Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC NO 161 GRAFTON STREET VGN MONTE CARLO GURUSAMY ROAD NOLAMBUR CHENNAI 600 095 | CHENNAI | CHENNAI | TAMIL NADU | 600095 | L1 | Accepted-AOC lowest rate quoted by the tenderer hence the tender is accepted | |
| 2 | L2₹7.7 L+₹12,744 (1.68%)Rejected-AOC | L2 | Rejected-AOC higher rate quoted compared to lowest tenderer quoted rate | |
| 3 | L3₹7.8 L+₹19,116 (2.52%)Rejected-AOC | L3 | Rejected-AOC higher rate quoted compared to lowest tenderer quoted rate |
| Sl No | Description | Qty | Unit | Global water projects pvt ltd L1 | A ANANTHASAYANAM L3 | VINAYAGA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing Labour charges for Plant Operator for General shift (1 shift - 12 Hours) to operate the STP plant for the months. Carrying out routine and preventive maintenance to ensure optimum productivity levels and operator will operate the plant and take care of break down maintenance. Chemicals like hypo, bio culture for STP and monitor stock level of chemicals on daily basis to avoid stock out situation shall be taken care by operation team. | 9 | Months | 71,400 ₹6,42,600 Lowest | 73,200 ₹6,58,800 | 72,600 ₹6,53,400 |
| 2.00 | GST at 18% | 1 | Nos | 1,15,668 ₹1,15,668 Lowest | 1,18,584 ₹1,18,584 | 1,17,612 ₹1,17,612 |
Tender Value
Refer Docs
EMD Value
₹7,595
Closing Date
27 Jun 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer Buildings C and M South Presidency Division Chepauk Chennai 5
Operation and Maintenance for STP plant of capacity 50 KLD in Anna Centenary Library at Kotturpuram, Chennai 85 For the period from July 2025 to March 2026
2025_PWD_573429_1
TNPWD/01-08/111A-M/2025-2026
Open Tender
Civil Works
Lump-sum
270 days
Kotturpuram Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,595
3 Sept 2025
24 Jun 2025
27 Jun 2025
24 Jun 2025
27 Jun 2025
24 Jun 2025
Amount
Providing Labour charges for Plant Operator for General shift (1 shift - 12 Hours) to operate the STP plant for the months. Carrying out routine and preventive maintenance to ensure optimum productivity levels and operator will operate the plant and take care of break down maintenance. Chemicals like hypo, bio culture for STP and monitor stock level of chemicals on daily basis to avoid stock out situation shall be taken care by operation team.
GST at 18%
VINAYAGA CONSTRUCTIONS (BID ID -1383139)
A ANANTHASAYANAM (BID ID -1383105)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .