Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance SARCH GANDERBAL J K 191131 | GANDERBAL | JAMMU AND KASHMIR | 191131 | Admitted-Finance |
Tender Value
₹13.5 L
EMD Value
₹27,000
Closing Date
10 Oct 2020, 12:00 pmClosed
Executive Engineer Jal Shakti Mech Div sgr
Executive Engineer Jal Shakti Mech Div sgr
Rate contract for Electrical Works for the year 2020-21 at Lift Water Supply Scheme of VIP Belt. DOWN TOWN for PHE Mech. City Right Sub Division
2020_PHE_105563_1
E-NIT No-E- 41 of 9/2020
Open Tender
Electrical and Maintenance Works
Item Rate
3 days
WSS vip
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer Jal Shakti Mech Div sgr
₹27,000
Yes
17 Oct 2020
28 Sept 2020
10 Oct 2020
28 Sept 2020
10 Oct 2020
28 Sept 2020
Amount
Cost on account of Rewinding/Repairs/Replacements to the parts of 1/3 phase, 2850RPM Submersible Motors as per annexure A
Complete rewinding of 2.00 HP, 1 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Cost on account of Copper wire used in rewinding the motor.
Cost On account of Dismantling, extraction of the damaged windings from slots, setting right the fused slots & their segregation to ensure the proper/safe rewinding. The job includes the Skilled labour, insulated paper and pvc sleeves used during rewinding and testing of motor at site after conducting the necessary repairs
To and Fro carriage from site to workshop & back to site including head loads and lifts etc
1.4 P/Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
Cost on account of Deduction of old scrap (80% Approx. of original wire)
Complete rewinding of 5.00 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Copper wire used in rewinding the motor.
Dismantling, extraction of the damaged windings from slots, setting right the fused slots & their segregation to ensure the proper/safe rewinding. Skilled labour, insulated paper and pvc sleeves used during rewinding and testing of motor at site after conducting the necessary repairs.
To and Fro carriage from site to workshop & back to site including head loads and lifts etc.
P/Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
Cost on account of Deduction of old scrap (80% of original wire)
Complete rewinding of 7.50 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Complete rewinding of 7.50 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Copper wire used in rewinding the motor.
Dismantling, extraction of the damaged windings from slots, setting right the fused slots & their segregation to ensure the proper/safe rewinding. Skilled labour, insulated paper and pvc sleeves used during rewinding and testing of motor at site after conducting the necessary repairs.
To and Fro carriage from site to workshop & back to site including head loads and lifts etc.
3.4 P/Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
Cost on account of Deduction of old scrap (80% of original wire)
Complete rewinding of 10 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Copper wire used in rewinding the motor.
Dismantling, extraction of the damaged windings from slots, setting right the fused slots & their segregation to ensure the proper/safe rewinding. Skilled labour, insulated paper and pvc sleeves used during rewinding and testing of motor at site after conducting the necessary repairs.
To and Fro carriage from site to workshop & back to site including head loads and lifts etc.
4.4 P/Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
Cost on account of Deduction of old scrap (80% of original wire)
Complete rewinding of 12.5 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Copper wire used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding.
P/fitting of the racer/rachet plate as per sample after dismantling of the damaged one.
Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
To and Fro carriage from site to workshop & vice- versa. The job includes its installation & testing at full load at site.
Cost on account of Deduction of old scrap (80% of original wire)
Complete rewinding of 15 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Copper wire used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding.
3 P/fitting of the racer/rachet plate as per sample after dismantling of the damaged one.
Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
To and Fro carriage from site to workshop & vice- versa. The job includes its installation & testing at full load at site.
Cost on account of Deduction of old scrap (80% of original wire)
Complete rewinding of 20 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Cost on account of Copper wire used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding.
P/fitting of the racer/rachet plate as per sample after dismantling of the damaged one.
4 Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
To and Fro carriage from site to workshop & vice- versa. The job includes its installation & testing at full load at site.
6 Cost on account of Deduction of old scrap (80% of original wire)
Complete rewinding of 25 HP, 3 phase, 2900 rpm submersible motor by way of using PVC insulated copper wire of suitable gauge and quality after dismantling of damaged winding, cleaning of the slots etc. The details of rewinding are as under:-
Cost on account of Copper wire used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding.
P/fitting of the racer/rachet plate as per sample after dismantling of the damaged one.
Fabrication/Fitting of Non-ferrous GM bearing bushes of size required as per sample out of GM bar to be fitted inside the lower and upper housings of the motor assembly after dismantling of damaged ones.
To and Fro carriage from site to workshop & vice- versa. The job includes its installation & testing at full load at site.
Cost on account of Deduction of old scrap (80% Approx. of original wire)
Cost on Account of Detailed repairs & replacements of parts of Horizontal Motors; Annexure 'B'
Complete rewinding of 5 HP, 3 phase, 1440 rpm Horizontal motor by way of using copper wire of suitable gauge and quality after dismantling of damaged windings. The details are as under:-
Cost on account of Copper Wire to be used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding. The job includes varnishing & proper drying after the rewinding.
Ball Bearings used on driving & non driving end (6306 &6307)
To & fro carriage from site to workshop & back its installation after refitting the unit & its testing on full load at site
Cost on account of Deduction of old scrape @80% of original value)
Complete rewinding of 7.5 HP, 3 phase, 1440 rpm Horizontal motor by way of using copper wire of suitable gauge and quality after dismantling of damaged windings. The details are as under:-
Cost on account of Copper Wire to be used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding. The job includes varnishing & proper drying after the rewinding.
Ball Bearings used on driving & non driving end (6306 &6307)
To & fro carriage from site to workshop & back its installation after refitting the unit & its testing on full load at site
Cost on account of Deduction of old scrape @80% of original value)
Complete rewinding of 10 HP, 3 phase, 1440 rpm Horizontal motor by way of using copper wire of suitable gauge and quality after dismantling of damaged windings. The details are as under:-
Cost on account of Copper Wire to be used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding. The job includes varnishing & proper drying after the rewinding.
Ball Bearings used on driving & non driving end (6306 &6307)
To & fro carriage from site to workshop & back its installation after refitting the unit & its testing on full load at site
Cost on account of Deduction of old scrape @80% of original value)
Complete rewinding of 15 HP, 3 phase, 1440 rpm Horizontal motor by way of using copper wire of suitable gauge and quality after dismantling of damaged windings. The details are as under:-
Cost on account of Copper Wire to be used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding. The job includes varnishing & proper drying after the rewinding.
Ball Bearings used on driving & non driving end (6306 &6307)
To & fro carriage from site to workshop & back its installation after refitting the unit & its testing on full load at site
Cost on account of Deduction of old scrape @80% of original value)
Complete rewinding of 20 HP, 3 phase, 1440 rpm Horizontal motor by way of using copper wire of suitable gauge and quality after dismantling of damaged windings. The details are as under:-
Cost on account of Copper Wire to be used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding. The job includes varnishing & proper drying after the rewinding.
Ball Bearings used on driving & non driving end (6306 &6307-Z)
To & fro carriage from site to workshop & back its installation after refitting the unit & its testing on full load at site
Cost on account of Deduction of old scrape @80% of original value)
Complete rewinding of 40 HP, 3 phase, 1440 rpm Horizontal motor by way of using copper wire of suitable gauge and quality after dismantling of damaged windings. The details are as under:-
Cost on account of Copper Wire to be used in rewinding the motor.
Skilled labour for extraction of the damaged windings, cleaning of slots & its rewinding by using the insulated paper and pvc. sleeves etc. used during rewinding. The job includes varnishing & proper drying after the rewinding.
Ball Bearings used on driving & non driving end (6306 &6307)
To & fro carriage from site to workshop & back its installation after refitting the unit & its testing on full load at site
Cost on account of Deduction of old scrape @80% of original value)
Annexure “C” Repairs to MU-G10 FASD starter by way of;
P/F of terminal block 60 A- 03 way
P/F of MU-2 relay 13-21A
P/F of digital ammeter/Voltmeter Assembly 0-20A/ 0-500V
P/F of timer Assembly ET – 100
P/F of SPPR SDz5
P/F of the MU1 contactor Assembly
Repairs/Replacements to the parts of MU-G20 FASD starter by way of;
P/F of terminal block 60 A- 03 way
P/F of MU-2 relay 20-32A
P/F of digital ammeter/Voltmeter Assembly 0-20A/ 0-500V.
P/F of timer Assembly ET – 100
P/F of SPPR SDz5
P/F of the MU2 contactor Assembly
Repairs/ Replacements to the parts of MU-G20 FASD starter by way of;
P/F of terminal block 60 A- 03 way
P/F of MU-2 relay 13-21A
P/F of digital ammeter/Voltmeter Assembly 0-20A/ 0-500V.
4 P/F of timer Assembly ET – 100
5 P/F of SPPR SDz5
P/F of the MU1 contactor Assembly
Repairs/ Replacements to the parts of MU-G20H FASD starter by way of;
P/F of terminal block 60 A- 03 way
P/F of MU- 2 relay 21-32A
P/F of digital ammeter/ Voltmeter Assembly 0-30A/ 0-500V.
P/F of timer Assembly ET – 100
P/F of SPPR SDz5
P/F of the MU 2 contactor Assembly
Repairs/ Replacements to the parts of MU-G30 FASD starter by way of;
P/F of terminal block 100A- 03 way
P/F of MN- 5 relay 20-33/30-50A
P/F of digital ammeter/Voltmeter Assembly 0-50A/ 0-500V.
P/F of timer Assembly ET – 100
P/F of SPPR SDz5
P/F of the ML 2W contactor Assembly
Repairs/ Replacements to the parts of MU-G40 FASD starter by way of;
P/F of terminal block 100A- 03 way
P/F of MN- 5 relay 30-50/ 36-60A
P/F of digital ammeter/ Voltmeter Assembly 0-60A/ 0-500V.
P/F of timer Assembly ET – 100
P/F of SPPR SDz5
P/F of the ML 3W contactor Assembly
Repairs/ Replacements to the parts of MU-G50 FASD starter by way of;
P/F of terminal block 100A- 03 way
2 P/F of MN- 5 relay 30-50/ 45-75A
P/F of digital ammeter/ Voltmeter Assembly 0-50A/ 0-500V.
P/F of digital ammeter/Voltmeter Assembly 0-75A/0-500V.
P/F of timer Assembly ET – 100
5 P/F of SPPR SDz5
P/F of the ML 4W contactor Assembly
Repairs/ Replacements to the parts of MU-G75 FASD starter by way of;
P/F of terminal block 100A- 03 way
P/F of MN- 5 relay 45-75/ 60-110A
P/F of digital ammeter/ Voltmeter Assembly 0-75A/ 0-500V.
P/F of digital ammeter/ Voltmeter Assembly 0-110A/ 0-500V.
P/F of timer Assembly ET – 100
P/F of SPPR SDz5
P/F of the ML 6W contactor Assembly
Repairs/ Replacements to the parts of ML- series FASD starter by way of;
Repairs to the ML-1.5 FASD Starter Assy.by way of; Front housing & moving bridge kit
ML-1.5 contactor Assy.
Standard operating coil for ML-1.5
Spare kit without coil
Moving contacts kit
Repairs/replacements to the parts of ML-2.0 FASD Starter Assy.by way of;
Front housing & moving bridge kit
ML-2 contactor Assy.
Standard operating coil for ML-2
Spare kit without coil
Moving contacts kit
Repairs/replacements to the parts of ML-4.0 FASD Starter Assy.by way of;
Front housing & moving bridge kit
ML-4 contactor Assy.
Standard operating coil for ML-4
Spare kit without coil
5 Moving contacts kit
VOLTAGE STABILIZERS; Annexure “D” Cost on account of Complete Rewinding of 25KVA Voltage Stabilizer;
Draining out the T Oil & Shifting of the stabilizer unit from site to workshop by way of employing private mechanical transport & back to site after conducting the necessary repairs (15kms) Approx.
Dismantling of the damaged coil legs by employing skilled labours along with all tools tackles necessary for complete dismantling.
Cooper wire used in rewinding all the three coil legs of the stabilizer by using the cooper wire of adequate gauge & pitch. @6kg/leg
Skilled labour, insulated paper, tappings, varnishing etc.
Topping of T.Oil to the voltage stabilizer.
Providing/Fitting of the new Bush rods after replacement of the damaged ones.
Replacement of the damaged regulator/Rotary Switch Plate type (9”x9”) size as per sample.
Cost on account of Deduction of old scrap @80% of original value
Cost on Account of Complete Rewinding of 50KVA Voltage Stabilizer;
Draining out the T Oil & Shifting of the stabilizer unit from site to workshop by way of employing private mechanical transport & back to site after conducting the necessary repairs (15kms) Approx.
Dismantling of the damaged coil legs by employing skilled labours along with all tools tackles necessary for complete dismantling.
Cooper wire used in rewinding all the three coil legs of the stabilizer by using the cooper wire of adequate gauge & pitch. @9kg/leg
Skilled labour, insulated paper, tappings, varnishing etc.
Topping of T.Oil to the voltage stabilizer.
Providing/Fitting of the new Bush rods after replacement of the damaged ones.
Replacement of the damaged regulator/Rotary Switch Plate type (9”x9”) size as per sample.
Cost on account of Deduction of old scrap @80% of original value
Cost on Account of Complete Rewinding of 75KVA Voltage Stabilizer;
Draining out the T Oil & Shifting of the stabilizer unit from site to workshop by way of employing private mechanical transport & back to site after conducting the necessary repairs (15kms) Approx.
Dismantling of the damaged coil legs by employing skilled labours along with all tools tackles necessary for complete dismantling.
Cooper wire used in rewinding all the three coil legs of the stabilizer by using the cooper wire of adequate gauge & pitch. @15kg/leg
Skilled labour, insulated paper, tappings, varnishing etc.
Topping of T.Oil to the voltage stabilizer.
Providing/Fitting of the new Bush rods after replacement of the damaged ones.
Replacement of the damaged Regulator/Rotary Switch, Plate type (9”x9”/12”x12”) as per sample.
Cost on account of Deduction old scrap @80% of original value
Cost on account of Complete rewinding of 3phase 100kva oil cooled voltage stabilizer by way of;
Draining out the T Oil & Shifting of the stabilizer unit from site to workshop by way of employing private mechanical transport & back to site after conducting the necessary repairs
Dismantling of the damaged coil legs by employing skilled labours along with all tools tackles necessary for complete dismantling.
Cooper wire used in rewinding all the three coil legs of the stabilizer by using the cooper wire of adequate gauge & pitch. @22kg/leg
Skilled labour, insulated paper, tappings, varnishing etc.
Topping of T.Oil to the voltage stabilizer.
Providing/Fitting of the new Bush rods after replacement of the damaged ones.
Replacement of the damaged Regulator/Rotary Switch Plate type (12”x12”) as per sample.
Cost on account Deduction of old scrap @80% of original value
“HT TRANSFORMERS” ANNEXURES "E"
Cost on account of Repairs to 63 KVA HT Transformer by way of” Dismantling of transformer body, draining out the T Oil & Shifting the HT Transformer by way of employing the private mechanical transport to the nearest work shop, by using skilled labor for assessing the damage. Refitting the duly repaired HT Transformer, lifting of the core assembly & refitting of coils, parts replaced. The job includes shifting back the HT Transformer by means of private Mechanical transport, re-installation of the transformer on transformer bed by using skilled labours and testing of the same on full load at site after conducting necessary repairs.
Complete rewinding of 3 No LT coil legs as per the existing parameters, out of Aluminium strip @7Kgsx3 Coils=21Kgs (old scrap @70% shall be property of firm)
28.3 Rewinding of the 12 No. H.T. coils as per the existing parameters after dismantling of damaged one. 3Kgsx12 No=36Kgs ( Old scrap @70%shall be property of firm)
Reconditioning of the LV Coil Leg. (One Coil Leg=7kg)
Reconstruction of HT transformer by way of fixing phase legs and core mechanism by way of putting together core strips, re tapping all the connection leads and P/F of pvc. sleeves, crape paper, lethroid paper sheet etc.
Removal of moisture by way of heat treatment in oven
Providing/Filling of fresh T Oil
Filtration of Old T Oil
Cost on account of Repairs to 100 KVA HT Transformer by way of Dismantling of transformer body, draining out the T Oil & Shifting the HT Transformer by way of private mechanical transport to the nearest work shop by using skilled labor for assessing the damage. Refitting the duly repaired HT Transformer, lifting of the core assembly & refitting of coils, parts replaced.. The job includes shifting back the HT Transformer by means of private Mechanical transport, re-installation of the transformer on transformer bed by using skilled labours and testing of the same on full load at site after conducting necessary repairs
Complete rewinding of 3 No LT coil legs as per the existing parameters, out of Aluminium strip @10Kgsx3 Coils=30Kgs ( Old scrap @70% shall be property of firm)
Rewinding of the 12 No. H.T. coils as per the existing parameters after dismantling of damaged one. 4Kgsx12 No=48Kgs (old scrap @70% shall be property of firm)
Reconditioning of the LV Coil Leg. (One Coil=10kg)
Reconstruction of HT transformer by way of fixing phase legs and core mechanism by way of putting together core strips, re tapping all the connection leads and P/F of pvc. sleeves, crape paper, lethroid paper sheet etc.
Removal of moisture by way of heat treatment in oven
Providing/Filling of fresh T Oil
Filtration of Old T Oil
Repairs to 250 KVA HT Transformer by way of Dismantling of transformer body, draining out the T Oil & Shifting the HT Transformer Shifting, the HT Transformer by way of private mechanical transport to the nearest work shop dismantling of transformer body by using skilled labor for assessing the damage. Refitting the duly repaired HT Transformer, lifting of the core assembly & refitting of coils, parts replaced.. The job includes shifting back the HT Transformer by means of private Mechanical transport, re-installation of the transformer on transformer bed by using skilled labours and testing of the same on full load at site after conducting necessary repairs
30.1 Complete rewinding of 3 No LT coil legs as per the existing parameters, out of Aluminium strip @15Kgsx3 Coils=45Kgs (old scrap @70% shall be property of firm)
Rewinding of the 12 No. H.T. coils as per the existing parameters after dismantling of damaged one. @7Kgsx12 No=84Kgs (old scrap @70%shall be property of firm)
Reconditioning of the LV Coil Leg. (One Coil Leg=15kg)
Reconstruction of HT transformer by way of fixing phase legs & core mechanism by way of putting together core strips, re tapping all the connection leads and P/F of pvc. sleeves, crape paper, lethroid paper sheet etc.
Removal of moisture by way of heat treatment in oven
Providing/Filling of fresh T Oil
Filtration of Old T Oil
Repairs to 400 KVA HT Transformer by way of; Dismantling of transformer body, draining out the T Oil & Shifting the HT Transformer by way of private mechanical transport to the nearest work shop, dismantling of transformer body by using skilled labor for assessing the damage. Refitting the duly repaired HT Transformer, lifting of the core assembly & refitting of coils, parts replaced.. The job includes shifting back the HT Transformer by means of private Mechanical transport, re-installation of the transformer on transformer bed by using skilled labours and testing of the same on full load at site after conducting necessary repairs
Complete rewinding of 3 No LT coil legs as per the existing parameters, out of Copper strip @31Kgsx3 Coils=93Kgs (old scrap @80% shall be property of firm)
Rewinding of the 12 No. H.T. coils out of copper wire as per the existing parameters after dismantling of damaged one. @12Kgsx12 No Coils=144Kgs (old scrap @80%shall be property of firm)
Reconditioning of the LV Coil Leg. (One Coil=31kg)
Reconstruction of HT transformer by way of fixing phase legs and core mechanism by way of putting together core strips, re tapping all the connection leads and P/F of pvc. sleeves, crape paper, lethroid paper sheet etc.
Removal of moisture by way of heat treatment in oven
Providing/Filling of fresh T Oil
Filtration of Old T Oil
Providing and fitting of various electrical Gadgets Annexure "F"
P/F/I/T & Successful commissioning of the MU-G type MU-G10 fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase maximum motor load 10HP/7.5KW having Maximum relay range (13-21A) MU1 contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G10 H fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase capable of working on maximum motor load of 10HP/7.5KW having Maximum relay range (28-42A) MU1 contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G20 fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase having Maximum relay range (13-21A) MU1 contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G20H fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase having Maximum relay range (21-32A) MU2 contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G30 fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase having Maximum relay range (30-50A) ML2W contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 10mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G40 fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase having Maximum relay range (30-35/36-60A) ML3W contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 10mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G50 fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase having Maximum relay range (36-60/45-75A) ML4W contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 10mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
P/F/I/T & Successful commissioning of the MU-G type MU-G75 fully automatic Star-Delta starter in sheet steel enclosure capable of working on AC-3 duty, 415V/50Hz 3phase having Maximum relay range (45-75/66-110A) ML6W contactors conforming to IS/IEC-60947-4-1 & IEC-60947-4-1 with overload, single phasing, phase reversal & phase imbalance protections in vibrations proof enclosure with IP-54 protection class. The unit should be fitted with ON/OFF, voltage & Ampere indications compatible with M-Power. The job includes its fitment on panel board in 10mm2pvc sheathed copper wire of Havells/Polycab Make along with P/F of the 30Amp copper thimbles.
Providing/Fitting/installation & testing of four pole 100amp capacity Manual off load COS (L&T/Havells/Standard) Make, side handle operated capable of operating on 415V,50Hz conforming to IS/60947-1&3 in sheet steel enclosure to be fitted on the panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make.
Providing/Fitting/installation&testing/Commissioning of 100amp capacity DU/DH,MCCB three pole in SKB-3 frame size with adjustable thermal & magnetic settings having breaking capacity of 30ka at 415V, conforming to IS; 13947-ii & IEC-60947 of (LnT/Havells/Standard/) Make to be fitted on the panel board. The job includes its wiring in 16mm2pvc sheathed copper wire along with P/F of the 60amp Aluminum thimbles & its duly crimping with the crimping tool for proper fitment.
Providing/Fitting/installation & testing of four pole 200amp capacity off load COS (L&T/Havells/Standard) Make, side handle operated capable of operating on 415V,50Hz conforming to IS/60947-1&3 in sheet steel enclosure to be fitted on the panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make.
Providing/Fitting/installation & testing/Commissioning of 200amp capacityDU/DH, MCCB four pole in SKB-3 frame size with adjustable thermal & magnetic settings having breaking capacity of 36ka at 415V, conforming to IS; 13947-ii & IEC-60947 of (LnT/Havells/Standard/) Make to be fitted on the panel board. The job includes its wiring in 16mm2pvc sheathed copper wire along with P/F of the 60amp Aluminum thimbles & its duly crimping with the crimping tool for proper fitment.
Providing/Fitting/installation & testing of four pole 250amp capacity off load COS (L&T/Havells/Standard) Make, side handle operated capable of operating on 415V,50Hz conforming to IS/60947-1&3 in sheet steel enclosure to be fitted on the panel board in 16mm2pvc sheathed copper wire of Havells/Polycab Make.
Providing/Fitting/installation & testing/Commissioning of 250amp capacity DU/DH,MCCB four pole in SKB-3 frame size with adjustable thermal & magnetic settings having breaking capacity of 36ka at 415V, conforming to IS; 13947-ii & IEC-60947 of (LnT/Havells/Standard/) Make to be fitted on the panel board. The job includes its wiring in 16mm2pvc sheathed copper wire along with P/F of the 60amp Aluminum thimbles & its duly crimping with the crimping tool for proper fitment.
Cost on account of Electrical Repairs & replacements to parts of D G sets "Annexure G"
Cost on account of Electrical Repairs & replacements to parts of 25KVA air cooled DG set Complete servicing of self-starter assembly by way of removing, dismantling, cleaning/checking replacing carbon brushes, carbon brush holder, armature and solenoid switch. The job also includes checking /repairs to auto starting panel by way of changing its damaged accessories parts.
P/Fitting of AVR D G Sets Voltage Regulator/ AVR for Brush less Alternator.
Repairs to the 12 Volt self starter assembly by way of P/F of the self Bendex gear, carbon brush set, bushes, solenoid switch & tapping of coil & refitting back.
Repairs to the alternator of engine by way of P/F of carbon brush set, rectifier plate & fan belt & refitting back.
Cost on account of Electrical Repairs & replacements to parts of 40KVA air cooled DG Set; Complete servicing of self-starter assembly by way of removing, dismantling, cleaning/checking replacing carbon brushes, carbon brush holder, armature and solenoid etc. The job also includes checking /repairs to auto starting panel by way of changing its damaged accessories parts.
Repairs to the 12 Volt self starter assembly by way of P/F of the self Bendex gear, carbon brush set, bushes, solenoid switch & tapping of coil & refitting back.
Repairs to the alternator of engine by way of P/F of carbon brush set, rectifier plate & fan belt & refitting back.
P/Fitting of AVR D G Sets Voltage Regulator/ AVR for Brush less Alternator.
Cost on account of Electrical Repairs & Replacements to parts of 82.5 KVA DG set 46.1 Complete servicing of self-starter assembly by way of removing, dismantling, cleaning/checking replacing carbon brushes, carbon brush holder, armature and solenoid etc. The job also includes checking /repairs to auto starting panel by way of changing its damaged accessories parts.
Repairs to the 12 Volt self starter assembly by way of P/F of the self Bendex gear, carbon brush set, bushes, solenoid switch & tapping of coil & refitting back.
P/Fitting of AVR D G Sets Voltage Regulator/ AVR for Brush less Alternator.
Repairs to the alternator of engine by way of P/F of carbon brush set, rectifier plate & fan belt & refitting back.
Complete Radiator Servicing & P/F of water hoses & clamps also P/F of V-Belt. The job includes P/F of 12 Volt battery connections set.
Cost on account of Submersible Cables & Bearings (Annexure "H"Cost on account of Providing/Fitting of Flat Two/Three Core PVC Insulated & PVC Sheathed industrial copper cable for Submersible pump motors, 1100 Volts, conforming to IS;694
1.5mm2 2 Core
2.5 mm2 2 core
4.0 mm2 2 Core
1.5mm2 3 Core
2.5 mm2 3 core
4.0 mm2 3 Core
6.0 mm2 3 Core
10 mm2 3 Core
16 mm2 3 Core
Cost on account of Providing/Fitting of 3/3.5 Core XLPE Insulated, PVC Sheathed multicore Aluminium Armored cable 650/1100V grade, conforming to IS; 7098 (Part 1) 1988 of Havells/Polycab make.
25 mm2 2 Core
25 mm2 3 core
35 mm2 3 core
50 mm2 3 Core
50 mm2 3 Core
25 mm2 3.5 Core
35 mm2 3.5 Core
50 mm2 3.5 Core
70 mm2 3.5 Core
M/s ASIAN ELECTRICAL AND MECHANICAL WORKS
Competent Engineering Works
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .