Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4 LAccepted-AOC | 1 | Accepted-AOC Lowest Evaluated Bidder | |
| 2 | 2₹8.3 L+₹4.3 L (107.5%)Rejected-Finance 27 JALALPUR CANTT AREA ROORKEE HARIDWAR UTTARAKHAND 247667 UDYAM UK 06 0007734 | HARIDWAR | UTTARAKHAND | 247667 | 2 | Rejected-Finance Other than lowest evaluated bidder |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
30 Apr 2025, 3:00 pmClosed
Executive Engineer Hydrology C and M Division
Executive Engineer Hydrology C and M Division Shimla 4
Restoration of the Gauges for validation
2025_HPIPH_104094_1
91-163 dated 19-04-2025
Open Tender
Civil Works
Item Rate
60 days
Himachal Pradesh
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,000
9 May 2025
19 Apr 2025
30 Apr 2025
19 Apr 2025
30 Apr 2025
19 Apr 2025
Amount
Supply and Installation of Stage Measurement Gauges including Shifting of benchmark from nearest Survey of India Benchmark as per specifications and scope of work, Civil Work for Water Stage Measurement Gauge/ Platform as per site requirement where installation of Gauge post is not feasible/economical the width of the platform should be atleast 300 mm and length shall be as per requirement of site (at least 2 metres above the HFL), conducting cross-section survey complete in all respects conforming to IS 4080: 1994 - Please refer Annexure - 2 for detailed scope of work and other requirements
INDIA PRECISION INDUSTRIES (BID ID -513956)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_152673.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .