as necessary or on berm
to approximate grade & camber and rolling the sub-grade with power
roller to proper camber and grade as per direction and satisfaction of
Engineer-in-charge including uprooting and removing plants and
jungles when and where necessary.
(b) For each additional Depth of 150mm and part thereof. ( Ref :PWD
(Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | 112.5 | SQUARE METER | 19 | ₹2,137.5 |
| 3 | Labour for picking up existing metalled road surface to a specified
average depth, including screening and stacking the pavement
materials.
(a) For average depth up to 40 mm by manual means:
(i) Stone-metal surface. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.01 Page No.331) | 1,262.81 | SQUARE METER | 12.9 | ₹16,290.25 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in
layers not exceeding 150 mm to proper gradient and camber,
inundating each layer by water and packing and ramming layer by
layer to achieve desired compaction, including lighting, guarding,
barricading and making adequate earthen bundh where necessary,
curing with water as per direction, mending cracks and depressions
by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate.
The compaction factor for dry, clean sand may be taken as 0.835.
(The payment is to be made on the basis of finished compacted
volume).
(c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page
No.245 & page-222 sl. No-4) | 8.44 | CUBIC METER | 1,172.6 | ₹9,893.81 |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and
dressing bed to proper level and filling joints with local sand. ( Ref
:PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda
dtd-04.06.18,P-1) | 248.02 | SQUARE METER | 361 | ₹89,535.22 |
| 6 | Water Bound Macadam Sub Base by consolidating Jhama metal /
Laterite chelly or stone metal / shingles of specific size in hard crust
to requisite thickness (measured after compaction) in layers including
screening of metals etc. as necessary, hand packing, sweeping,
watering and rolling in stages with power roller to proper line, grade
and camber, lighting, guarding & barricading and making necessary
earthen bundh of one metre width on each side where necessary to
protect edges and preparing the bed by necessary cutting or filling
and rolling all complete including the cost of all materials and hire and
labour charges of all men and machineries and compacting to the
required density, as per Clause 404 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal /
Laterite (63 mm to 45 mm) (Moorum replaced with course sand)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 &
page-222 sl. No- 1 & 5 (e)) | 18.6 | CUBIC METER | 2,596.83 | ₹48,304.93 |
| 7 | Providing and applying tack coat with Cationic Bitumen Emulsion of
approved grade conforming to IS: 8887-1978 on the prepared surface
cleaned with Hydraulic broom, moistening the surface including cost
and carriage of emulsion, hire charges of machinery and labour, cost
of fuel and lubricants all complete as per Clause 503 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision).
(ii) On Granular surfaces treated with primer. (Using Bitumen
emulsion at the rate of 0.25 to 0.30 kg per sqm.) ( Ref :PWD (Rds &
Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No.
5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018,
pg-228 item-1.03 (i), Pg-230,Table-I, It-4,) | 248.02 | SQUARE METER | 10.33 | ₹2,562.05 |
| 8 | Providing and applying tack coat with Cationic Bitumen Emulsion of
approved grade conforming to IS: 8887-1978 on the prepared surface
cleaned with Hydraulic broom, moistening the surface including cost
and carriage of emulsion, hire charges of machinery and labour, cost
of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of
0.20 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page
No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2
of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i),
Pg-230,Table-I, It-4,) | 1,262.81 | SQUARE METER | 9.51 | ₹12,009.32 |
| 9 | Transportation and laying 40 mm thick hot asphaltum mixture from
kmc plant to the work site including rolling but excluding the cost of
tack coat (covered area- 1250 square meter per 100 mt hot-mixture)
a) without paver finisher
i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the
year 2019-2020, As per present market Price, Rate appvd. By
D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution
MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar
no-02 of 2018-19 dtd.04.04.2018 ) | 1,510.83 | SQUARE METER | 41 | ₹61,944.03 |
| 10 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick
up to 100mm high with 20mm thick sand and cement plaster (1:4)
including finishing with neat cement after cutting the asphaltum
pavement taking out and re-fixing the existing cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | 4 | EACH | 1,507.28 | ₹6,029.12 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
TForm122092627.pdf
Tender Documents • 0.25 MB
BOQ_2560170.xls
BOQ • 0.29 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .