| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹25 L+₹26,260.54 (10.9%)Accepted-AOC | L2 | Accepted-AOC Work Awarded due to L1 with drawn | |
| 2 | L1₹2.4 LRejected-AOC | L1 | Rejected-AOC Rejected due to withdrawn by the L1 Tenderer | |
| 3 | L3₹2.9 L+₹43,530.32 (18.0%)Rejected-Finance | L3 | Rejected-Finance Rejected due to L3 |
| Sl No | Description | Qty | Unit | AV ENGINEERING L3 | A.Anbarasu L1 | GANESAN GROUPS L2 |
|---|---|---|---|---|---|---|
| 1.00Excavation of Pole Pits/Stay Set: | ||||||
| 2.00 | For Pole upto 8.0m length by using JCB/Manual | 1 | Per Pit | 525 ₹525 | 510 ₹510 Lowest | 525 ₹525 |
| 3.00 | For Pole above 8.0m length by using JCB/Manual | 1 | Per Pit | 600 ₹600 Lowest | 600 ₹600 Lowest | 600 ₹600 Lowest |
| 4.00 | In Hard soil (common to all size of poles) | 1 | Per Pit | 600 ₹600 Lowest | 600 ₹600 Lowest | 750 ₹750 |
| 5.00 | In Rocky area (Common to all size of poles by blasting /Manual) | 1 | Per Pit | 800 ₹800 Lowest | 800 ₹800 Lowest | 1,200 ₹1,200 |
| 6.00 | Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual | 1 | Per Pit | 500 ₹500 Lowest | 500 ₹500 Lowest | 500 ₹500 Lowest |
| 7.00 | Excavation of stay pit in Hard rock soil / by blasting | 1 | Per Pit | 1,200 ₹1,200 | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 8.00 | Excavation of stay pit in Hard rock soil | 1 | Per Pit | 1,000 ₹1,000 | 700 ₹700 Lowest | 700 ₹700 Lowest |
| 9.00Erection of Poles and Accessories | ||||||
| 10.00 | Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual | 1 | Per Pole | 600 ₹600 | 550 ₹550 | 540 ₹540 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
12 Dec 2024, 2:00 pmClosed
SE/TEDC/Tirupathur
Ballammal Colony,Tirupattur.
Running Contract for Maintenance of DTs, Replacement of poles ,Tree clearence works in EE Vaniyambadi Division
2024_EB_505605_1
37/24-25/Dt.28.11.2024
Open Tender
Electrical Works
Works
SE/TEDC/Tirupathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
8 Oct 2025
28 Nov 2024
13 Dec 2024
28 Nov 2024
12 Dec 2024
28 Nov 2024
Amount
Excavation of Pole Pits/Stay Set:
For Pole upto 8.0m length by using JCB/Manual
For Pole above 8.0m length by using JCB/Manual
In Hard soil (common to all size of poles)
In Rocky area (Common to all size of poles by blasting /Manual)
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
Excavation of stay pit in Hard rock soil / by blasting
Excavation of stay pit in Hard rock soil
Erection of Poles and Accessories
Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual
Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual
Erection of Metal supports above 9m/RSJ/rail Pole/Tubular pole
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
Erection of additional stay in the same stay rod, exculding excavation of stay pit and burial set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
Erection of stay set complete in the rock area by blasting
Fixing of line materials
Fixing of HT V Cross arms 3.5 feet
Fixing of HT V Cross arms 4.5 feet
Fixing of HT V Cross arms 5 feet
Fixing of LT 3 Phase cross arm
Fixing of LT 1 Phase cross arm
Fixing of HT TI Fitting
Fixing of LT TI Fitting
Fixing of HT Pin Insulators 11KV
Fixing of HT Pin Insulators 33 KV
Fixing of LT Pin Insulators
Fixing of HT 11KV stain disc
Fixing of HT 33KV stain disc
Fixing of Two Tapping cross arm upto 33KV line including fixing of Discs, insulators and Jumpering etc
Set Right of all sizes of leaning Poles
Fixing of LT Shackle
Fixing of Aluminium knob
Fixing of HT Las (3nos.)
Fixing of LT Las (3nos.)
Paving and Stringing of conductor
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR
Paving and stringing of conductors of one run of PVC cable line of all sizes with G.I wire and reel insulator.
Paving and stringing of conductors of sizw upto 7/4.09 mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor upto 7/3.35mm ACSR
Releasing and reerection (resagging) of one run of all sizes of conductor
Erection of Distribution Transformers:
Erection of Distribution Transformer structure complete as per TNEB std includind Painting,feeder arrangement,colour washing of RCC Pole etc., Fixing of Poles Type to be unit HT/LT LAS and Jumpering 3 Nos earth Pits with earth trough except erection of f Distribution Transformer
Erection of Distribution Transformers:
(i)upto 25 KVA Distribution Transformer / Metering set
(ii) Above 25 KVA to 100 KVA
(iii) Above 100 KVA to 250 KVA
(iv) 500 KVA and above
(V) Failed DT replacement below 100 KVA
(vi) Failed DT replacement 100 KVA and above
Erection of 11KV Single pole structure including erection of DT complete without centre support
Erection of 11 KV Single Pole structure including erection of DT complete with centre support
Erection of Distribution Structure
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc.,
(i) With 11 KV AB switch using all types of poles of size 9.14 m and above length
Erection of single pole DP with complete and with single earth
Concreting Works
Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles
(ii) Sleeve concreting
(iii) Stay concreting
Earthing
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
(ii) Provision of spike including earthing arrangement
(iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length
(iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
(v) Replacement of corroded earth pipe
Loading/Unloading Charges
Loading or Unloading of DT upto 100KVA
(ii) Above 100 KVA and upto 500 KVA
(iii) Metering set of all ratios
Loading of various size of REC, RCC,PSC Poles upto 8.0m length from Road side.
Loading of various size of REC, RCC,PSC Poles above 8.0m length from Roadside.
Loading od Metal poles all sizes
Unloading of various size of REC, RCC,PSC Poles upto 8.0m length to pole pit
Unloading of various size of REC, RCC,PSC Poles above 8.0m length to pole pit
Unloading of Metal poles all sizes
Loading of counductor
Unloading of counductor
Loading of oil drum
Unloading of oil drum
Loading of Iron & Steel
Unloading of Iron & Steel
Loading of line material
Unloading of line material
Loading of 11KV Strain disc
Unloading of 11KV Strain disc
Loading of Single phase meter
Unloading of Single phase meter
Loading of Three phase meter
Unloading of Three phase meter
Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Transportation charges
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) for lead upto 5KM.
ii)Above 5KM of lead of every KM
Transportation of metal poles of all sizes by head loads in hills areas from roadside to pole pit location i) upto 1KM
ii)Above 1KM per each KM
Transporting of conductor of all sizes from road side to pole pit location upto one KM of conductor
Transporting of Distribution Transformer/Line Materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor
ii)Above 10KM
Dismantling Charges
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
For breaking the mass concrete of all supports
Distmantling of stay set complete including stay rod
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of Cross arm clamps TI fitting hardwares, insulators etc.,
Painting
Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT
Numbering of poles including base painting and with cost of paint
Painting of iron poles up to 36 ft length with double coats including cost of paint
Painting of iron poles up to 40 ft length with double coats including cost of paint
Painting of Cement poles by Distember coating including cost of distember
Painting of structure materials double pole distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department)
Painting of structure materials Single pole distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department)
Service Connection Details painting
Dc and RC charges for service connections
Fixing of one set of street light fixiture with clamp and fitting of all sizes including cable jumpering and including transportation.
Dismantling of one set of street light fixture with clamp and fitting of all types.
Erection of MV/ Sodium Vapour lamps including wiring and fixing at street light location including transportation.
Replacing the worn out service connection cables.
Provision of guarding with two numbers earth pits excluding stay set erection. (i) Flat guarding with earth pit
(iii) DT Yard cleaning
WORKSHOP CHARGES :-
Manufacturing/ Altering of clamps
Drilling of holes in the structure materials clamps etc.
AB switch or open type side arm stud, cutting and drilling holes.
Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe
GENERAL
Numbering of Poles including cost of paint
Painting of iron poles up to 36 ft length with double coats including cost of paint
Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint
Removing weed in Sub Station yard / Office premises
Bush clearance out side Sub Station yard/ Office premises (light)
Jungle clearance such as Kattu Karuvai in the various area without uprooting
Jungle clearance such as Kattu Karuvai in the various area with uprooting
Clearing of Tree brances of coconut tree
Clearing of Tree brances of Neem, Tamerined, country etc
Leveling of Ground using Bul Dozer
Cleaaring of Branches/ Trees with JCB
Fencing of Distribution Transformer Structure at road side- Fabrication and Erection. (Including all materials)
extra labour rate for the work carried out in Hills & Reserve forest area.
G.S.T. @18% should be Entered by the Bidder
GANESAN GROUPS (BID ID -1199139)
AV ENGINEERING (BID ID -1204164)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .