Loading…
Loading…
Tender Value
₹18.1 Cr
EMD Value
₹36.1 L
Closing Date
13 Oct 2026, 10:00 am
EE construction Division PWD B and R Moga
EE construction Division PWD B and R Moga
Construction of School of Eminence at Village Kaila (Bajeke) Distt. Moga
2026_CEPW_175646_1
EE Bid No. 11 dated 15.9.2026
Open Tender
Civil Works - Buildings
Percentage
730 days
Moga
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹36.1 L
Yes
Faridkot
21 Sept 2026
21 Sept 2026
13 Oct 2026
21 Sept 2026
13 Oct 2026
21 Sept 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work
(G+2) RCC Framed Structure
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 2,376.73 | cum | 102.19 | ₹2,42,878.35 |
| 2 | Providing and applying Anti Termite Treatment using pre constructional chemical treatment measures as per IS - 6313 - 2001 ( Part 2 ) & using Chemical containg chloropyrifos systemic insecticide diluted to manufacturer's specifications (i) In foundation pits, by treating the bottom & sides upto height of 300mm by uniformly spraying solution @ 5 Litre / Sqm (ii) In the refill earth on both sides of all built up walls @ 7.5 Litre / Running meter ( width - 300 mm, depth- 450 mm ) (iii) Before laying the floor, by uniformly sprinkling the top surface of the consolidated earth within the outer perimeter @ 5 Litre solution per Sqm. | 1,144.76 | ltr | 391.9 | ₹4,48,632.62 |
| 3 | Cement Concrete 1:4:8 with stone ballast of size. Using concrete mixer volumetric type. 40 mm guage. | 367.91 | cum | 4,188.43 | ₹15,40,952.72 |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 1,581.16 | sqm | 221.24 | ₹3,49,808.82 |
| 5 | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering) including attached pilasters, buttresses etc when curved. | 29.02 | sqm | 468.81 | ₹13,602.45 |
| 6 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) | 4,253.44 | sqm | 502.52 | ₹21,37,438.17 |
| 7 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 280.27 | cum | 7,254.98 | ₹20,33,331.48 |
| 8 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 867.55 | cum | 6,282.25 | ₹54,50,172.27 |
| 9 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 151.84 | cum | 6,013.6 | ₹9,13,105.02 |
| 10 | Damp proof course 4 cm thick of cement concrete 1 : 2 : 4 with 2 coats of bitument 20/30 penetration at 1.65 kg per Sqm. laid hot and sanded. | 90.19 | sqm | 373.37 | ₹33,672.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_357464.xls
BOQ • 1.19 MB
sbd1part.pdf
Tender Documents • 1.92 MB
SDB2part.pdf
Tender Documents • 10.36 MB
sbD3.pdf
Tender Documents • 36.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .