| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC GANGABAKSPURWA NEAR BILGRAM CHUNGI DISTRICT HARDOI | HARDOI | HARDOI | UTTAR PRADESH | ₹17.5 L | L1 | Accepted-AOC Due to L1 and work is completed |
| 2 | L2₹17.6 LRejected-Finance 19 1 ALOO THOK DISTRICT HARDOI | HARDOI | HARDOI | UTTAR PRADESH | ₹17.6 L | L2 | Rejected-Finance Rejected due to higher rate to L1 |
| 3 | L3₹18.1 LRejected-Finance RAMNAGAR BAZAR KALAN DISTRICT KANNAUJ | KANNAUJ | UTTAR PRADESH | ₹18.1 L | L3 | Rejected-Finance Rejected due to higher rate to L1 |
| 4 | L4₹18.9 LRejected-Finance 69 2 BAHRA SAUDAGAR PURVI NABIPURWA DHARAMSHALA ROAD DISTRICT HARDOI UTTAR PRADESH | HARDOI | UTTAR PRADESH | 209869 | ₹18.9 L | L4 | Rejected-Finance Rejected due to higher rate to L1 |
| 5 | Rejected-Technical 297 SUBHASH NAGAR DISTRICT HARDOI | HARDOI | HARDOI | UTTAR PRADESH | - | - | Rejected-Technical Rejected by commitee |
| Sl No | Description | Qty | Unit | NIRBHAY KUMAR MISHRA L4 | MS. SAI CONSTRUCTION AND SUPPLIERS L2 | PRAVEEN KUMAR BAJPAI L1 | JAI MAHAKAL CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting | 8,365.2 | Sqm | - | 3.3 ₹27,605.16 | 3.3 ₹27,621.89 | 5.31 ₹44,427.58 |
| 2.00 | Earth Work in excavation in foundation for Masonary work including all lead & lift including back filling and compaction required for proper completion of the work. | 6.02 | Cum. | - | 93 ₹559.86 | 93 ₹559.86 | 521.33 ₹3,138.41 |
| 3.00 | Supplying and installation of steam curv (prestressed concrete of grade M-25 grade with 4 nos. of 4mm STS wire) slab of size 2100mm x 300mm x 50mm with provision for hole as per requirement for fixing of angle at top and fixing of same at proper position between two pillers,column with same grade of concrete (pre stressed with 7 nos. of STS wire) of size 1830mmx150mm x 150mm with provision of edge groove (50mmx50mm) on two oposit phase for holding precst slab and pannal, and supply and fixing of Y angle member including concertina and barbed wire including all T&P, Labour, carriage and as per direction engineer-in-charge | 488 | Rm | 3,600 ₹17.6 L | 3,073 ₹15.0 L | 3,053.5 ₹14.9 L | 1,307.37 ₹6.4 L |
| 4.00 | finishing wall with water proof cement paint of approved make and quality on new work with two coat to give and even shade including supply of all material labour and T&P etc required for proper completion of work | 1,828.14 | Sqm | 6 ₹10,968.84 | 47 ₹85,922.58 | 46.5 ₹85,008.51 | 231.39 ₹4.2 L |
| 5.00 | P.C.C. 1:3:6 With cement , coarse sand and Brick Ballast 20 to 40 mm size including cost of all materials and labour and t&p etc requred for completion of work. | 1.51 | Cum. | 7,500 ₹11,325 | 6,587 ₹9,946.37 | 6,545.08 ₹9,883.07 | 15,053.35 ₹22,730.57 |
| 6.00 | C.C. 1:2:4 With cement , coarse sand and Brick Ballast 20 to 40 mm size including cost of all materils and labour T&p etc requred for completion of work | 1.26 | Cum. | 8,000 ₹10,080 | 7,461 ₹9,400.86 | 7,413.25 ₹9,340.69 | 15,003.37 ₹18,904.25 |
| 7.00 | M-150 class Brick work in 1:4 Cement Mortor with Cement , coarse sand and Brick including cost of all Labour & Materials T&P etc. required for proper completion of the work. | 4.46 | Cum. | 5,000 ₹22,300 | 5,252 ₹23,423.92 | 5,217.26 ₹23,268.98 | 13,071.51 ₹58,298.94 |
| 8.00 | Cement Plastering 1:4 Cement and coarse sand including all Labour & Materials , T&P etc. required for proper completion of work . | 17.66 | Sqm. | - | 190 ₹3,355.40 | 188.22 ₹3,323.91 | 909.99 ₹16,070.44 |
| 9.00 | Fabircation of mild steel/iron work in grill, gates railing frame including cutting, drilling, welding, rivting and hinges where nessary and fixing inposition including cost of all labour and material T&P etc required for proper completion of work with one coat of red oxide primer | 1,236.96 | Kg. | 60 ₹74,217.60 | 74 ₹91,535.04 | 73.63 ₹91,071.18 | 133.25 ₹1.6 L |
| 10.00 | Painting or varnishing on iron works in small areas with one coat of readymixed primer paint & two coat of approved supier quality mixed paint of clear synthec varnish .The work shall be completed as per direction of engineer in charge. | 28.8 | sqm | 60 ₹1,728 | 89 ₹2,563.20 | 88.35 ₹2,544.48 | 4,709.36 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
29 Sept 2025, 12:00 pmClosed
Executive Engineer
EE HDSC Hardoi
Construction of Boundry Wall Around of Kamrauli Nahar Kothi under the IInd Sub Division of Hardoi Division Sharda Canal Hardoi
2025_UPIDC_1075889_1
03/EE-HDSC/2025-26
Open Tender
Civil Works
60 days
Hardoi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹50,000
EE HDSC Hardoi
26 May 2026
23 Sept 2025
29 Sept 2025
23 Sept 2025
29 Sept 2025
23 Sept 2025
27 Sept 2025
Amount
Cleaning thick jungle and thorney bushes without uprooting
Earth Work in excavation in foundation for Masonary work including all lead & lift including back filling and compaction required for proper completion of the work.
Supplying and installation of steam curv (prestressed concrete of grade M-25 grade with 4 nos. of 4mm STS wire) slab of size 2100mm x 300mm x 50mm with provision for hole as per requirement for fixing of angle at top and fixing of same at proper position between two pillers,column with same grade of concrete (pre stressed with 7 nos. of STS wire) of size 1830mmx150mm x 150mm with provision of edge groove (50mmx50mm) on two oposit phase for holding precst slab and pannal, and supply and fixing of Y angle member including concertina and barbed wire including all T&P, Labour, carriage and as per direction engineer-in-charge
finishing wall with water proof cement paint of approved make and quality on new work with two coat to give and even shade including supply of all material labour and T&P etc required for proper completion of work
P.C.C. 1:3:6 With cement , coarse sand and Brick Ballast 20 to 40 mm size including cost of all materials and labour and t&p etc requred for completion of work.
C.C. 1:2:4 With cement , coarse sand and Brick Ballast 20 to 40 mm size including cost of all materils and labour T&p etc requred for completion of work
M-150 class Brick work in 1:4 Cement Mortor with Cement , coarse sand and Brick including cost of all Labour & Materials T&P etc. required for proper completion of the work.
Cement Plastering 1:4 Cement and coarse sand including all Labour & Materials , T&P etc. required for proper completion of work .
Fabircation of mild steel/iron work in grill, gates railing frame including cutting, drilling, welding, rivting and hinges where nessary and fixing inposition including cost of all labour and material T&P etc required for proper completion of work with one coat of red oxide primer
Painting or varnishing on iron works in small areas with one coat of readymixed primer paint & two coat of approved supier quality mixed paint of clear synthec varnish .The work shall be completed as per direction of engineer in charge.
Writing latter on iron gate & pillers supier above 50mm size but below 80mm size .The work shall be completed as per direction of engineer in charge.
MS. SAI CONSTRUCTION AND SUPPLIERS (BID ID -5571555)
JAI MAHAKAL CONSTRUCTION (BID ID -5570326)
NIRBHAY KUMAR MISHRA (BID ID -5569990)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf