Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance 275 PRATAP NAGAR CHORAHA MURLIPURA JAIPUR JAIPUR RAJASTHAN INDIA | JAIPUR | RAJASTHAN | 302039 | ₹8.5 L | L1 | Accepted-Finance rates are justified and approved by committee |
| 2 | Rejected-Technical 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | - | - | Rejected-Technical Technically disqualified |
| Sl No | Description | Qty | Unit | RAMCHANDRA ELECTRICALS L1 |
|---|---|---|---|---|
| 1.00 | PART-C- Dismantling Work:- Dismantling of Isolators on already erected steel structure including transportation of base frame, P.I.s, Contacts, Mechanism Box, Clamps & Connectors etc. from locations to site stores. (i) 33 KV Isolator Without E/B | 3 | Nos. | 300 ₹900 |
| 2.00 | Dismantling of 220 KV class EHV transformer ( tank already placed on foundation with wheel) including transportation of accessories from locations to site store , Dismantling of HV ,IV LV & neutral bushings , main and OLTC Conservators, Radiators ,equalizing pipe line marshaling kiosk etc. filling of Oil from transformer main tank to empty oil drum, remove the local electrical wiring from individual equipments e.g. ,Buchhloz relay ,MOLG, OSR, Fans & Pumps, Bushing, CTs etc. and from marshalling kiosk etc. If electricity is available & arranged by RVPN without charges. (i) Transformer oil filled | 1 | Nos. | 2,00,000 ₹2 L |
| 3.00 | Dismantling of 132 KV Current transformer with clamps & connectors including transportation from location to site store, de-fixing of terminal connectors, loosing of nuts & bolts etc. and removing local wiring from CT. | 1 | Nos. | 5,000 ₹5,000 |
| 4.00 | Dismantling of control & Relay panel complete in all respect including transportation from control room to site store loosing from foundation / cable trench as per lay out inter disconnection between control & relay panel and with existing panel de-fixing of side/ top cover & doors earthing to existing earth strip in control room disconnection of Bus wiring to existing panel & between control & relay panel as required a. Duplex Panel | 1 | Nos. | - |
| 5.00 | Dismantling of control & Relay panel complete in all respect including transportation from control room to site store loosing from foundation / cable trench as per lay out inter disconnection between control & relay panel and with existing panel de-fixing of side/ top cover & doors earthing to existing earth strip in control room disconnection of Bus wiring to existing panel & between control & relay panel as required b. Simplex /RTCC Panel | 1 | Nos. | 18,000 ₹18,000 |
| 6.00 | Destringing of Bus bar work: - De-Stringing of 220,132 KV bus bar of ACSR conductor including transportation of conductor disc Insulator & tension H/W from location to site store, laying & cutting required length of conductor cleaning and de-assembly of disc insulator and tension H/W dismantled from bus bar from the beams for three phases of conductor in each bus section. (a) Any Single Conductor | 2 | Sec. | 6,000 ₹12,000 |
| 7.00 | Dismantling of Jumpering of ACSR Conductor ( 03 Nos. Y type ) between bus to equipment or between equipment to equipment or between bus to bus including transportation of conductor, disc insulator and hardware from location to site store, cleaning and assembly of Disc Insulators as required along with loosing of suspension H/W & dismantling as required cutting required length of conductor , removing connection ,defixing of spacers & spacers T clamps as required tighting of clamps and connectors etc. for three phases.
(a) Any Conductor | 33 | Nos. | 650 ₹21,450 |
Tender Value
₹7.6 L
EMD Value
₹15,154
Closing Date
25 Aug 2025, 6:00 pmClosed
SE TNC RVPN ALWAR
Office of SE TNC RVPN Kali Mori Alwar
Aug work of 220 132 KV 200 MVA TRF in place of 100 MVA TRF at 220 KV GSS Neemrana
2025_RRVPN_493471_1
TN 519
Open Tender
Electrical Works
220 KV GSS Neemrana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
AO TNC RVPN ALWAR
₹15,154
Yes
SE TNC RVPN ALWAR
27 Feb 2026
12 Aug 2025
27 Aug 2025
12 Aug 2025
25 Aug 2025
12 Aug 2025
14 Aug 2025
Amount
PART-C- Dismantling Work:- Dismantling of Isolators on already erected steel structure including transportation of base frame, P.I.s, Contacts, Mechanism Box, Clamps & Connectors etc. from locations to site stores. (i) 33 KV Isolator Without E/B
Dismantling of 220 KV class EHV transformer ( tank already placed on foundation with wheel) including transportation of accessories from locations to site store , Dismantling of HV ,IV LV & neutral bushings , main and OLTC Conservators, Radiators ,equalizing pipe line marshaling kiosk etc. filling of Oil from transformer main tank to empty oil drum, remove the local electrical wiring from individual equipments e.g. ,Buchhloz relay ,MOLG, OSR, Fans & Pumps, Bushing, CTs etc. and from marshalling kiosk etc. If electricity is available & arranged by RVPN without charges. (i) Transformer oil filled
Dismantling of 132 KV Current transformer with clamps & connectors including transportation from location to site store, de-fixing of terminal connectors, loosing of nuts & bolts etc. and removing local wiring from CT.
Dismantling of control & Relay panel complete in all respect including transportation from control room to site store loosing from foundation / cable trench as per lay out inter disconnection between control & relay panel and with existing panel de-fixing of side/ top cover & doors earthing to existing earth strip in control room disconnection of Bus wiring to existing panel & between control & relay panel as required a. Duplex Panel
Dismantling of control & Relay panel complete in all respect including transportation from control room to site store loosing from foundation / cable trench as per lay out inter disconnection between control & relay panel and with existing panel de-fixing of side/ top cover & doors earthing to existing earth strip in control room disconnection of Bus wiring to existing panel & between control & relay panel as required b. Simplex /RTCC Panel
Destringing of Bus bar work: - De-Stringing of 220,132 KV bus bar of ACSR conductor including transportation of conductor disc Insulator & tension H/W from location to site store, laying & cutting required length of conductor cleaning and de-assembly of disc insulator and tension H/W dismantled from bus bar from the beams for three phases of conductor in each bus section. (a) Any Single Conductor
Dismantling of Jumpering of ACSR Conductor ( 03 Nos. Y type ) between bus to equipment or between equipment to equipment or between bus to bus including transportation of conductor, disc insulator and hardware from location to site store, cleaning and assembly of Disc Insulators as required along with loosing of suspension H/W & dismantling as required cutting required length of conductor , removing connection ,defixing of spacers & spacers T clamps as required tighting of clamps and connectors etc. for three phases. (a) Any Conductor
Description of Work / Item(s)
Amount
PART B OIL FILTRATION WORK :- Filtration of Transformer Oil 220/132 KV, 200 MVA EHV Transformer at 220 KV GSS, Neemrana, by providing high vacuum filtration machine (10KL & Above) and oil testing kit having 100 KV Capacity.
Providing 20000/25000 Litter Capacity transformer Oil Tank on per day rate basis including loading/unloading and transportation charges.
Bidder Name
Amount
RAMCHANDRA ELECTRICALS (GSTN-08AMLPJ5778R1ZW) BID ID -3281590
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid