Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹29.9 L
EMD Value
₹59,732
Closing Date
5 Feb 2020, 3:00 pmClosed
EXECUTIVE ENGINEER
EE/SD-3/DDA NEHRU PLACE
Environmental Management services for liquid Management using Bio technology and by providing floating Wetland at Oxidation ponds in Archeological park Mehrauli (Specialized work).
2020_DDA_540607_1
48/EE/SD-3/DDA/2019-20.
Open Tender
Civil Works
Item Rate
60 days
EE/SD-3/DDA NEHRU PLACE
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹59,732
25 Feb 2020
31 Jan 2020
6 Feb 2020
31 Jan 2020
5 Feb 2020
31 Jan 2020
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Providing and installation of floating Wetland at site of water body i/c supply of material viz. sponge foam, geosynthetic nonwoven fabric, concrete block, U-PVC pipes, PVC fibrenet, specified group of plants, bio-culture housing, GI wire, etc and assembling as per drawing / approved design and as per directions of engineer-in-charge. The cost shall include maintenance of Wetland including (replacement of plants or Wetland if required) for 730 days).
Providing Liquid Management for 3 Oxidation Pond using Suitable Microbial Culture for treatment of drain/sewer effluent available in powder/Liquid form as per manufacturer's specifications.Initial/ Maintenance dosing of Suitable Microbial Culture as Schedule and filter media bio-balls @ 0.33cum per month for initial 3month. Removal of odor, algae, reduction of BOD, COD, TSS, PH, value Nitrates, ammonia, phosphates, sulphates, turbidity, obnoxious odor up to the parameters prescribed by DPCC for irrigation purpose through biological treatment. Removal of floating plants & other material like empty bottles, dead leaves / trees, polythene bags. etc. from the Oxidation Pond. (1 labors will deployed per day i/e dredging / spraying arrangements and all safety equipment arrangements will be made by the agency) complete. This includes the cost of product, labor, equipment needed for treatment, the product should be non-pathogenic & should not have any adverse effect on agricultural & aquatic culture all complete as per direction of Engineer-in-charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .