| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | ₹29.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹29.8 LSame as L1Rejected-AOC | ₹29.8 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹29.8 LSame as L1Rejected-AOC AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹29.8 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹29.8 LSame as L1Rejected-AOC | ₹29.8 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹29.8 LSame as L1Rejected-AOC | ₹29.8 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹29.8 L
EMD Value
₹29,800
Closing Date
11 May 2026, 5:00 pmClosed
Executive Engineer, CD-II
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Reconstruction of road and drain with cover slab from Bena Babu shop to Amu Mahapatra res in Ward No. 28
2026_ORULB_127815_8
MC(CMC)CTC_Div-II_No.3/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹29,800
Yes
24 Jul 2026
30 Apr 2026
14 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of R.CC Slab from Drain and refixing the same after the work is over etc. | 45 | Each | 65 | ₹2,925 |
| 2 | Dismantling of RCC Wark from existing RCC Work including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labour, materials, T&P required etc. complete as per the direction of Engineer-in-charge. | 54.4 | Cum | 1,697 | ₹92,316.8 |
| 3 | Dismantling of C.C work from existing C.C Work including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labour, materials, T&P required etc. complete as per the direction of Engineer-in-charge. | 90.69 | Cum | 858.6 | ₹77,866.43 |
| 4 | Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with all leads and lifts including dressing | 174.89 | Cum | 299.52 | ₹52,383.05 |
| 5 | Supplying and filling the foundation trenches in si o oudtoni pc & plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost coveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of EIC | 94.16 | Cum | 612.7 | ₹57,691.83 |
| 6 | Providing cement concrete for unreinforced cement concrete works of proportion (1:3:6) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for days | 74.44 | Cum | 6,393.8 | ₹4,75,954.47 |
| 7 | RCC work of M20 having minimum compressive strength (working stress) 200kg/cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with 1.5. 456 and LS 516 using 12mm to 20mm size (1/2" to 3/4") crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills Drain Wall Top Portion (15 cm) | 2.16 | Cum | 6,552.1 | ₹14,152.54 |
| 8 | Wall | 46.26 | Cum | 6,562.1 | ₹3,03,562.75 |
| 9 | Pre Cast Slab | 22.68 | Cum | 6,552.1 | ₹1,48,601.63 |
| 10 | Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/bent up M.S. rods/Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 guage binding wire required for R.C.C. work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wires will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S. rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the | 37.51 | Qntl | 9,395.3 | ₹3,52,417.7 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_589261.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .