| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 17.730₹6.8 LAccepted-AOC | ₹6.8 L | 17.730 | Accepted-AOC Tender Accepted |
| 2 | 5.001₹7.9 LRejected-Finance | ₹7.9 L | 5.001 | Rejected-Finance Highest Rate |
| 3 | 12.101₹7.3 LRejected-Finance | ₹7.3 L | 12.101 | Rejected-Finance Highest Rate |
| 4 | 14.990₹7.0 LRejected-Finance | ₹7.0 L | 14.990 | Rejected-Finance Highest Rate |
| Sl No | Description | Qty | Unit | C STEPHEN L1 | T. GEORGE STEPHEN L2 | IAAS CONSTRUCTIONS L4 | P JAYARAJAN WORKS CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to Full depth as may be directed except in hardrock equiring blasting inclusive of shoring shuttering nd baling out water and cleaning and levelling e site etc complete. (Narrow Foundation - First pth upto 2 metre) | 57 | M3 | 228.8 ₹13,041.6 | 225 ₹12,825 | 260 ₹14,820 | 172 ₹9,804 Lowest |
| 2.00 | Concrete curing Cement 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of planking panelling wherever necessary necessary and as directed by the departmental officers-Mixing by Mechanical Means | 15 | M3 | 4,842.4 ₹72,636 | 4,773 ₹71,595 | 5,225 ₹78,375 | 4,558 ₹68,370 Lowest |
| 3.00 | Supplying and erecting steel centering including necessary supports plane necessary for surfaces Reinforced Cement Concrete works such for as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc., which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, lard with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid). (Retaining wall) | 131 | m3 | 308.85 ₹40,459.35 | 604 ₹79,124 | 700 ₹91,700 | 172 ₹22,532 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying compacting, finishing and curing etc complete as per standard specifications and as directed by the departmental officers. - Mixing by mechanical means. | 91 | m3 | 6,089.13 ₹5,54,110.83 | 5,927 ₹5,39,357 Lowest | 6,600 ₹6,00,600 | 6,880 ₹6,26,080 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
28 Jul 2026, 3:00 pmClosed
Executive Officer
Thingalnagar Town Panchayat Thingalnagar
Construction of retaining wall at 11th ward Vadivilai to Puthuvilai via road in Thingalnagar Town Panchayat
2026_DTP_685433_1
52/2026/A1-4
Open Tender
Civil Works
Works
Vadivillai
Vth and above
2 documents required · 2 mandatory
₹0
₹10,000
Thingalnagar Town Panchayat office
14 Aug 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to Full depth as may be directed except in hardrock equiring blasting inclusive of shoring shuttering nd baling out water and cleaning and levelling e site etc complete. (Narrow Foundation - First pth upto 2 metre) | 57 | M3 | - | - |
| 2 | Concrete curing Cement 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of planking panelling wherever necessary necessary and as directed by the departmental officers-Mixing by Mechanical Means | 15 | M3 | - | - |
| 3 | Supplying and erecting steel centering including necessary supports plane necessary for surfaces Reinforced Cement Concrete works such for as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc., which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, lard with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid). (Retaining wall) | 131 | m3 | - | - |
| 4 | Plain Cement Concrete 1:2:4 (one cement two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying compacting, finishing and curing etc complete as per standard specifications and as directed by the departmental officers. - Mixing by mechanical means. | 91 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_823942.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_823942.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].