Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
15 Apr 2026, 1:00 pmClosed
VDO PRASHASAK AAO AEN
Gram Panchayat Dunkar
Ra.u.ma.vi. benatha jogliya (bidasar) me kaksha kaksh nirman may baramda gram panchayat dunkar
2026_PRD_550276_1
G.P Dunkar /2026-27/01-05 DATE 06.04.2026
Open Tender
Civil Works
Percentage
90 days
Gram Panchayat Dunkar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Prashasak Gram Panchayat Dunkar
₹17,000
Yes
7 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungal clearance including remove 15 cm top soil and small plants and bushes in normal soil. | 150 | SQM | 7.81 | ₹1,171.5 |
| 2 | Earth work in foundation excavation up to 1.5m. Ramming bottom, dressing sides. Back filling and disposal of surplus soil with in a lead of 50m. | 18.7 | CUM | 178.46 | ₹3,337.2 |
| 3 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix | 3.12 | CUM | 3,514.97 | ₹10,966.71 |
| 4 | Stone masonary work in foundation and plinth CM 1:6 | 23.05 | CUM | 3,416.01 | ₹78,739.03 |
| 5 | Brick work in super structure using bricks of class designation-75 in CM 1:6 | 31.88 | CUM | 4,787.66 | ₹1,52,630.6 |
| 6 | Carriage of earth-lead Two KM | 55.68 | CUM | 121.16 | ₹6,746.19 |
| 7 | Earth work in filling with ordinary soil including levelling and planning | 55.68 | CUM | 86.36 | ₹4,808.52 |
| 8 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, structring and reinforcement in 1:1:5:3 (1 cement:1.5 course sand: 3-graded stone aggregate 20 mm nominal size) | 7.03 | CUM | 5,761.62 | ₹40,504.19 |
| 9 | Providing and fabricating reinforcement for RCC work including straightening, cutting ,bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformend (IS: 1139) cold twisted (IS:1786) | 492.1 | KG | 92.78 | ₹45,657.04 |
| 10 | Centering and shuttering with plywood or steel sheets icluding strutting, propping, bracing both ways with wooden members and removal of from work | 40.4 | SQM | 286.6 | ₹11,578.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
2.pdf
Tender Documents • 2.86 MB
BOQ_980938.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .