Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
6 Oct 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer / South / Dindigul
O/o Executive Engineer / South / Dindigul Dindigul EDC, TANGEDCO, Meenatchi Nayakan Patti, Dindigul 624 002 Mobile-9445852727
Running contract for Extension and Dismantling of Electrical networks and various OM works etc., in South/ Dindigul division, Natham sub division.
2022_EB_253194_1
EE/S/DGL/01/22-23
Open Tender
Electrical Works
Works
90 days
Dindigul
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
26 Oct 2022
23 Sept 2022
7 Oct 2022
23 Sept 2022
6 Oct 2022
24 Sept 2022
Loading of 7.5 Mtr /8.0 Mtr poles
Loading of 9.14 Mtr poles / 9 Mtr PSC
Loading of R.S.Joist /Tubular Poles upto 9.14 Mtr
Loading of R.S.Joist /Tubular Poles above 9.14 Mtr
Unloading ofPSC Pole 7.5m/8.0m
Unloading ofPSC Pole 9.0m/metal pole(RS.Joist/Tubular)
Loading / Unloading7.5 mtr /8.0 Mtr pole grill
Loading / Unloading 9.14 mtr pole Grill
loading Metering set/C.T/P.T/Station type LAS (3 nos) w/o crane
Unloading of Metering set/C.T/P.T/Station type LAS (3 nos) w/o crane / w/o ramp
Loading/Unloadin of DTs upto 100KVA w/o crane
Loading /unloading of DTs Above 100KVA up to 250 KVA w/o crane
Loading /unloading of DTs Above 250KVA up to 500 KVA w/o crane
Loading/unloading of Metering set/C.T/P.T/Station type LAS (3 nos) with Board Crane
Loading /unloading of DTs upto 100KVA with Board crane
Loading /unloading of DTs Above 100KVA up to 250 KVA
Loading /unloading of DTs Above 250KVA up to 500 KVA with board crane
Transport of 7/2.59 mm ACSR conductor including PVC cable upto 25sqmm - from road side to workspot upto 1KM stringing and sagging of conductor including binding of pin and proper tightening
Transport of 7/3.35 mm ACSR conductor including PVC cable upto 25sqmm - from road side to workspot upto 1KM stringing and sagging of conductor including binding of pin and proper tightening
Transport of 7/4.09 mm ACSR conductor including PVC cable upto 25sqmm - from road side to workspot upto 1KM stringing and sagging of conductor including binding of pin and proper tightening
Dog conductor for 33KV and for others
Cradle guarding including earthing and earth pit excavation.
Flat guarding
Split Neutral guarding
Rearrangement of HT Lines for providing of Guarding arrangements
Rearrangement of LT Lines for providing of Guarding arrangements
Transport of 7.5 Mtrs/8.0 Mtr of poles including R.S J oist and Rail poles upto 1.0 km
Transport of 7.5 Mtrs/8.0 Mtr pole above additional 1.0 KM or part there of by using Bullock cart/Tractor
Transport of 9.0 Mtr PSC, 9.14 Mtr & and above poles including R.S Joist and Rail poles upto 1.0 km
Transport of pole 9.0 Mtr PSC, 9.14 Mtr & and above additional 1.0 Km or part thereof
Transport of poles by hill area 7.5 Mtr /8.0 Mtr pole and RSJ poles
Transport of poles by hill area 9.14 Mtr, 9.0 Mtr poles and RSJ poles
Transport of Distribution transformer /metering set upto 10
Transport of Distribution transformer /metering set above 10 to 30 km
above 30 km & for every adl. 1 Km
Transporting of line materials Up to 10 KMs
Transporting of line materials Additional Every 10 KMs
Loading / Unloading Of Line Materials
Excavation of 7.5Mtr / 8.0 Mtr Poles (1.25 X 0.6 X 1.5M) - ordinary soil
Excavation of 9.14 Mtr Poles /9.0 Mtr PSC Poles/ All Metal poles(1.25x06x1.83M) -ordinary soil
Excavation of Stay pit (0.95 X 0.6 X 1.2 M)
Excavation of 7.5Mtr / 8.0 Mtr Poles (1.25 X 0.6 X 1.5M) - Medium rock
Excavation of 9.14 Mtr Poles /9.0 Mtr PSC Poles/ All Metal poles(1.25x06x1.83M)-Medium Rock
Excavation of Stay Pit (0.95 X 0.6 X 1.2 M) -medium rock
Excavation of 7.5Mtr / 8.0 Mtr Poles (1.25 X 0.6 X 1.5M) - HARD rock
Excavation of 9.14 Mtr Poles /9.0 Mtr PSC Poles/ All Metal poles(1.25x06x1.83M)-HARD Rock
Excavation of Stay Pit (0.95 X 0.6 X 1.2 M) -HARD rock
Erection of 7.5 Mtr/8.0 Mtr Poles
Erection of 9.14 Mtr Poles
Erection of Above 9.14 Mtr Poles/ RSJ
Erection of Stay set Erection complete
Stay erection without rod and pit
Fixing of LT Sph "X" Arm/HT TI Fitting/ LT TI Fitting
Fixing of LT 3ph "X" Arm
Fixing of 3' - 6" "V" "X" Arm
Fixing of 4' - 6" "V" "X" Arm
Fixing of 5' "V" cross arm
Fixing of tapping channel / Guarding "X" Arm
Fixing of Top Channel
Fixing of Cross bracing
Fixing of 11 KV Pin insulator with pin
Fixing of 11 KV Disc with metal parts
Fixing of 22 KV/33KV Pin Insulator/ PT insulator
Fixing of 22 KV Disc with metal parts
Fixing of 33KV Disc with metal parts
Fixing of LT Pin insulator with pin
Fixing of LT Shackle with metal parts
Fixing of Aluminium Knob
Fixing of Double V Xarm
Erection of Base Plate
Providing of Line spacers in LT Lines / 3 phases/ single phase
Replacement of Guy Shackle only in Existing Stay
Fixing of HT LAS ( 3 Nos with Jumbering & earthing)
Fixing of LT LAS ( 3 Nos with Jumbering & earthing)
Erection of Bed Channel ( Two Nos Channel )
Erection of Belting angle
Erection of HT LAS with Jumbering and Earthing
Erection of LT LAS with Jumbering and Earthing
Erection of Jumbering ( HT Side)
Erection of H.G.Fuse unit complete(Complete set)
Erection of Cross Brassing Set complete
Erection of A.B switch with PT Insulator complete and Jumberring
Erecton of 11 KV /22KV/ 33 KV Centre rotationg A.B.Switch complete
Erection of Single pole Transformer Bed
Erection of Single pole A.B. Switch (G.OS)
Erection of Single pole H.G.Fuse set
Painting of all clamp , other materials and painting of Single pole Strucure pole( Excluding Paint)
LT cable arrangement for single pole DT
Fixing of Danger Board (Excluding Paint)
Erection of Plinth for (22 KV) Single pole Structure ( including all material )
Erection of DT Upto 100 KVA
Erection of DT Above 100 KVA & Upto 250 KVA
Transformer wiring in LT Side including Jumbering Bus Bar etc.
Erection of LT Open type fuse unit arrangement Single/Double (Including Jumbering)
Painting of Stucture complete excluding DT(Two coat of Red Oxide) all metal parts(Excluding of Paint) ( Double Pole Strcture )
Painting of Stucture complete excluding Double pole DT(One coat of Alu.Paint ) Excluding of coat of Paint
Colour washing of Two Numbers structure pole (Excluding cost of distember /Snowcem)
Paing of Transformer name Plate details including cost of the sheet (1.5 X 1) and paint
Painting name of SS at seating Channel including paint
D.P Structure.earthing including all works
Transformer stru.Earthing 10' depth 3 Nos of pipe
Erection of fourth Earth pipe including earthing
Earth pit masonary work 3 Nos earth pit or using 3 Nos concrete tub
Earthing of Pole including buring ,looping and binding
Repalcement of detoriated earth pipe only
Mass concreating PCC including cost of Jally,MSAND& cement,Lead ,Lift etc. with a mixture of 1:3:6 for 9m Square pole with copping for single pole Structure.Concreating of size( 21/2ft X 21/ 2 ft X 7 ft)(0.75 X 0.75 X 2.10M)
Mass concreting for centre support for 2 feet including all materials
Transformer Structure Poles Mass Concreting with coping 0.65x0.6Mx1.85M+0.65Mx0.6x0.35 coping
Mass concerting for pole 0.6Mx0.45Mx1.25M
Sleeve concret for poles 0.6M X 0.6M 0.3M
Sleeve concret for Stay set 0.3M dia and 0.75 long
Fabrication of centre support and erection of centre support including pits
Dismantling of 7.5m/8.0m Poles
Dismantling of 9.14 Mtr. Poles
Dismantling of Stay set complete
Dismantling of conductors upto 7/2.59 MM and Coiling and Transporting from workspot to road side
Dismantling of conductors 7/3.35 MM and above and Coiling and Transporting from workspot to road side
Releasing of LT S ph "X" Arm/TI Fitting
Relaasing of LT 3 ph "X" Arm
Releasing of 3' - 6" "V" Cross Arm/Tapping channal/Guarding "X" Arm
Releasing of 4' - 6" and 5' - 6" "V" Cross Arm/Tapping channal
Releasing of 5' - 6" "V" Cross Arm
Relasing of Distn.Tr. Only at field
Dismantling of Transformer Structure materials
Dismantling of AB Switch at D.T.Structure
Dismantling of H.G. fuse set
Dismantling of HT LAS at DT Structure
Dismantling of LT LAS at DT Structure
Dismantling of Earth Pipe and Structure earthing complete
Dismantling of 2 Nos. Open type fuse unit set with all wiring complete(including bus bar arrangement)
Dismantling of cross bracing set
Dismantling of Top Channel
Labour for manufacturing of Clamps altering of clamps with holes and cutting
Providing of holes of all size Angles/Channels up to 3/4
Providing of holes Of all size Angles/Channels above 3/4
providing of Slot holes in Flat/Angles /Channels up to 3/4
providing of Slot holes in Flat/Angles /Channels above 3/4
Welding
Gas Cutting of R.S.Joist/Angles/MS Channels
Painting of Distribution Transformer ( One coat of Alu.Paint)
Jungle clearance such as Kattu Karuvai in the various area
Clearing of Tree brances of coconut tree
Clearing of Tree brances of Neem, Tamerined, country etc
Clearing of Branches/ Trees with Bul Dozer / Leveling of Ground etc
Excavation of Pole pit/Stay pit using JCB/Earth Movers for all sizes (Minimum 4 Pits for pole / 5Pits for Stay)
Erection of all sizes of Poles using crane ( Three Poles)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .