| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 CrAccepted-AOC 0 | ₹34.0 Cr Quoted ₹34.1 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹35.4 CrRejected-Finance | ₹35.4 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RAJ CONSTRUCTION L1 | AMBE INFRAPROJECTS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (But Excluding GST) | 50,780 | sqm | 4 ₹2.0 L | 4 ₹2.0 L |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (as per MORT&H Specification No. 301, Sl. No. 3.06) (But Excluding GST) | 18,683 | cum | 60 ₹11.2 L | 60 ₹11.2 L |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per MORT&H Specification No. 305, Sl. No. 3.17 (But Excluding GST) | 18,683 | cum | 70 ₹13.1 L | 60 ₹11.2 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MORT&H Specification.305,Sl.no.3.16 (But Excluding GST) | 31,953 | cum | 130 ₹41.5 L | 110 ₹35.1 L |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Sl.no.4.01B (But Excluding GST) | 29,575 | cum | 1,900 ₹5.6 Cr | 1,950 ₹5.8 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Specification No. 406 Sl.no.4.14B (But Excluding GST) | 19,629 | cum | 2,200 ₹4.3 Cr | 2,250 ₹4.4 Cr |
| 7.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (But Excluding GST) | 1,20,010 | sqm | 40 ₹48.0 L | 50 ₹60.0 L |
| 8.00 | Providing & Laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregated of specified grading, premixed with bituminous binder @ 4.0 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MOR&TH specifications clause 505 complete in all respects. (But Excluding GST) | 9,600 | cum | 7,700 ₹7.4 Cr | 7,700 ₹7.4 Cr |
| 9.00 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Clause 503 Sl. No. 5.02 (ii) (But Excluding GST) | 1,20,010 | sqm | 11 ₹13.2 L | 11 ₹13.2 L |
| 10.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 Sl. No. 5.05B complete in all respects (But Excluding GST) | 3,600 | cum | 9,900 ₹3.6 Cr | 9,700 ₹3.5 Cr |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
15 Dec 2025, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Widening and strengthening of Lalitpur Jakhaura Talbahat Road (MDR-53(B)) in Km. 1 to 20(390)
2025_CEJNS_1097135_1
8571/44 C-Jhansi Circle/25 Date 29.10.2025
Open Tender
Civil Works - Roads
456 days
Lalitpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,950
₹50 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
10 Apr 2026
8 Dec 2025
15 Dec 2025
8 Dec 2025
15 Dec 2025
8 Dec 2025
10 Dec 2025
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (But Excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (as per MORT&H Specification No. 301, Sl. No. 3.06) (But Excluding GST)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per MORT&H Specification No. 305, Sl. No. 3.17 (But Excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MORT&H Specification.305,Sl.no.3.16 (But Excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Sl.no.4.01B (But Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Specification No. 406 Sl.no.4.14B (But Excluding GST)
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (But Excluding GST)
Providing & Laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregated of specified grading, premixed with bituminous binder @ 4.0 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MOR&TH specifications clause 505 complete in all respects. (But Excluding GST)
Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Clause 503 Sl. No. 5.02 (ii) (But Excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 Sl. No. 5.05B complete in all respects (But Excluding GST)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. as per MORTH specification clause No. 601 Sl. No. 6.01 (But Excluding GST)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per MORTH specification clause No. 602 Sl. No. 6.02 (But Excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H Specification.305, Sl.no.3.18 (But Excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & 3 Km. leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H Specification.305, Sl.no.3.18 (But Excluding GST)
Providing and Laying Interlocking tiles 80mm in Aabadi (But Excluding GST)
Dismantling of existing structures like culvert, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 meters. as per MORT&H Specification No. 202 Clause 2.4 (But Excluding GST)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H Specification No. 304, Sl. No. 15.01 (But Excluding GST)
Stone dust Filling in Foundation Trenches as per Drawing & Technical Specification No. 304 S.l No. 15.03 (But Excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification No. 2100 S.l No. 12.4) (But Excluding GST)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC grade M 20) (Case-I: Using concrete Mixer (as per MoRT&H Specification No. 1500, 1700 & 2100) Sl. No. 15.11 B (But Excluding GST)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications No. 1400 & 2200 Sl. No. 15.10 (But Excluding GST)
Plain/Reinforced Cement Concrete in open foundation complete as per Drawing and Technical Specifications. (RCC Grade M35) MORT&h no. 1500 &1700 2100 SI. No. 15.11 (But Excluding GST)
Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M35) (as per drawing and Technical specification MORT&H no. 1500, 1600 & 1700 Sl. No. 15.12D) (But Excluding GST)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. MORT&H no. 1600 Sl. No. 15.13) (But Excluding GST)
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. as per drawing and Technical specifications MORT&H no. 2507.2 Sl. No. 16.11) (But Excluding GST)
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications MORT&H no. 1300 & 2200 Sl. No. 15.08) (But Excluding GST)
De-watering of foundation by 5HP Diesel Engine Pump (But Excluding GST)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification MORT&H no. 2504 Sl. No. 16.05) (But Excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications Clauses 2706 & 2200 Sl. No. 15.14 (But Excluding GST)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (But Excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and 3 km leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Construction of embankment with approved material obtained from borrow pits with all lifts and 3 km leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (But Excluding GST)
Laying Reinforced cement concrete pipe 1000 mm dia NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (But Excluding GST)
Laying Reinforced cement concrete pipe 600 mm dia NP4/prestressed concrete pipe for culverts on first class bedding of granular material in Double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (But Excluding GST)
Laying Reinforced cement concrete pipe 350 mm dia NP4/prestressed concrete pipe for culverts on first class bedding of granular material in Double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost) (Excluding GST) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost) (Excluding GST) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1.00% Construction Cost) (But Excluding GST)
stage.html
html • 0.06 MB
technical_2019936.pdf
techsummary_2019936.pdf
finance_2019936.pdf
BOQ Comparative Chart
xlsx
finsummary_2019936.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
SBD.pdf
Tender Documents • 1.66 MB
BOQ_2019936.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid