Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹23.7 L+₹8.2 L (52.8%)Rejected-Finance GOEL MARKET BARARA 133201 | BARARA | AMBALA | HARYANA | 133201 | L2 | Rejected-Finance ok | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.6 L
EMD Value
₹43,220
Closing Date
25 Apr 2025, 1:00 pmClosed
Monika
Municipal Corporation Karnal
Repair work of Open Gym Equipments and Jhullas in various parks of Ward no.11 to 13 M.C. Karnal (Only for L/c societies )
2025_HRY_441318_1
20250F8CB84B 1AE2 4FDF A931 A01991143FDD747ULB
Open Tender
Civil Works
Works
240 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹43,220
Yes
23 Jun 2025
18 Apr 2025
25 Apr 2025
18 Apr 2025
25 Apr 2025
18 Apr 2025
Amount
Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under FRP Seat for Seasaw
Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under Bearing 6205,6207 and 6004
Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under Paint of Jhulla(Powder coated)
Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under Welding of Jhulla inculuding laabour and material charges
Repair of Jhulla Six Seater MGR Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Bearing 6205,6207and 6004
Repair of Jhulla Six Seater MGR Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Bearing Pin
Repair of Jhulla Six Seater MGR Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- PVC Seat
Repair of Jhulla Six Seater MGR Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint of Jhulla (Powder Coated)
Repair of Jhulla Six Seater MGR Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding of Jhulla including labour and material chages
Repair of Jhulla Two Seater ARC Swing, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bearing 6205,6207 and 6004
Repair of Jhulla Two Seater ARC Swing, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bealt Seat
Repair of Jhulla Two Seater ARC Swing, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Chain
Repair of Jhulla Two Seater ARC Swing, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint of Jhulla (powder coated)
Repair of Jhulla Two Seater ARC Swing, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding of Jhulla including labour and material charges
Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic Part
Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-FRP slide WAVE 10 Ft.
Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- FRP slide WAVE 8 Ft.
Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Canopy multiplay
Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Paint of Jhulla (Powder coated)
Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding of Jhulla including labour and material charges
Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Plastic part
Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- FRP Slide WAVE 10 Ft.
Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- FRP Slide WAVE 8 Ft.
Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Welding of Jhulla including labour and material charges
Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint of Jullah (Powder coated)
Repair of Open Gym Equipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ Equipments for repair work detail is as under:- PVC Foot Rest
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bearing 6205, 6202and 6207
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bearing Pin
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic cap Main pipe
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Nut Cap
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Hand Lattua
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic Cap-48mm, 4mm, 32mm
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint per machine (Powder Coated)
Repair of Open Gym Eqipments Air Walker at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding per machine including labour and material charges
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic cap main pipe
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-NUT and Bolt
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Nut Cap
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic Cap- 48mm, 42mm, 32mm
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint per machine (powder coated)
Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding per machine including labour and material charges
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- PVC Foot rest
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Bearing 6205,6202and 6207
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Bearing Pin
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Plastic cap main pipe
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Nut and Bolt
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Nut Cap
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Plastic cap- 48mm, 42mm,32mm
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Paint per machine (Powder Coated)
Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Welding per machine including labour and material charge
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202 and 6207
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Seat
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic Cap main pipe
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (Powder Coated)
Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour material charges
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour material charges
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205, 6202 and 6207
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Foot Rest
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap
Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (powder coated )
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205, 6202, 6207
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-hand Lattu
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges
Repair of Open Gym Equipment Leg press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Lattu
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per machine (powder coated)
Repair of Open Gym Equipment Pull Chair at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges
Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges
Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-plastic cap main pipe
Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap
Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Lattu
Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per machine (Powder coated)
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per machine (Powder coated)
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic Cap main pipe
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Lattu
Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour and material charges
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (Powder coated)
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-nut and bolt
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-nut cap
Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Bearing 6205,6202 and 6207
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: PVC Foot Rest
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Bearing Pin
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand grip
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Plastic Cap main pipe
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Nut and Bolt
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Nut Cap
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Paint per machine (Powder coated)
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap
Repair of Open Gym Equipment Elliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes) Required material equipments for repair work detail is as under: Welding per machine including labour and material charges
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges
Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: Hand Grip
Repair of Open Gym Equipment Cycle machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per (powder coated)
Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: Bearing 6205,6202 and 6207
Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: PVC Foot Rest
Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: Bearing Pin
Repair of Open Gym Equipment Double Cross Walker at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-plastic cap main pipe
Repair of Open Gym Equipment Double cross walker at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Double cross walker at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap
Repair of Open Gym Equipment Double cross walker at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (powder coated)
Repair of Open Gym Equipment Double cross walker at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour and material charge
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour and material charge
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202, 6207
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearingpin
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Twister plate
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Hand Lattu
Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- paint per machine (powder coated)
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- paint per machine (powder coated)
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic Cap main pipe
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap
Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges
Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Canopy multiplay
The Radhika Co-Op L&C Society Ltd. (BID ID -1247365)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .