Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC BUDOOBAGH NOWPORA 0 KHANYAR SRINAGAR JAMMU KASHMIR 190003 | SRINAGAR | JAMMU AND KASHMIR | 190003 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹10.6 L+₹3.2 L (44.0%)Rejected-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L2 | Rejected-Finance Rejected Being L2 | |
| 3 | L3₹13.3 L+₹6.0 L (81.9%)Rejected-Finance | L3 | Rejected-Finance Rejected Being L3 |
Tender Value
₹15.0 L
EMD Value
₹29,980
Closing Date
12 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Leh
GE (AF) Leh c/o 56 APO
REPAIR MAINTENANCE OF FCUs/ACs SUMMER AND HEATING APPLIANCES AND CONNECTED WORKS AT AF STATION LEH UNDER GE (AF) LEH
2023_MES_589379_1
GE(AF)/LEH/T-11/2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE (AF) Leh
As Per Tender Documents
8 documents required · 8 mandatory
₹500
GE (AF) Leh
₹29,980
Yes
28 Jun 2023
13 Apr 2023
15 May 2023
13 Apr 2023
12 May 2023
28 Apr 2023
Amount
Disconnecting, servicing and cleaning electrically operated FCUs of capacity 3000/ 4500 /6000 Kcal/hr from thermic fluid line complete and keeping aside for de-scaling/decarbonising , cleaning in all respect with suitable solution / solvent , checking all pipes leakage (inlet and outlet of FCUs) and brazing the punchered pipe where required, replacement of gate valve wherever required, cleaning of Y-strainer and reassembling and testing of the same ,complete all as specified and directed by Engineer-in-Charge.
Fan coil unit of cap 6000 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor in and including taking down of old userviceable Fan coil unit complete all as specified and directed by Engineer-in-Charge.
Fan coil unit of cap 3000/4500 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor in and including taking down of old userviceable Fan coil unit ,complete all as specified and directed by Engineer-in-Charge.
Taking out air space heater of capacity 60000/200000 K Cal/Hr, disconnecting electrically, repair of air space heater by replacement of spare parts and cleaning of burner chamber form inside, including servicing of burners of any make ,complete all as specified and directed by Engineer-in-Charge. Note :(i) Unservicable Spares parts shall be replaced under Item No. 4.01 to 4.06 and will be measured and paid seperately for Supply and fixijng as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.4.01 to 4.06.
Solenoid valve of suitable size, 220 V AC ,complete all as specified and directed by Engineer-in-Charge.
Nozzle as per existing ,complete all as specified and directed by Engineer-in-Charge.
Fuel pump as per existing ,complete all as specified and directed by Engineer-in-Charge.
Fuel filter element as per existing ,complete all as specified and directed by Engineer-in-Charge.
Photo cell as per existing ,complete all as specified and directed by Engineer-in-Charge.
Sequence controller as per existing ,complete all as specified and directed by Engineer-in-Charge.
Disconnecting, dismantling and taking out the non-functional Deep Freezers of any description, any make and in any position, capacity 310 Lts/320 ltrs/400 ltrs, including water connections, single phase, 50 Hz, strip opening, cleaning and servicing of the Deep Freezer with using suitable solution, taking out and removing unserviceable/defective wiring & damaged/un-serviceable parts, replacement of the unserviceable and defective spare parts, necessary brazing, reassembling Deep Freezer and testing of the Deep Freezer , complete as all specified and directed by Engineer–in–charge. NOTE : (i) Unservicable Spares parts shall be replaced under Item No. 5.01 to 5.03 and will be measured and paid seperately for Supply and fixijng as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.5.01 to 5.03. (ii) Charging of gas to make up required pressure, if any, shall be measured and paid for separately under appropriate item of Schedule `A' item No.5.04. However, vacuum and pressure leakage testing with nitrogen (N2), if any required, is deemed to be included under the unit rate quoted by the contractor for this item (iii) Rates quoted by the contractor for this item are also deemed to be included for de-scaling of chilled water pipe line including brazing of damaged portion of pipe line.
Compressor of 310 / 400 ltr Deep freezer including necessary brazing work as required including re assembling and testing ,complete all as specified and directed by Engineer-in-Charge.
Thermal over load relay of 310 / 400 ltr deep freezer ,complete all as specified and directed by Engineer-in-Charge.
Thermostate switch of 310 / 400 ltr deep freezer ,complete all as specified and directed by Engineer-in-Charge.
Refilling of R-134 a gas of 310 / 400 ltr deep freezer including necessary arrangement for gas filling ,complete all as specified and directed by Engineer-in-Charge..
Disconnecting, dismantling and taking out the non-functional Refrigerators of any description, any make and in any position, capacity 165 ltr to 320 ltr, single phase, 50 Hz, opening, cleaning and servicing of the refrigerator with using suitable solution, taking out and removing unserviceable/defective wiring & damaged/un-serviceable parts, replacement of the unserviceable and defective parts, necessary brazing, reassembling refrigerator and testing ,complete as all specified and directed by Engineer–in–charge. NOTE : (i) Unservicable Spares parts shall be replaced under Item No. 6.01 to 6.05 and will be measured and paid seperately for Supply and fixijng as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.6.01 to 6.05. (ii) Replacement of unserviceable / damaged body portions of the Refrigerator is deemed to be included under the unit rate quoted by the contractor under this item. (iii) Burnt out windings and internal wiring, if any, replaced, is deemed to be included under the unit rate quoted by the contractor under this item for rewinding alongwith internal wiring kit (iv) The rates for above items are deemed to include for transportation to & fro of Refrigerator to workshop as approved by Engineer-in-charge for necessary repairs and testing of Refrigerator at workshop & replacement of necessary unserviceable screws/nuts/bots/ washers/ packing etc with new one if required (v) Charging of gas to make up required pressure, if any, shall be measured and paid for separately under appropriate item of Schedule `A' under item 6.06. However, vacuum and pressure leakage testing with nitrogen (N2), if any required, is deemed to be included under the unit rate quoted by the contractor for this item
Compressor for refrigerator of capacity 280/320 Ltrs including necessary brazing work as required including re assembling and testing ,complete all as specified and directed by Engineer-in-Charge.
Thermostate switch for refrigerator of capacity 160/320 Ltrs ,complete all as specified and directed by Engineer-in-Charge.
Thermal overload relay for refrigerator of capacity 160/280/320 Ltrs ,complete all as specified and directed by Engineer-in-Charge.
Compressor sealed unit for refrigerator of capacity 165ltr/210 ltr including necessary brazing work as required including re assembling and testing ,complete all as specified and directed by Engineer-in-Charge.
Capilary tube for refrigerator of capacity 165 / 210/280/320 ltr including re assembling and testing ,complete all as specified and directed by Engineer-in-Charge.
Refilling of R12/ R-134a gas for refrigerator of capacity 165/320 Ltrs including necessary arrangement for gas filling ,complete all specified and as directed by Engineer- in-Charge.
Disconnecting electrical heat pillar of capacity 2KW/4KW and replacement of unserviceable spare parts and unserviceable burnt connection wires to make it fully serviceable and reassembling the same after repair and testing ,complete all specified and as directed by Engineer- in-Charge NOTE : Unservicable Spares parts shall be replaced under Item No. 7.01 to 7.04 and will be measured and paid seperately for Supply and fixing as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.7.01 to 7.04
Heating rod of capacity 1KW / 2 KW ,complete all as specified and directed by Engineer-in-Charge.
Rotating fan with motor of suitable size ,complete all as specified and directed by Engineer-in-Charge.
2.5 Sqmm 2 core PVC cable copper conductor ,complete all as specified and directed by Engineer-in-Charge.
Plug Top 15 A, 230V, AC ,complete all as specified and directed by Engineer-in-Charge.
Taking down carefully Hot water dispensor of capacity 20 ltr of any make for carry out the repairs of unserviceable parts i.e bushes bearing, heating coil of capacity 1KW unserviceable burnt cable and other parts to make it fully serviceable and reassembling the same after repair and testing ,complete all as specified and directed by Engineer-in-Charge.
Disconnecting & taking out the non-functional voltage stabilizer of any description and in any position & strip opening of Voltage Stabilizer of 2 KVA/5 KVA single phase, air cooled, taking out unserviceable/defective wiring & parts, cleaning and servicing complete including replacement of unserviceable parts with new one and unserviceable wiring with new PVC insulated and unseathed stranded copper conductor cable of existing size, reassembling ,connecting and testing including cleaning the exposed surfaces of stabilizers complete all specified and as directed by Engineer- in-Charge Note:- (i) Unservicable Spares parts shall be replaced under this item only and quoted rate are deemed to be included under the unit rate quoted by the contractor under this item . (ii) Burnt out windings shall be carried out under item No.10 below and will be measured and paid separetly under item No.10 here in after.
Rewinding of voltage stablizer of capacity 2KVA to 5 KVA single phase with standard copper enamel wire and making connections (internal) including replacement of control card of voltage stabilizer PCB sensor, ICs and relays etc and testing the stablizer ,complete all as specified and directed by Engineer-in-Charge.
Supply,fixing , installing , testing and commissioning of Voltage Stabiliser copper wound for automatic operation , single phase, 50 c/s AC Supply naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 250 V with output voltage stabilised at 230 V with accuracy of ± 2.5% and of capacity 5 KVA as in replacment of old unservicabe stablizer ,complete all as specified and directed by Engineer-in-Charge. Make : Vguard/ Microtec/Volina or other makes as specified in Appendix of makes.
Supply,fixing , installing , testing and commissioning of Voltage Stabiliser copper wound for automatic operation , single phase, 50 c/s AC Supply naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 250 V with output voltage stabilised at 230 V with accuracy of ± 2.5% and of capacity 4 KVA as in replacment of old unservicabe stablizer ,complete all as specified and directed by Engineer-in-Charge. Make : Vguard/ Microtec/Volina or other makes as specified in Appendix of makes.
Supply,fixing , installing , testing and commissioning of Voltage Stabiliser copper wound for automatic operation , single phase, 50 c/s AC Supply naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 250 V with output voltage stabilised at 230 V with accuracy of ± 2.5% and of capacity 3 KVA as in replacment of old unservicabe stablizer ,complete all as specified and directed by Engineer-in-Charge. Make : Vguard/ Microtec/Volina or other makes as specified in Appendix of makes.
Servicing and repair of Heating Pads convection type of capacity 1000x2 watts at different locations a,complete all as specified and directed by Engineer-in-Charge. NOTE : (i) Unservicable Spares parts shall be replaced under Item No. 14.01 to 14.02 and will be measured and paid seperately for Supply and fixijng as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.14.01 to 14.02.
Thermostatically controlled switch as per existing ,complete all as specified and directed by Engineer-in-Charge.
Heating element of cap 1000W as per existing ,complete all as specified and directed by Engineer-in-Charge.
Disconnecting and taking out the functional Air conditioner window/Split type of any description, any make and in any position of any capacity for shifting as per site requirment within AF complex , complete all as specified and directed by Engineer–in–charge. Note: The rates for above item is deemed to be included for transportation of AC for shifting only spares like pipe etc shall be replaced under above item.
Disconnecting, dismantling and taking out the functional /non functional Air conditioner window type of any description, any make and in any position, 1.5 TR capacity , single phase, 50 Hz, strip opening, cleaning and servicing of the AC with using caustic soda/detergent powder solution, reassembling and testing of the AC ,complete all as specified and directed by Engineer–in–charge.
Disconnecting, dismantling and taking out the existing Air conditioner Split type AC 1.5/2/2.5 TR of any description any capacity, any make and in any position, both indoor and outdoor unit single/three phase, strip opening , cleaning and servicing of the AC with using caustic soda/detergent solution, cleaning of suction air filter and coil of indoor unit and brazing the discharge and suction line, reassembling, fixing and testing of the AC , complete all as specified and directed by Engineer-in-Charge. NOTE : (i) Unservicable Spares parts shall be replaced under Item No. 17.01 to 17.14 and will be measured and paid seperately for Supply and fixijng as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.17.01 to 17.14. (ii) The rates of above item is deemed to be included for transportation to & fro of AC to workshop as approved by Engineer-in-charge for necessary servicing and replacement of necessary unserviceable screws/nuts/bots/ washers/ packing etc with new one as required (iii) Charging of gas to make up required pressure, if any, shall be measured and paid for separately under appropriate item of Schedule `A' under item 17.15. However, vacuum and pressure leakage testing with nitrogen (N2), if any required, is deemed to be included under the unit rate quoted by the contractor for this item
Compressor for 1.5 ton capacity AC unit as per existing type ncluding necessary brazing work as required including re assembling and testing ,complete all as specified and directed by Engineer-in-Charge.
Compressor for 2 ton capacity AC unit as per existing type ncluding necessary brazing work as required including re assembling and testing ,complete all as specified and directed by Engineer-in-Charge.
PCB of inner unit of 1.5 / 2 Ton AC as per existing type ,complete all as specified and directed by Engineer-in-Charge.
PCB of outdoor unit of 1.5 / 2 Ton AC as per existing type ,complete all as specified and directed by Engineer-in-Charge.
Condensing coil complete for 1.5 / 2 Ton AC as per existing type ,complete all as specified and directed by Engineer-in-Charge.
Cooling coil complete for 1.5 / 2 Ton AC as per existing type
Filter flap for indoor unit complete set as per existing type ,complete all as specified and directed by Engineer-in-Charge.
Reverse cycle type valve for Hot & Cold mode for 1.5 / 2 Ton capacity AC ,complete all as specified and directed by Engineer-in-Charge.
Charging valve 1.5 Ton AC ,complete all as specified and directed by Engineer-in-Charge.
Charging valve 2.0 Ton AC ,complete all as specified and directed by Engineer-in-Charge.
Outdoor unit fan motor 1.5/2.0 Ton AC ,complete all as specified and directed by Engineer-in-Charge.
Indoor unit blower with fan and bushes for 1.5 / 2Ton capacity AC as per site requirment ,complete all as specified and directed by Engineer-in-Charge.
Starting capacitor 250 mfd + 10 mfd (combined unit) ,complete all as specified and directed by Engineer-in-Charge.
Route pipe (copper tube) of size 3/8" or 5/8" dia complete with insulation ,complete all as specified and directed by Engineer-in-Charge.
Refilling gas ( R-22/32A / R410) in 1.5 / 2 Ton AC ,complete all as specified and directed by Engineer-in-Charge.
Heating element of capacity 4.0 KW (12") BSP flange 1.25" Hex Head 230 V 50 Hz AC suitable for Solar Water Heater of any Cap as in replacment of old unservicabe element ,complete all as specified and directed by Engineer-in-Charge..
Taking down and dismantling of geysers of any capacity by unscrewing the nuts from the mounting bolts and disconnection of electric and water connection including transportation the same to workshop and reinstallation/Reassembling geysers after repair,complete all as specified and directed by Engineer-in-Charge.. NOTE : (i) Unservicable Spares parts shall be replaced under Item No. 19.01 to 19.11 and will be measured and paid seperately for Supply and fixijng as in replacment .Cost of these items are deemed to be inclucsive in the quoted rate of item No.19.01 to 19.11. (ii) Minor parts such as nuts and bolts reqd for fixing inner tank is deemed to be included under this item.
Pressure release valve for geysers ,complete all as specified and directed by Engineer-in-Charge.
Dead weight valve for geysers ,complete all as specified and directed by Engineer-in-Charge.
Heating element 1.5/2.0 KW any type for Geysers ,complete all as specified and directed by Engineer-in-Charge.
Thermostat of geysers ,complete all as specified and directed by Engineer-in-Charge.
PVC connection ½” heavy duty 450mm long for cold water ,complete all as specified and directed by Engineer-in-Charge.
PVC connection ½” heavy duty 450mm long for Hot water ,complete all as specified and directed by Engineer-in-Charge.
Single pole and neutral enclosure with a two pin and earth plug and socket complete with one single pole mcb 10 amps , complete all specified and as directed by Engineer- in-Charge.
PVC cable 40/.0076 three core for geysers , complete all specified and as directed by Engineer- in-Charge.
Indication lamp for Geysers , complete all specified and as directed by Engineer- in-Charge.
Plug top 3 pin 15 Amp for Geysers , complete all specified and as directed by Engineer- in-Charge.
Non return valve 15mm , complete all specified and as directed by Engineer- in-Charge.
Steel water tubing, medium grade, Galvanized with screwed and socket joints, with all fittings such as short lengths, tees, bends, unions, elbows, reducers etc concealed in wall or laid fixed in repairs in floors 15mm bore size , complete all specified and as directed by Engineer- in-Charge.
Note : Schedule of credit to be deducted on acceptances of bid.Details of Schedule of credit is given in tender documents
national engineering
Hitech Engineers
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .