Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC | ₹17.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.0 L+₹13,063 (0.73%)Rejected-Finance | ₹18.0 L+₹13,063 (0.73%) | L2 | Rejected-Finance L2 |
| 3 | L3₹19.8 L+₹1.8 L (10.3%)Rejected-Finance | ₹19.8 L+₹1.8 L (10.3%) | L3 | Rejected-Finance L3 |
| 4 | L4₹20.5 L+₹2.6 L (14.4%)Rejected-Finance | ₹20.5 L+₹2.6 L (14.4%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting Criteria |
Tender Value
₹13.3 L
EMD Value
₹26,680
Closing Date
26 Sept 2018, 11:30 amClosed
Commander 760 BRTF
760 BRTf C/o 56 APO
supply and stacking of stone metal 40 mm size and river sand for permanent work between km 0.00 to km 21.00 on NRT road in 99 RCC sector under 760 BRTF project Beacon in Jammu and Kashmir state
2018_BRO_379140_1
CDR760TF/09/2018-19
Open Tender
Civil Works - Roads
Supply
90 days
99 RCC
supply and stacking of stone metal 40 mm size and river sand for permanent work between km 0.00 to km 21.00 on NRT road in 99 RCC sector under 760 BRTF project Beacon in Jammu and Kashmir state
14 documents required · 14 mandatory
₹0
₹26,680
Yes
24 Mar 2020
5 Sept 2018
27 Sept 2018
6 Sept 2018
26 Sept 2018
10 Sept 2018
7 Sept 2018 - 8 Sept 2018
Amount
Materials to be supplied between Km 0.00 to Km 21.00 on NRT road or as directed by Engr- In- Charge
Stone Metal 40 MM
River Sand
M/S SAGINA ENTERPRISES
M/S BEIGH TRANSPORTER AND CONTRACTOR
M/s ABDUL RASHID KABO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .