Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Apr 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Shahjahanpur
Electy. Trans. Circle Shahjahanpur
Work
2024_UPTCL_921961_1
55 ETC(S)/2023-24
Open Tender
Electrical Works
Fixed-rate
10 days
Shahjahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹885
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹5,000
28 May 2024
10 Apr 2024
24 Apr 2024
10 Apr 2024
23 Apr 2024
10 Apr 2024
10 Apr 2024 - 23 Apr 2024
Amount
Dismantalling of 132/33 KV,40MVA Transformer 132 KV Sub Station Powayan by dismantalling the accessories,opening of jumpers,cutting of earthing,opening of cable connections, drainning out transformer oil upto required level,removal of oil pipe line,explosion vent pipe,conservator tank Etc .and proper blanking with proper size gasket & planking plates(blanking plates & nut-bolts shal be provided by department) all othe T&P etc shall be arranged by contractor at his own cost.
Dismantalling of RTCC Panel of 40 MVA T/F including disconnection of cables & cutting of earthing and Shifting to store.
Dragging and shifting of 132/33 KV 40MVA Transformer main tank from transformer plinth alongwith radiator and bushings (approx distance upto 20 mtr,) including turning of transformer if required including all T&P and all other works required to complete job satisfactory.
Additional shifting for every 5 meter.
Dismantalling of 132 kv L.A by opening of jumpers,nut-bolts & earthing etc. including dismantalling of ALP structures after due opening of nut-bolts and earthing etc. and their shifting to store place .(01 job for each set of L.A & ALP structure).
Shifting of main tank of 63MVA ,132/33 KV Transformer upto 20 meter distance from unloading place towards plinth including turning of transformer tank,as required alongwith all associated works 132 KV Sub station Powayan.
Additional shifting for every 5 meters
Complete errection of 63 MVA ,132/33 KV Transformer including its radiator,conservator tanks ,HV/LV/Neutral bushing ,turrets,all pipe lines,buchholz relay,motor drive mechanism of OLTC, cooling fan etc.
Earthing of main tank ,marshalling box,drive mechanism, transformer neutral etc.of 63 MVA transformer with the help of 50x06 mm size M.S Flats,its jointing with already laid earthmat /delta at 2 place including necessary modification in existing support for earthing of neutral bushing support for its earthing works and then painting of earthing strips as per technical specification.
Making 3 meter long electrodes by cutting 40 mm dia M.S Round bar and making delta earthing of 132 kv & 33 kv neutral bushing after digging pits of size 1x1x1 meter,inserting all 3 Nos, electrodes in pits vertically inside ground making delta by jointing electrode with M.S flats of size 75x10 mm and making riser to connect with HV/LV/Neutral of transformer.
Errection of 132 kv L.As including errection of ALP structures and connection of earthing with existing M.S flat as designed place as per technical specification (01 job for each set of L.A & ALP structure).
Jumpering of L.A and LV bushing of 63 MVA transformers through out 132 & 33 KV L.A with the help of existing /newely prepared ACSR Panther /ACSR Twin moose conductor respectivelly with associated terminal connector and PG Clamp etc to connect with 132 kv and 33 kv bus bars.
Installation of RTCC Panel of above 63 MVA Transformer in control room including laying additional control cables if required as per site requirement and termination and connection of all existing/newely control cables at RTCC & transformer end as per technical specification.
Laying of following size of cable addition to old laid cable of 40 MVA T/F from control panel in control room to RTCC or marshalling Box as per cable schedule including making necessory holes in gland plats or box wherever required providing and fixing of cable glands of appropriate size, fixing PVC ferrules and Nos. for each core of cable as per drawing including all associated work to complete the work satishfactorily-
2C x2.5 Sqmm
4C x2.5 Sqmm
6C x2.5 Sqmm
Connection of cable & termination of following size of control cable as laid & also termination of cables already dismantaled from 40 MVA t/f. and coming from control panel in control room as per cable schedule including making necessary holes in gland plates or box whereever required, providing and fixing of cable glands of appropriate size, fixing of pvc ferrules for each core of cable and its terminations as per drawing including all associated work to complete the work satisfactory.
2C x2.5 Sqmm
4C x2.5 Sqmm
6C x2.5 Sqmm
Proper packing of HV Bushing of dismantaled 40 MVA T/F. including proper wrapping with polythene sheet in the wooden crats and stacking them in the store.
Centrifusing of transformer oil taking the IR/BDV & PPM value of T/F oil at an interval of 2 hrs till achieving the desired value(as per specification of T/F manufacturer.)
After centrifusing and achieving the desired value of BDV & PPM (as per specification of T/F manufacturer), testing of T/F oil (Dissloved Gas Analysis, Tan Delta,Dielectric Strength &Water content test) is to be done at CPRI lab/ before charging of T/F and after charging of T/F works include sample collection, transportation and submission of reports.
Strenthning of neutral earthing(HV/LV) of 63MVA, 132 /33 kv transformer . Work includes earth strip emanating from neutral point of transformer shall be connected with two M.S flat (75x10mm) strip and this strip will be connected at two different arms of the delta earthing and this delta earthing shall also be connected with earth electrodes system at X & Y axix of main earthmat the work also includes carriage of M.S Flat from UPPTCL store, m.s flat shall be provided by department.
Getting the NOC from Electrcal safety office by submission of required fee descide by Electrcal safety office
M/s Abhinav Enterprises
Perfect Power Transformer Associates
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .