Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67,472.40Accepted-AOC | ₹67,472.40 | L1 | Accepted-AOC L1(For Part A) |
| 2 | L1₹1.1 LAccepted-AOC QR NO NII 17 MPEB COLONY BIRSINGHPUR DISTT UMARIA MP 484552 | BIRSINGHPUR | UMARIA | MP | 484552 | ₹1.1 L | L1 | Accepted-AOC L1(For Part C) |
| 3 | L1₹3.2 LRejected-AOC CONTRACTOR SC 133 A B TYPE COLONY SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | ₹3.2 L | L1 | Rejected-AOC Order not issued firm banned by MPRRDA |
| 4 | L2₹6.2 LRejected-Finance NEAR OLD LIC OFFICE SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | ₹6.2 L | L2 | Rejected-Finance L2 |
| 5 | L3₹7.0 LRejected-Finance | ₹7.0 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | PRASOON ENTERPRISES L6 | R.S. CONSTRUCTION L3 | SAI CONSTRUCTION L7 | DASS ENGINEERING WORKS L1 | TAPASYA ENGINEERING L4 | ANNAPURNA TRADERS L5 | SHIVSHAKTI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Part-A | ||||||||||
| 1.01 | Cholororubber Painting on the following storage tanks, fume absorbers, dilution tanks & different types of Chemical dosing tanks in chemical House and chemical dosing house with double coat of chlororubber paint.
a) Bulk Hydrochloric acid tank
b) Hydrochloric dilution tank
c) Fume absorbers of Bulk Acid tank & HCL Dosing tank
d) Bulk Alkali storage tank
e) Alkali dilution tank
f) Polyelectrolyte dosing tank
g) Dolomite dosing tank
h) Lime dosing tank
i) Ferric Chloride dosing tank
j) Sodium Hypochlorite dosing tank
k) Sodium Metabisulphilte dosing tank
l) Antiscalant dosing tank
m) Cartridge filter
n) RO Cleaning tank | 270 | m2 | 25,380 ₹29,948.40 | 73,612.8 ₹86,864.40 | 60,750 ₹71,685 | 52,650 ₹62,127 | 56,700 ₹66,906 | 89,910 ₹1.1 L | 36,539.1 ₹43,116.30 |
| 1.02 | Cholororubber Painting of following associated structures with double coat of cholororubber paint
a) Platform, Ladder step, support angle & MS structure of acid and alkali storage tanks (overhead)
b) Platform ladder step support angle & MS structure of chemical House-1 (Polyelectrolyte, Dolomite, Lime & Ferric Chloride dosing tank)
c) Platform, Ladder step, support angle & MS structure of dosing house (HCl, NaOH, NaOCl, SBS, Antiscalant) | 200 | m2 | 31,800 ₹37,524 | 27,062 ₹31,934 | 45,000 ₹53,100 | 39,000 ₹46,020 | 42,000 ₹49,560 | 66,600 ₹78,588 | 27,066 ₹31,938 |
| 2.00Part-B | ||||||||||
| 2.01 | Synthetic enamel painting on the following:-
a. Pipelines of influent in Central Monitoring Basin (CMB) dropping from conveyer.
b. Railing of Central Monitoring Basin.
c. Following tanks & associated pipe lines & structures (including ladders, railing & all MS structures)
i. Multigrade filters.
ii. Ultrafiltration permeate tank (Interior & Exterior both).
iii. Degasser tower.
iv. Corrugated plate interceptor (CPI)
d. Pipelines and associated structure (Including railing, ladder, shed & support angles etc.) with ETP feed pump, Sludge transfer pump, ultra filtration feed pumps, cartridge filter feed pumps, ultra filters series, reverse osmosis series, reverse osmosis permeate tank, R.O. transfer pumps, R.O. cleaning pumps, R.O. - U.F. house ceiling structure.
e. Naming of tanks pipelines along with board painting for SOPs, chemical information & others as instructed by the OIC. (15 nos. of boards) | 5,220 | m2 | 4,64,580 ₹5.5 L | 3,93,066 ₹4.6 L | 4,28,040 ₹5.1 L | 3,39,300 ₹4.0 L | 3,60,180 ₹4.3 L | 2,71,440 ₹3.2 L | 3,62,581.2 ₹4.3 L |
| 3.00Part-C | ||||||||||
| 3.01 | Cleaning of following tanks.
a) Sludge sump
i. Volume of tank-18 m3
b) Clear Water Storage Tank (CWST)
ii. Volume of tank-504 m3
c) Ultra Filtration Feed Tank (UFFT)
iii. Volume of tank-504 m3
d) Ultra Filtration Permeate Tank (UFPT)
iv. Volume of tank-540 m3 | 1,566 | m3 | 1,14,318 ₹1.3 L | 98,971.2 ₹1.2 L | 1,56,600 ₹1.8 L | 92,394 ₹1.1 L | 1,40,940 ₹1.7 L | 1,83,222 ₹2.2 L | 98,986.86 ₹1.2 L |
Tender Value
₹8.2 L
EMD Value
₹16,380
Closing Date
4 Mar 2024, 3:00 pmClosed
SE PNW
O/o CE GEN SARNI
Work of Painting of various tanks, MS pipelines, MS Structures and cleaning of tanks in Effluent Treatment Plant of PH 4 , STPS, MPPGCL, Sarni.
2023_MPPGC_317231_1
WT4446
Open Tender
Miscellaneous Works
365 days
Sarni
As per NIT PQR
11 documents required · 11 mandatory
₹500
Yes
₹16,380
Yes
4 Jun 2026
18 Jan 2024
6 Mar 2024
18 Jan 2024
4 Mar 2024
18 Jan 2024
Part-A
Cholororubber Painting on the following storage tanks, fume absorbers, dilution tanks & different types of Chemical dosing tanks in chemical House and chemical dosing house with double coat of chlororubber paint. a) Bulk Hydrochloric acid tank b) Hydrochloric dilution tank c) Fume absorbers of Bulk Acid tank & HCL Dosing tank d) Bulk Alkali storage tank e) Alkali dilution tank f) Polyelectrolyte dosing tank g) Dolomite dosing tank h) Lime dosing tank i) Ferric Chloride dosing tank j) Sodium Hypochlorite dosing tank k) Sodium Metabisulphilte dosing tank l) Antiscalant dosing tank m) Cartridge filter n) RO Cleaning tank
Cholororubber Painting of following associated structures with double coat of cholororubber paint a) Platform, Ladder step, support angle & MS structure of acid and alkali storage tanks (overhead) b) Platform ladder step support angle & MS structure of chemical House-1 (Polyelectrolyte, Dolomite, Lime & Ferric Chloride dosing tank) c) Platform, Ladder step, support angle & MS structure of dosing house (HCl, NaOH, NaOCl, SBS, Antiscalant)
Part-B
Synthetic enamel painting on the following:- a. Pipelines of influent in Central Monitoring Basin (CMB) dropping from conveyer. b. Railing of Central Monitoring Basin. c. Following tanks & associated pipe lines & structures (including ladders, railing & all MS structures) i. Multigrade filters. ii. Ultrafiltration permeate tank (Interior & Exterior both). iii. Degasser tower. iv. Corrugated plate interceptor (CPI) d. Pipelines and associated structure (Including railing, ladder, shed & support angles etc.) with ETP feed pump, Sludge transfer pump, ultra filtration feed pumps, cartridge filter feed pumps, ultra filters series, reverse osmosis series, reverse osmosis permeate tank, R.O. transfer pumps, R.O. cleaning pumps, R.O. - U.F. house ceiling structure. e. Naming of tanks pipelines along with board painting for SOPs, chemical information & others as instructed by the OIC. (15 nos. of boards)
Part-C
Cleaning of following tanks. a) Sludge sump i. Volume of tank-18 m3 b) Clear Water Storage Tank (CWST) ii. Volume of tank-504 m3 c) Ultra Filtration Feed Tank (UFFT) iii. Volume of tank-504 m3 d) Ultra Filtration Permeate Tank (UFPT) iv. Volume of tank-540 m3
SHIVSHAKTI CONSTRUCTION
R.S. CONSTRUCTION
TAPASYA ENGINEERING
ANNAPURNA TRADERS
PRASOON ENTERPRISES
SAI CONSTRUCTION
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid