| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹50.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹61.7 L+₹11.6 L (23.1%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹66.9 L+₹16.8 L (33.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹68.2 L+₹18.1 L (36.2%)Admitted-Finance DEVI HARIDASI LANE VILASI TOWN DEOGHAR POST DEOGHAR THANA DEOGHAR BLOCK DEOGHAR | L4 | Admitted-Finance | ||
| 5 | L5₹68.8 L+₹18.7 L (37.3%)Admitted-Finance AT DEVI HARI DASI LANE BILASI TOWN DEOGHAR PIN 814112 | DEOGHAR | JHARKHAND | 814112 | L5 | Admitted-Finance |
Tender Value
₹68.9 L
EMD Value
₹1.4 L
Closing Date
28 May 2026, 5:00 pmClosed
MUNICIPAL COMMISSIONER
DMC DEOGHAR
Rejuvenation, Conservation and Plantation with Fencing of Data Baba Mazar Pond at Shivganga in ward no. 21
2026_UDD_114299_1
DNN/03/02/2026-27
Open Tender
Civil Works
Percentage
360 days
DMC DEOGHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.4 L
26 Sept 2026
20 May 2026
29 May 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. (ii) By mechanical Means using Dozer (A) In Area of Light Jungle | 0.96 | Hectare | 1,02,379.2 | ₹98,284.03 |
| 2 | for Dewatering pump 10H.P
water area x depth/8.3m3/hour
(basic rate + 10% C.P + 5% O.H.C) | 1 | Hour | 187.37 | ₹187.18 |
| 3 | E/W in excavation and filling in canal by the hydraulic excavator as per designed section in ordinary soil ( vide classification of soil item-A) and making the banks with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers beyond 500 m and upto 1000 m and all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. | - | M3 | 122.88 | - |
| 4 | Extra for earth work in marshy, slushy and daldal soil (vide classification of soil item-F) all complete as per specification and direction of E/I.30% if item no. 3 | 1 | M3 | 28.64 | ₹28.61 |
| 5 | Paver Road
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the fouda removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 1 | M3 | 151.82 | ₹151.67 |
| 6 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. | 1 | M3 | 1,458.8 | ₹1,457.34 |
| 7 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | 1 | M2 | 709.5 | ₹708.79 |
| 8 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including
making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved
by Engineer-in-charge).. | 1 | M3 | 8,255.96 | ₹8,247.7 |
| 9 | Boulder Pitching
Trimming & dressing the side slope of dam to proper section with all leads and lifts as per drawing, specification and direction of E/I. | - | Per 100M2 | 3,904.77 | - |
| 10 | Labour for rolling and compacting the earth in layers of 225mm thick at O.M.C. by sheep foot roller driven by tractor to achieve minimum 95% of maximum dry density including sprinkling the required quantity of water making arrangement for supply and carriage of water with all leads and lifts finishing the surface with propoer camber , grade super elevation including hire charge of compaction machine and other tools and plants etc all complete as per direction of E/I. (Mode of measurement sectional measurement of compacted earth.) | 1 | M3 | 25.75 | ₹25.72 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.40 MB
BOQ_154390.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .