| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L-1 | Accepted-AOC As per tender committee recommendation and approval of competent authority |
| 2 | L-2₹2.3 Cr+₹24.4 L (11.8%)Rejected-Finance | ₹2.3 Cr+₹24.4 L (11.8%) | L-2 | Rejected-Finance As per auto generated BOQ Comparative Chart, recommendation of TC and approval of competent authority |
| 3 | L-3₹2.3 Cr+₹25.2 L (12.1%)Rejected-Finance AT PO CHINTA MANI NIWAS BESIDE CENTRAL SCHOOL RAJENDRA NAGAR COLONY PO HEHAL DIST RANCHI JHARKHAND 834005 | RANCHI | RANCHI | JHARKHAND | 834005 | ₹2.3 Cr+₹25.2 L (12.1%) | L-3 | Rejected-Finance As per auto generated BOQ Comparative Chart, recommendation of TC and approval of competent authority |
| 4 | L-4₹2.4 Cr+₹28.0 L (13.5%)Rejected-Finance AT PO GARILONG TANDWA DIST CHATRA JHARKHAND 825321 | CHATRA | JHARKHAND | 825321 | ₹2.4 Cr+₹28.0 L (13.5%) | L-4 | Rejected-Finance As per auto generated BOQ Comparative Chart, recommendation of TC and approval of competent authority |
| 5 | L-5₹2.4 Cr+₹33.9 L (16.4%)Rejected-Finance AT PO BARALOTA BY PASS ROAD DALTONGANJ DISTT PALAMU JHARKHAND 822121 | GARHWA | JHARKHAND | 822121 | ₹2.4 Cr+₹33.9 L (16.4%) | L-5 | Rejected-Finance As per auto generated BOQ Comparative Chart, recommendation of TC and approval of competent authority |
Tender Value
₹2.9 Cr
EMD Value
₹3.7 L
Closing Date
15 Apr 2024, 10:00 amClosed
Staff Officer (Civil), Magadh-Sanghmitra Area
Office of the General Manager, Magadh-Sanghmitra Area, Bachra, Dist Chatra, Jharkhand 829201
Construction of PQC road from check post no. 11 towards check post no. 12 under Magadh OCP of M-S Area
2024_CCL_306029_1
GMMS/SOC/Tender/23-24/148/1388
Open Tender
Civil Works - Roads
Item Rate
150 days
Magadh OCP, Magadh-Sanghmitra Area
As per NIT
5 documents required · 5 mandatory
₹3.7 L
31 Jul 2024
29 Mar 2024
16 Apr 2024
30 Mar 2024
15 Apr 2024
30 Mar 2024
30 Mar 2024 - 8 Apr 2024
Amount
Part A: PQC Road Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (excluding Royalty @ Rs. 24.00 per Cum but excluding watering, rolling & compaction)
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) :Rolling with vibratory roller
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) : for grading- II Material
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) : for grading- III Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Part B: Box Culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil. Mechanical Means. Depth upto 3 m
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.:PCC Grade M15
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications :RCC Grade M25. With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Part C: RCC Drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Mechanical Means (Depth upto 3 m).
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.:PCC Grade M15
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications :RCC Grade M20. With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Part D: RCC toe wall Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Mechanical Means (Depth upto 3 m).
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.:PCC Grade M15
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications :RCC Grade M20. With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Total impact of GST for the purpose of CTC
M/S Jageshwar Gope & Maa Construction (JV)
M/S MAA LAKSHMI ENTERPRISES
M/S SANJEEV PRASAD
M/S VIKASH KUMAR TIWARI
M/S S K MISHRA AND SONS
M/S ASHOK KUMAR
prakash construction company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .