| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC 157 PUCCA HOUSE BYPASS ROAD DISTRICT GODDA JHARKHAND 814133 | GODDA | GODDA | JHARKHAND | 814133 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical AT MAIN ROAD KATHARA PO KATHARA DIST BOKARO JHRAKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Not Evaluated as not L1 | |
| 3 | Rejected-Technical 1552B JARANGDIH BERMO BOKARO JHARKHAND 829113 | BERMO | BOKARO | JHARKHAND | 829113 | - | Rejected-Technical Not Evaluated as not L1 |
Tender Value
₹5.1 L
EMD Value
₹6,500
Closing Date
15 Jun 2022, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
P.E.(E and M), GVP Ph-II, PO Sawang Colliery, Dist
The office of P.E.(E and M), GVP Ph-II, PO Sawang Colliery, Dist Bokaro
Diversion of Existing 3.3 KV O/H Line at Departmental Quarry due toextension/shifting of mines working area at Govindpur Ph-II OCP
2022_CCL_246320_1
PE(EandM)/GVP Ph-II/E-Tender/22-23/177 dt-10.06.22
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
P.E.(E and M), GVP Ph-II, PO Sawang Colliery, Dist
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,500
Yes
23 Jun 2022
11 Jun 2022
16 Jun 2022
11 Jun 2022
15 Jun 2022
11 Jun 2022
11 Jun 2022 - 15 Jun 2022
120 days
Amount
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc as required.11.3.4 above 10 mtr and up to 12 mtr
Supplying and erection of 11KV Pin insulator complete with large steel head G.I pin, nuts, washers etc as required.
Supplying and erection of 11KV disc insulator for 11KV over head line s with galvanised strain clamps, bolts, nuts, washers etc. as required.
Erection of Disc /Pin Insulator for 11KV overhead line as required
Erection of all aluminium conductor of of 7/1.96 mm to 7/3.10 mm diameter including binding etc as required. (14 span x 3 wire x 50 mtrs. x 0.342 kg/ mtrs. = 718.20 kg
Erection of pole top/ staight two wire/ V shape two wire, angle iron/ channel iron, cross arm on tubular/ rail/ PCC pole for 11/22/33KV as required.
Erection of double pole 3 wire cross arm for 11KV / 22KV / 33KV over head line as required.
M.S Nut & Bolt
Supplying and erection of G.I wire No. 8 SWG including binding etc. as required. (12 span x 50 mtrs. x 0.103 kg/mtrs. = 61.8 kg
Cradling:-(a) Supplying of G.I wire No. 8 SWG including binding etc. as required = 28 kg (b) Erection of G.I wire No. 8 SWG including binding etc. as required = 28 kg
Earthing:-safe electrode having two custom made GI tubes (galvanised 80 microns, minnimum) one inside the other of length 2 mtrs. (outer dia80mm) filled with conductor rich cystalline mixture (CMM)
Back fill compound (Bag of 25kg each)
Providing and fixing of 25 mmX5mm G.I strip on surface or recess of connection etc. as required
Providing brick work (in width 225mm or more) with FPS brick of class designation 7.5 in cement mortar 1:4 (1 cement:4carse sand) at all levels.
supplying and erection of three piece nonlinear resistor type lightning arrestor suitable for 3 wire, 3.3KV overhead lines with rated voltage 5KV (rms) with a nominal discharge current rating of 5 KA and complete galvanised clamping arrangement G.I bolts, nuts, washers etc. as required.
Supplying and erection of galvanized stay set complete for 11 kv over ead lines complete wit with 19/20 mm dia X 1.8 meters long stay rod, anchor plate of size 45cm X 45cm X 7.5mm, thimble, stay clamps, turn buckle (20mm X 600mm), 7/ 4mm dia G.I. Stay wire and 11 kv strain insulator etc in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size) foundation including excavation and refilling etc. as required.
Dismantaling of pole/street light standered/strut embeded in cement concrete foundation etc as required
Dismatling of over head lines comprising of copper/ aluminium over head conductor, G.I wire, cross arms, insulators etc, as required. (01).Conductor = 14 span x 3 wire x 50 mtrs. = 2100 mtrs. x 0.342 kg/m = 718.2 kg (24. Disc Insulator = 24 X2 = 48 kg (30)pin insulator = 30 X 1 = 30 kg (04). M.S Material = 90 kg Total : 886.2 Kg
Transporting, loading & unloading of material. 01.Conductor = 2100 m 02. M.S. Angle =90 kg 03. Pole = 15
Total impact of GST for the purpose of CTC
M/S P. L. CONSTRUCTION
M/S TIGER ENTERPRISES
stage.html
html • 0.04 MB
techsummary_254469.pdf
PDF • 0.37 MB
finsummary_254469.pdf
PDF • 0.37 MB
award.pdf
PDF • 0.66 MB
finance_254469.pdf
PDF • 0.50 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .