Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹4.5 L+₹40,075 (9.77%)Rejected-AOC | 2 | Rejected-AOC L-2 | |
| 3 | Rejected-Technical 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | - | Rejected-Technical DIS-QUALIFY |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
16 Apr 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2021_UPTCL_569054_3
ETC-II/L/84/2020-21
Open Tender
Electrical Works
Item Rate
30 days
ETD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹4,500
19 Jul 2021
9 Apr 2021
17 Apr 2021
9 Apr 2021
16 Apr 2021
10 Apr 2021
180 days
Amount
Following works are to be carried out at 132 KV S/S Bighapur, Unnao for increasing capacity of Sub-station from 20 MVA T/F to New 63 MVA, 132/33 KV T/F along with associated work with all cost of labour, misc., T&P and Crane, 6/12 KLPH Capacity Centrifuging Machine with Operator etc. to complete the work as per technical specification and direction of AE/JE (M).
Dismantled following equipments by opening of nuts & bolts, opening of jumpers, cable connections, earthing etc & then shifting of same from switchyard to open store as per direction of AE/JE.
36 KV CT Ratio 400/200/1Amp
36 KV 1250Amp B.I.
36 KV 1250Amp VCB with structure
120 KV LAs with Structures
Dismantling of the accessories of 132/33 KV, 20 MVA T/F after opening of jumpers removal of earthing, opening of cable connections, draining out of T/F oil up to required level in oil drum/Tanker, removal conservator tank, all pipe lines, all bushings, turrets, cooling fans, marshalling box etc., fixing blanking plate on the radiators, at pipe line, conservator tank, turret etc with proper stacking. Blanking plate bolts & nuts shall be provided by the contractor. All other T&P shall be arranged by the contractor at his own cost.
Shifting main tank of 132/33 KV, 20 MVA T/F from the plinth upto 25 meter distance including turning of tank if required, including all T&P and other associated work to complete the job satisfactorily.
Additional shifting of the main tank of the above T/F in addition to (3) above for shifting to respective plinth. (1 Job each for each additional shifting of 5 Mtr. or part thereof)
Shifting of oil filled main tank of 63 MVA, 132/33 KV T/F from unloading site to the designated place/plinth (upto 20 meters) including turning of the tank as required along with shifting all associated accessories with the help of sleepers, rails and jacks to be arranged by contractor at his own cost.
Additional shifting of the main tank of the above T/F in addition to (5) above for shifting to respective plinth. (1 Job each for each additional shifting of 5 Mtr. or part thereof)
Delta Earthing consisting of fabrication of 03 Nos. 3 Mtr. Long electrodes (40 mm dia), its placing inside ground and connection all 3 electrodes with 75x10mm M.S. flat and connection the same with main earthmat at 2 places as required, excluding the cost of M.S. Bar & Flat.
Complete erection of 63 MVA ,132/33 KV transformer including erection of radiators, conservator tank, HV/LV/ Neutral bushings, turrets, connecting all pipe lines, erection of cooling fans, motor drive mechanism of OLTC, etc. Topping up T/F oil (not circulation) and final oil filling in tank, radiators, oil pipes, conservator tank and attending leakage, if any, and all other associated works to complete the job.
Centrifuging of complete Transformer oil (Qty. Approx. 21000 Litre) in transformer tank with the help of high vacuum Centrifuging Plant at the site ( plant to be arranged by the Contractor ) including the work of draining oil from the bottom and filling the same through top and taking BDV & PPM values of the oil periodically till the required value is achieved.
Erection of RTCC Panel work includes shifting of equipment from store to control room etc. to complete the job.
Erection of following as per manual of various equipments & technical specification included shifting of material from store to erection site,work also included modification in new 36 KV VCB structure , raising height of 30 KV LA with the help of 22 KV PI & proper alignment of 36 KV BI as per direction of AE/JE.
36 KV CT Ratio 2000/1250/1Amp
36 KV 2000Amp B.I.
36 KV 1600Amp VCB with structure
120 KV LAs with Structures
Jumpering of the 63 MVA Transformer.
HV side with Single ACSR Panther conductor.
LV side with Twin Moose/Panther/Zebra conductor with associated terminal connector of LA,CT,VCB, BI & 33 KV main Bus.
Complete earthing of the 63MVA T/F, 33 KV BI, 33 KV VCB, 33 KV CT,30 KV LA & 120 KV LA with 75x10mm/50x6mm/25x6mm MS Flat as per Standard Practice .Work includes painting of earthing flat with two coat of best quality of Green colour paint after cleaning of rust & dust by emery paper & making smooth surface by apply one coat of Red Oxide Primer. MS Flat Provided by department free of cost.
Complete earthing of the Transformer (Main Tank of Transformer, Marshalling Boxes, Drive mechanisms , RTCC Panel etc.), 33 KV BI,33 KV CT, 33KV VCB,30 KV LA & 120KV LA with 75x10 /50x6/25x6 mm M.S. Flat as per standard practice.
Earthing of T/F Neutral HP & LV with 75x10 mm MS flat connecting with Delta at two points including other associated works.
Laying of new different size control cables in cable trench from respective panel in control room to related equipments in switchyard as per site requirement, including carriage of cable drums from store to site, their proper fixing and binding in cable racks with G.I. wire. (Control cable provided by the department free of cost)
Wiring & termination of the control & power cables as per new cable schedule of new 63 MVA T/F,its OLTC/RTCC panels,CTs,VCB , control & relay panel,cooling fan,pumps,marshalling box etc. by using existing & laid cable at both end included cost of cable glands,ferrules,cable tie,making necessary holes in gland plates.Work also included fixing & laying of perforated cable tray(Perforated cable Tray provided by department).
Awadh Construction Company
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .