Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.5 L+₹54,806.76 (9.21%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.5 L+₹58,810.76 (9.89%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹6.6 L+₹67,103.32 (11.3%)Admitted-Finance NEAR SADHURAM SCHOOL RAGHUNATHGANJ KATNI MADHYA PRADESH 483501 | KATNI | MADHYA PRADESH | 483501 | L4 | Admitted-Finance | |
| 5 | L5₹6.6 L+₹69,814.56 (11.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SURESH & CO L4 | P THANGAVEL L7 | Annamar Karthi Constructions L6 | VGK BUILDERS L3 | Sri Palaniandavar & Co L5 | KJ Contractor L1 | SRI SAI CONSTRUCTION L9 | M/s.J.G Construction L8 | V V N Construction L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.001.) Providing CC Road From Edappadi-Sankari Road to Fire Station Housing Board H/O Devannagoundanur at Sankari Block in Salem District | ||||||||||||
| 2.00 | Earth work excavation for foundation in Hard soils and sub soils and to full depth as amy be directed except in rock requiring blasting but inclusive of shoring ,strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers ofnot more than 15cm thick ,well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., including levelling the sites complete complying with standard specification and as directed | 24.3 | cum | 100 ₹2,430 Lowest | 130 ₹3,159 | 199.9 ₹4,857.57 | 100 ₹2,430 Lowest | 200 ₹4,860 | 102 ₹2,478.6 | 125.3 ₹3,044.79 | 175 ₹4,252.5 | 100 ₹2,430 Lowest |
| 3.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 33.75 | cum | 230 ₹7,762.5 | 280 ₹9,450 | 220 ₹7,425 | 220 ₹7,425 | 44 ₹1,485 Lowest | 120 ₹4,050 | 266.32 ₹8,988.3 | 1,200 ₹40,500 | 1,000 ₹33,750 |
| 4.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal gauge hand broken hard granite stone jelly for Foundation including dewatering if found necessary and laid in layers of not more than 15cm 15cm thick ,well rammed and consolidated etc. complete complying with standard specification | 41.85 | cum | 4,550 ₹1,90,417.5 | 4,800 ₹2,00,880 | 4,850 ₹2,02,972.5 | 4,600 ₹1,92,510 | 5,040 ₹2,10,924 | 3,900 ₹1,63,215 Lowest | 5,470.1 ₹2,28,923.69 | 4,500 ₹1,88,325 | 5,000 ₹2,09,250 |
| 5.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS,RECTANGULAR BEAMS TEE BEAMS ,LINTEL,BED ROCKS,STAIRCASE WAIST and landing slabs,landing beams ,canopy etc. | 162 | Sqm | 450 ₹72,900 | 535 ₹86,670 | 450 ₹72,900 | 400 ₹64,800 | 320 ₹51,840 | 480 ₹77,760 | 520.13 ₹84,261.06 | 223.57 ₹36,218.34 | 200 ₹32,400 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 50.63 | cum | 5,612 ₹2,84,135.56 | 5,900 ₹2,98,717 | 5,400 ₹2,73,402 | 5,600 ₹2,83,528 | 5,760 ₹2,91,628.8 | 5,028 ₹2,54,567.64 | 6,697.44 ₹3,39,091.39 | 6,500 ₹3,29,095 | 5,000 ₹2,53,150 Lowest |
| 7.00 | Provision for Bitumen Bad | 4.5 | Sqm | 190 ₹855 | 230 ₹1,035 | 500 ₹2,250 | 190 ₹855 | 280 ₹1,260 | 136 ₹612 Lowest | 222.59 ₹1,001.66 | 1,200 ₹5,400 | 1,000 ₹4,500 |
| 8.00 | Supply and Fixing 110mm PVC 6Ksc Pipe | 15 | Rm | 160 ₹2,400 | 195 ₹2,925 | 378 ₹5,670 | 155 ₹2,325 | 80 ₹1,200 Lowest | 90 ₹1,350 | 186.96 ₹2,804.4 | 110 ₹1,650 | 1,000 ₹15,000 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,00,962 ₹1,00,962 | 1,08,510 ₹1,08,510 | 1,02,506 ₹1,02,506 | 99,697 ₹99,697 | 1,01,376 ₹1,01,376 | 90,726 ₹90,726 Lowest | 1,20,261 ₹1,20,261 | 1,08,979 ₹1,08,979 | 99,086 ₹99,086 |
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
25 Sept 2026, 3:00 pmClosed
Block Development Officer (VP)
Block Development Office,Sankari
Providing CC Road From Edappadi -Sankari Road to Fire Station Housing Board H/O Devannagoundanur Sankari Block In Salem District OMDGF - 2026-27 Work No.01
2026_RDTN_703242_1
Roc No.3044/2025/T3
Open Tender
Civil Works
Item Wise
Block Development Office, Sankari
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,400
30 Sept 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.) Providing CC Road From Edappadi-Sankari Road to Fire Station Housing Board H/O Devannagoundanur at Sankari Block in Salem District | - | - | - | - |
| 2 | Earth work excavation for foundation in Hard soils and sub soils and to full depth as amy be directed except in rock requiring blasting but inclusive of shoring ,strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers ofnot more than 15cm thick ,well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., including levelling the sites complete complying with standard specification and as directed | 24.3 | cum | - | - |
| 3 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 33.75 | cum | - | - |
| 4 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal gauge hand broken hard granite stone jelly for Foundation including dewatering if found necessary and laid in layers of not more than 15cm 15cm thick ,well rammed and consolidated etc. complete complying with standard specification | 41.85 | cum | - | - |
| 5 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS,RECTANGULAR BEAMS TEE BEAMS ,LINTEL,BED ROCKS,STAIRCASE WAIST and landing slabs,landing beams ,canopy etc. | 162 | Sqm | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 50.63 | cum | - | - |
| 7 | Provision for Bitumen Bad | 4.5 | Sqm | - | - |
| 8 | Supply and Fixing 110mm PVC 6Ksc Pipe | 15 | Rm | - | - |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
01.pdf
Tender Documents • 0.48 MB
BOQ_845326.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .