Tender Value
₹96.5 L
EMD Value
₹97,000
Closing Date
20 Feb 2026, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
DRDA PUDUKKOTTAI
Package No. 12 - Strengthening of the road from Vembankudi west to Vembankudi East Link road km 0/0 - 1/711 in Vembankudi East Panchayat, Aranthangi Panchayat Union in Pudukkottai District under NABARD RIDF - 2026-27
2026_RDTN_656868_1
PDK/NABARD/26-27ATG/12
Open Tender
Civil Works - Roads
Item Rate
180 days
ARANTHANGI
Please Refer Tender Document
4 documents required · 4 mandatory
₹0
₹97,000
DRDA PUDUKKOTTAI
2 Jun 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
17 Feb 2026
Strengthening of the road from Vembankudi west to Vembankudi East Link road km 0/0 - 1/711 in Vembankudi East Panchayat.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel for side berms including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp
Construction of RCC Pipe culvert 1.50m span slab culvert Ch-780
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation.
Filling with M sand including cost and conveyance of sand to work site including all labour charges for filling etc complete - rate for 1 cu.m
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Below sill
Above sill
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
CC 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Collection and supply of course gravel including cost and conveyance to road site and stacking to departmental gauge for premeasurement etc., completed.
Construction of RCC Pipe culvert 1.50m span slab culvert Ch-950m
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation.
Filling with M sand including cost and conveyance of sand to work site including all labour charges for filling etc complete - rate for 1 cu.m
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Below sill
Above sill
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
CC 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Collection and supply of course gravel including cost and conveyance to road site and stacking to departmental gauge for premeasurement etc., completed.
Construction of RCC pipe culvert 900mm dia Ch-1060m
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M.sand including cost and conveyance and all labour charges etc completed.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3mm laid over w.joints of size 10 x 6.50cm spaced 75mm c/c complying with standard specification.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Provision for Kilometerstone
Provision for Hectameterstone
Provision for Signboard
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
12_ARANTHANGI_TENDERDOCUMENT.pdf
Tender Documents • 1.39 MB
BOQ_787714.xls
BOQ • 0.37 MB
9Date_corrigendum_II_NABARD2026-27.pdf
PDF • 0.07 MB
2Date_corrigendumNABARD_26_27.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .