Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 LAccepted-AOC VILL THESSA PO PS THRIZINO DISTT WEST KAMENG ARUNACHAL PRADESH PIN 79001 | THRIZINO | WEST KAMENG | ARUNACHAL PRADESH | 79001 | ₹48.0 L Quoted ₹48.1 L | L1 | Accepted-AOC DUE L1 BIDDER |
| 2 | L2₹50.0 L+₹2.0 L (4.08%)Rejected-Finance | ₹50.0 L+₹2.0 L (4.08%) | L2 | Rejected-Finance REJECTED DUE TO L2 BIDDER |
| 3 | L3₹51.0 L+₹3.0 L (6.16%)Rejected-Finance | ₹51.0 L+₹3.0 L (6.16%) | L3 | Rejected-Finance REJECTED DUE TO L2 BIDDER |
| 4 | L4₹51.6 L+₹3.5 L (7.25%)Rejected-Finance | ₹51.6 L+₹3.5 L (7.25%) | L4 | Rejected-Finance REJECTED DUE TO L2 BIDDER |
| 5 | L5₹52.5 L+₹4.4 L (9.14%)Rejected-Finance | ₹52.5 L+₹4.4 L (9.14%) | L5 | Rejected-Finance REJECTED DUE TO L2 BIDDER |
| Sl No | Description | Qty | Unit | M/S SM ANSARI L5 | M/S R P M CONSTRUCTION L7 | M/S DKT CONSTRUCTION L4 | M/S RAM AWADH SINGH L6 | Larza wangpu agencies L3 | M/S SS ENTERPRISES L1 | M/S SUNRISE CONSTRUCTION AND CO L2 | M/S N D ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as directed | 191.82 | Cum | 2,000 ₹3,83,640 | 2,200 ₹4,22,004 | 2,150 ₹4,12,413 | 2,200 ₹4,22,004 | 2,100 ₹4,02,822 | 1,900 ₹3,64,458 Lowest | 2,000 ₹3,83,640 | 2,190 ₹4,20,085.8 |
| 2.00 | Demolition of reinforced cement Concrete of any description and in any position not otherwise specifically provided for,complete all as specified and directed. | 4 | Cum | 2,000 ₹8,000 | 2,200 ₹8,800 | 2,200 ₹8,800 | 2,100 ₹8,400 | 2,100 ₹8,400 | 1,900 ₹7,600 Lowest | 2,000 ₹8,000 | 2,200 ₹8,800 |
| 3.00 | Demolition of cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and directed. | 4 | Cum | 1,700 ₹6,800 | 1,800 ₹7,200 | 1,700 ₹6,800 | 1,700 ₹6,800 | 1,700 ₹6,800 | 1,640 ₹6,560 Lowest | 1,700 ₹6,800 | 1,900 ₹7,600 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out in all kind of soil and disposal of excavated earth lead upto 50 m and lift upto 1.5m complete all as specified and directed by Engineer-in-charge. | 90 | Cum | 250 ₹22,500 | 210 ₹18,900 | 220 ₹19,800 | 245 ₹22,050 | 200 ₹18,000 Lowest | 220 ₹19,800 | 220 ₹19,800 | 220 ₹19,800 |
| 5.00 | Earth work in excavation by mechanical means any kind of soil (Hydraulic excavator)/ in foundation, trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, complete all as specified and directed by Engineer-in-charge. | 30 | Cum | 320 ₹9,600 | 320 ₹9,600 | 330 ₹9,900 | 350 ₹10,500 | 300 ₹9,000 Lowest | 300 ₹9,000 Lowest | 320 ₹9,600 | 340 ₹10,200 |
| 6.00 | M&L for PCC 1:2:4 type B2 (using 40mm graded stone aggregate ) as in foundation bed concrete, complete all as specified and directed. | 89.52 | Cum | 9,100 ₹8,14,632 | 8,800 ₹7,87,776 | 8,600 ₹7,69,872 | 9,000 ₹8,05,680 | 8,600 ₹7,69,872 | 8,500 ₹7,60,920 Lowest | 8,550 ₹7,65,396 | 8,800 ₹7,87,776 |
| 7.00 | M&L for walling of random rubble uncoursed, well bonded,bedded and solidly hearted built in CM 1:6, complete all as specified and directed by Engineer-in-charge. | 292.56 | Cum | 5,900 ₹17,26,104 Lowest | 6,100 ₹17,84,616 | 6,200 ₹18,13,872 | 6,000 ₹17,55,360 | 6,100 ₹17,84,616 | 5,900 ₹17,26,104 Lowest | 6,000 ₹17,55,360 | 6,200 ₹18,13,872 |
| 8.00 | M&L for walling of random rubble uncoursed (stone retrived from demolition), well bonded,bedded and solidly hearted built in CM 1:6, complete all as specified and directed by Engineer-in-charge.
NOTE: Stone retrived from demolition to be used for RR masonry. | 50 | Cum | 4,100 ₹2,05,000 | 4,000 ₹2,00,000 | 3,800 ₹1,90,000 | 4,000 ₹2,00,000 | 3,770 ₹1,88,500 | 3,600 ₹1,80,000 Lowest | 3,700 ₹1,85,000 | 4,400 ₹2,20,000 |
| 9.00 | Extra over stone for hammer dressing with maximum depression on face of stone wall and dressing of face bed and joints of random rubble walling, uncoursed or brought upto courses not exceeding 40 mm depression (Lime or Sand stone ), complete all as specified and directed . | 340.12 | Sqm | 450 ₹1,53,054 | 450 ₹1,53,054 | 450 ₹1,53,054 | 445 ₹1,51,353.4 | 450 ₹1,53,054 | 400 ₹1,36,048 Lowest | 440 ₹1,49,652.8 | 460 ₹1,56,455.2 |
| 10.00 | M&L for hand packing with broken stone/ boulder behind backing of retaining wall,in layers etc complete all as specified and directed by Engineer-in-charge. | 5.67 | Cum | 2,480 ₹14,061.6 | 2,400 ₹13,608 | 2,300 ₹13,041 | 2,500 ₹14,175 | 2,290 ₹12,984.3 | 2,200 ₹12,474 Lowest | 2,300 ₹13,041 | 2,450 ₹13,891.5 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
24 Sept 2025, 9:00 amClosed
GE TENGA
GE Tenga C/o 99 APO PIN- 790116
REPAIR TO RR MASONRY, RCC WALLS, BUTTERS WALL AND PRECAST PANELS WITH CONNECTED WORKS AT PH- III AREA (U AND L DAHUNG, DUM DUM NALLA, MH, MES OFFICES AND MESSES) OF AGE B/R UNDER GE TENGA.
2025_MES_729035_1
8057/E8
Open Tender
Civil Works
Item Rate
270 days
GE TENGA
PLS REF TO NIT.
7 documents required · 7 mandatory
₹500
GE TENGA
₹96,000
Yes
3 Nov 2025
3 Sept 2025
25 Sept 2025
3 Sept 2025
24 Sept 2025
17 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .