Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84 LAccepted-AOC UNIT NO DCB 119 IDCO INFO PARK DLF CYBER CITY CHANDAKA INDUSTRIAL ESTATE PATIA BHUBANESWAR 751024 | KHORDHA | ODISHA | 751024 | ₹84 L | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹2.8 CrRejected-Finance | ₹2.8 Cr | L2 | Rejected-Finance Reject |
| 3 | L3₹3.0 CrRejected-Finance | ₹3.0 Cr | L3 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Ecometrix Consultants Pvt Ltd L1 | GREEN Design & Engineering Services Pvt. Ltd. L3 | Samarth Infra Tech Services Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Stage B: Preparation of Topographic map by using Total station and DGPS-RTK survey for the project area, including roads, terrain features, existing utilities and proposed infrastructure, with GIS-compatible output for hydraulic and planning analysis. | 100 | Kms | 12,000 ₹12 L | 40,000 ₹40 L | 50,309 ₹50.3 L |
| 2.00 | Stage C: Assessment of existing water supply, source availability, population projections, demand and flow estimations and planning for source augmentation and full coverage of 24x7 water supply including Hydraulic modelling using Water GEMS (for water supply) and detailed design of water distribution, Pumping stations, reservoirs and SCADA systems as per CPHEEO norms. Environmental and social safeguard assessment and documentation including land verification as per ADB guidelines, fulfilling statutory clearance requirements, conducting stakeholder consultations and ADB-compliant due diligence for water sector. | 1 | Job | 25,00,000 ₹25 L | 1,10,00,000 ₹1.1 Cr | 1,14,97,920 ₹1.1 Cr |
| 3.00 | Stage D: Assessment of existing sewerage network, wastewater generation sources, population projections, sewage flow estimations and planning for full coverage of underground sewerage system including hydraulic modelling using Sewer GEMS (for sewerage) and detailed design of sewer network, pumping stations, sewage treatment plants and SCADA systems as per CPHEEO norms. Preliminary design of STP, Environmental and social safeguard assessment and documentation including land verification as per ADB guidelines, fulfilling statutory clearance requirements, conducting stakeholder consultations and ADB-compliant due diligence for sewerage sector. | 1 | Job | 27,00,000 ₹27 L | 1,17,00,000 ₹1.2 Cr | 76,65,280 ₹76.7 L |
| 4.00 | Stage E: Preparation of Detailed Project Report (DPR) including all components fully complying to the scope of works for source augmentation and 24X7 DFT along with designs, modelling results, BoQ, cost estimates, implementation strategy and bidding documents in ADB format. | 1 | Job | 10,00,000 ₹10 L | 15,00,000 ₹15 L | 24,78,000 ₹24.8 L |
| 5.00 | Stage F: Preparation of Detailed Project Report (DPR) including all components fully complying to the scope of works for Sewerage system along with designs, modelling results, BoQ, cost estimates, implementation strategy and bidding documents in ADB format. | 1 | Job | 10,00,000 ₹10 L | 15,00,000 ₹15 L | 16,52,000 ₹16.5 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
18 Nov 2025, 4:00 pmClosed
EE, PWD, Yanam
Chinta Street, PWD, Yanam
Consultancy Services for Preparation of DPR for source Augmentation Drink from tap 24x7 water supply scheme and underground sewerage system in Yanam Region UT of Puducherry
2025_PWDC2_19856_1
49/EEY/2025-26
Open Tender
Water Supply
Yanam
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹3.6 L
CE, PWD, Puducherry
9 May 2026
16 Sept 2025
19 Nov 2025
16 Sept 2025
18 Nov 2025
27 Sept 2025
16 Sept 2025 - 23 Sept 2025
26 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_20237.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid