Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹319.7 CrFinancial bid opened Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. C 88 RDC RAJ NAGAR GHAZIABAD 201002 U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201002 | Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | L1 | Financial bid opened | |
| 2 | L2₹322.5 Cr+₹2.8 Cr (0.87%) Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | L2 | - | |
| 3 | L3₹323.2 Cr+₹3.5 Cr (1.10%) Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | L3 | - | |
| 4 | L4₹323.4 Cr+₹3.7 Cr (1.16%) Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. DEE VEE HOUSE MAULSHREE VIHAR INFRONT OF BABYLON INTERNATIONAL VIP ROAD RAIPUR 492006 CHHATTISGARH | Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | L4 | - | |
| 5 | L5₹328.4 Cr+₹8.7 Cr (2.72%) Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. 2 LETTER OF A W ARD N O N B C C E D CPG 2022 11 05 DATED 04 02 2022 3 LETTER N O N B C C E D CPG 2022 11 06 DATED 04 02 2022 | Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. | L5 | - |
| Sl No | Description | Qty | Unit | ASHOKA BUILDCON LIMITED L12 | B G SHIRKE CONSTRUCTION TECHNOLOGY PVT LTD. L9 | DEE VEE PROJECTS LIMITED L4 | Hombale Constructions and Estates Pvt Ltd L6 | Inderjit Mehta Constructions Pvt Ltd L11 | KAMLADITYYA CONSTRUCTION PVT. LTD. L13 | RAMALINGAM CONSTRUCTION COMPANY PRIVATE LIMITED L2 | Renaatus Projects Private Limited L8 | M/s. Relcon Infraprojects Ltd. L14 | SAM (INDIA) BUILTWELL PVT LTD L10 | SMS LIMITED L7 | SWADESHI CIVIL INFRASTRUCTURE PVT. LTD. L3 | Varindera Constructions Ltd. L5 | EMS Infracon Pvt Ltd L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil + Electrical and Mechanical | - | - | 3.95 ₹3,84,23,74,522.49 | -4.3 ₹3,53,74,24,163.56 | -12.5 ₹3,23,43,21,988.63 | -7.5 ₹3,41,91,40,387.98 | 3.6 ₹3,82,94,37,234.53 | 8.37 ₹4,00,57,53,987.51 | -12.75 ₹3,22,50,81,068.66 | -5.9 ₹3,47,82,82,275.77 | 13.5 ₹4,19,53,77,665.25 | 1 ₹3,73,33,31,666.87 | -6.3 ₹3,46,34,96,803.82 | -12.55 ₹3,23,24,73,804.63 | -11.15 ₹3,28,42,22,956.45 | -13.5 ₹3,19,73,58,308.76 Lowest |
Tender Value
₹369.6 Cr
EMD Value
₹3.8 Cr
Closing Date
25 Nov 2022, 3:00 pmClosed
AE(C)-8
Mr. Ajeet Nandu Nikam
Office of Executive Engineer and Senior Manager II CGO Building Navi Mumbai
Construction of 354 nos. staff quaters Hostel Building Academic Block for Reserve Bank of India at plot No.1 Sector 7, CBD Belapur Kharghar Navi Mumbai. Subwork/Packages: Package 1: Construction of 1 no Grade D Tower 4 nos Grade BC Tower 4 Nos Grade A tower ZTC Hostel Building Academic Block Club House with Swimming pool internal Electrical installation lifts firefighting and Fire Alarm DG Set STP Substion and Pump House Rain Water Harvesting and Deveploment work for RBI CBD Belapur Navi Mumbai
21015
05/NIT/EE &SM-II/CE cum ED Mumbai /2022-23
OPEN
Civil Works - Buildings
NCB
26 months
Mumbai, Maharashtra
4 documents required · 4 mandatory
₹3.8 Cr
Confernce Room office of CE cum ED at 7th Floor CGO complex CBD Belapur Navi Mumbai
25 Nov 2022
30 Sept 2022
25 Nov 2022
25 Nov 2022
6 Oct 2022
7 Oct 2022
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
1 Grade A_1 Grade A- Tower Architectural_pagenumber.pdf
document • 16.78 MB
1 Grade A_2 Grade A-Plumbing_pagenumber.pdf
document • 5.96 MB
1 Grade A_3 Grade A - Structural_pagenumber.pdf
document • 17.80 MB
1 Grade A_4 RBI Electrical -Grade A_pagenumber.pdf
document • 5.38 MB
1 Grade A_5 RBI Fire- Grade A_pagenumber.pdf
document • 2.26 MB
grade BC part 1_1 Grade CB -Architectural_pagenumber.pdf
document • 18.59 MB
grade BC part 1_2 Grade CB - Plumbing_pagenumber.pdf
document • 10.04 MB
grade BC part 2_3 Grade CB -Structural_pagenumber.pdf
document • 24.38 MB
grade BC part 2_4 RBI Electrical -Grade CB_pagenumber.pdf
document • 7.98 MB
grade BC part 2_5 RBI Fire- Grade CB_pagenumber.pdf
document • 3.81 MB
3 Grade D_1 tower D -Architectural_pagenumber.pdf
document • 15.04 MB
3 Grade D_2 Grade D -Plumbing_pagenumber.pdf
document • 6.33 MB
3 Grade D_3 Grade D - Structural_pagenumber.pdf
document • 18.14 MB
3 Grade D_4 RBI Electrical -Grade D_pagenumber.pdf
document • 3.57 MB
3 Grade D_5 RBI Fire- Grade D_pagenumber.pdf
document • 2.41 MB
Hostel Part 1_2 Hostel- Plumbing_pagenumber.pdf
document • 7.75 MB
Hostel Part 1_3 Hostel -Structural_pagenumber.pdf
document • 17.80 MB
Hostel Part 2_1 Hostel Block - Architectural_pagenumber.pdf
document • 20.26 MB
Hostel Part 2_4 RBI Electrical -Hostel Block_pagenumber.pdf
document • 12.70 MB
Hostel Part 2_5 RBI Fire = Hostel_pagenumber.pdf
document • 3.37 MB
Academic Part 1_1 Academic Block -Architectural_pagenumber.pdf
document • 14.91 MB
Academic Part 1_2 Academic Block -Plumbling_pagenumber.pdf
document • 15.94 MB
Academic Part 2_3 Academic -Structural_pagenumber.pdf
document • 9.23 MB
Academic Part 2_4 RBI Electrical -Academic Block_pagenumber.pdf
document • 20.54 MB
Academic Part 2_5 RBI Fire- Academic_pagenumber.pdf
document • 1.14 MB
6 Club House_1 Club House - Architectural_pagenumber.pdf
document • 14.74 MB
6 Club House_2 Club House - Plumbing_pagenumber.pdf
document • 3.09 MB
6 Club House_3 Club - Structural_pagenumber.pdf
document • 6.50 MB
6 Club House_4 RBI ELectrical - Club House_pagenumber.pdf
document • 3.01 MB
6 Club House_5 RBI Fire- Club house_pagenumber.pdf
document • 0.95 MB
7 Care Taker_1 Caretaker Block -Architectural_pagenumber.pdf
document • 8.62 MB
7 Care Taker_2 Caretaker Block - Plumbing_pagenumber.pdf
document • 1.99 MB
7 Care Taker_3 Caretaker - structural_pagenumber.pdf
document • 5.99 MB
7 Care Taker_4 RBI Electrical =CAETAKER BLOCK_pagenumber.pdf
document • 3.92 MB
7 Care Taker_5 RBI Fire -Caretaker + Security block_pagenumber.pdf
document • 0.80 MB
Site+%3D+Architectural+Drawing.pdf
document • 36.02 MB
SIte+%3D+Landscape.pdf
document • 34.04 MB
2+Site+-+Plumbing_pagenumber.pdf
document • 16.39 MB
Site- structural electrical fire drawings_3 Site - Structural_pagenumber.pdf
document • 11.80 MB
Site- structural electrical fire drawings_4 Site -Electrical_pagenumber.pdf
document • 19.92 MB
Site- structural electrical fire drawings_5 RBI Fire - Site_pagenumber.pdf
document • 5.85 MB
9++RBI+Soil+Report.pdf
document • 20.43 MB
RBI+Final+NIT.pdf
document • 13.28 MB
Authorization letter_compressed.pdf
document
Final RBI Corrigendum No 03.pdf
document
CORRIGENDUM 02.pdf
document
RBI corrigendum 2.pdf
document
Authorized Letter.pdf
document
Authorized Letter.pdf
document
Corrigendum No 1.pdf
document
Authorized Letter.pdf
document
Addendum RBI final.pdf
document
Authorized Letter.pdf
document
minutes of Pre bid meeting.pdf
document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .