Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAMTAJ WELDING AND ENG. WORKS L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Supply of saal wood for Drum lagging (75.5" x 8" x 5") as per enclosed drawing. | 52 | Nos | 3,700 ₹1,92,400 Lowest |
| 3.00 | Supply of 12 mm thick M.S plate for making of lagging plate & 3nos of supporting ring | 2 | MT | 51,000 ₹1,02,000 Lowest |
| 4.00Labor cost for making of lagging plate and 3nos of supporting rings | ||||
| 5.00 | Supervisor (high skilled ,surface):1 head x 3 shift x 3days = 9MS) | 9 | MS | 1,289.42 ₹11,604.78 Lowest |
| 6.00 | Fitter (Skilled ,surface):-(1 head x 3 shift x 3days = 9MS) | 9 | MS | 1,245.31 ₹11,207.79 Lowest |
| 7.00 | Welder (skilled ,surface):-(1 head x 3 shift x 3days = 9MS) | 9 | MS | 1,245.31 ₹11,207.79 Lowest |
| 8.00 | Gas Cutter (skilled ,surface):-(1 head x 3 shift x 3days = 9MS) | 9 | MS | 1,245.31 ₹11,207.79 Lowest |
| 9.00 | Hammer Man (Semi-skilled ,surface):-(1 head x 3 shift x 4days = 12MS) | 9 | MS | 1,201.21 ₹10,810.89 Lowest |
| 10.00 | Tyndal (Semi-skilled ,surface):-(6 heads x 3 shift x 3days = 54MS) | 9 | MS | 1,201.21 ₹10,810.89 Lowest |
Tender Value
₹5.7 L
EMD Value
₹7,200
Closing Date
3 Sept 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Kenda Area
Supply, making and installation of drum lagging of pit No-3 of JK Unit of Siduli Colliery
2025_ECL_341840_1
GM/KND/AE(ENM)/55(TN)/25-26/07
Open Tender
Miscellaneous Works
Item Rate
10 days
Siduli Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,200
24 Dec 2025
20 Aug 2025
5 Sept 2025
20 Aug 2025
3 Sept 2025
20 Aug 2025
20 Aug 2025 - 25 Aug 2025
Amount
Item Description/ Heading
Supply of saal wood for Drum lagging (75.5" x 8" x 5") as per enclosed drawing.
Supply of 12 mm thick M.S plate for making of lagging plate & 3nos of supporting ring
Labor cost for making of lagging plate and 3nos of supporting rings
Supervisor (high skilled ,surface):1 head x 3 shift x 3days = 9MS)
Fitter (Skilled ,surface):-(1 head x 3 shift x 3days = 9MS)
Welder (skilled ,surface):-(1 head x 3 shift x 3days = 9MS)
Gas Cutter (skilled ,surface):-(1 head x 3 shift x 3days = 9MS)
Hammer Man (Semi-skilled ,surface):-(1 head x 3 shift x 4days = 12MS)
Tyndal (Semi-skilled ,surface):-(6 heads x 3 shift x 3days = 54MS)
Dismantling of old drum lagging
Fitter (Skilled,surface):-(1 headx 2 shift = 2MS)
Fitter Helper (Semi-Skilled surface):-(1 head x 2 shift = 2MS)
Tyndal (Semi-skilled ,surface):-(5 heads x 2 shift = 10MS)
Installed of lagging plate and 3Nos. of supporting ring
Supervisor (high skilled ,surface):(1 head x 3 shift = 3MS)
Fitter (Skilled ,surface):-(1 head x 3 shift =3MS)
Gas Cutter (skilled ,surface):-(1 head x 3 shift = 3MS)
Fitter Helper (Semi-Skilled ,surface):-(1 head x 3 shift = 3MS)
Tyndal (Semi-skilled ,surface):-(5 heads x 3 shift = 15 M.S.
Supply of welding rod (ESAB)
Supply of industrial DA
Supply of oxygen
Supply of nut-bolts with washer (3/4" x 9")
Supply of "X" screw
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .