Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81,170.47Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹84,527.20+₹3,356.73 (4.14%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹84,535.66+₹3,365.19 (4.15%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
30 Sept 2026, 4:00 pmClosed
Ex. Engineer RnB Division Pahalgam
Office of the Ex. Engineer RnB Division Pahalgam
Minor Repairment of Boys High school Katsoo
2026_PWDJK_325010_1
ENIT NO 71 OF 2026-27
Open Tender
Civil Works
Percentage
30 days
Pahalgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Centralized Designated Pooling Bank Account
₹2,000
8 Oct 2026
17 Sept 2026
1 Oct 2026
17 Sept 2026
30 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 1.91 | CUM | 1,289.14 | ₹2,462.26 |
| 2 | Eangement of jcb for levelling and removing of big boulders and their disposal | 2 | No | 1,016.95 | ₹2,033.9 |
| 3 | P/L Stone solling of Specified size duely hand packed incl. all carriages and loading/unloading. | 0.42 | CUM | 847.46 | ₹355.93 |
| 4 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:4:8 mix. | 0.21 | CUM | 4,561.36 | ₹957.89 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone agg 20 mm N. size) | 2.17 | CUM | 6,828.05 | ₹14,816.87 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 194.99 | kg | 108.01 | ₹21,060.87 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 3.35 | SQM | 251.04 | ₹840.98 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for columns | 5.02 | SQM | 551.4 | ₹2,768.03 |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Welded | 324 | kg | 121.16 | ₹39,255.84 |
stage.html
html • 0.02 MB
finance_1097003.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1097003.xls
BOQ • 0.33 MB
ext713rd.pdf
PDF • 0.65 MB
ext2nd71.pdf
PDF • 0.65 MB
71.pdf
PDF • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .