Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹7.2 L+₹1.2 L (19.6%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹7.7 L+₹1.7 L (28.4%)Rejected-Finance | L3 | Rejected-Finance Reject |
Tender Value
₹8.1 L
EMD Value
₹8,113
Closing Date
22 May 2026, 5:30 pmClosed
SURESH KUMAR AHIRWAR
GWALIOR MUNICIPAL CORPORATION
Mainetanace of CT/PT Ward 24, 28 and 30. Zone 11,. File No. 28/26X4/8.
2026_UAD_505557_1
MPGMC/28/26x4/8/jan/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
JANKARYA DEPARTMAENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹8,113
25 Sept 2026
7 May 2026
25 May 2026
8 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge. 1:4:8 or leaner mix | - | Cum | - | - |
| 2 | Dismantling old plaster or skirting upto 15 mm thickness, raking out joints and cleaning the surface for plaster upto two floor level including disposal of rubbish within 50 meters lead and including scaffolding etc. | - | Sqm | - | - |
| 3 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. 2.6.1 All kinds of soil | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level. Cement concrete grade M-10 (Nominal Mix) with 40 mm maximum size of stone aggregate | - | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping stretching etc. complete for and removal of form work by sheet plate or ply wood shuttering for Foundations, footings, bases of columns, etc. For mass concrete. | - | Sqm | - | - |
| 6 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | Sqm | - | - |
| 7 | 22.6 Providingand layingnon-pressureNP2class (light duty)R.C.C.pipeswithcollarsjointedwithstiffmixtureofcementmortar inthe proportionof1:2(1cement :2finesand) includingtestingof joints etc. complete 300 mm dia. R.C.C. pipe | - | meter | - | - |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | - | Sqm | - | - |
| 9 | 4.1 Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering Allworkup to plinth level. 4.1.2 Cement concretegradeM-20 (Nominal Mix) with 20mm maximum size of stone aggregate | - | Cum | - | - |
| 10 | Brick work with well burnt chimney bricks in bulls patent trench kiln manufactured by ghol process,crushing strength not less than 40kg /sqcm and water absorption not more than 15% in foundation and plinth. Cement mortar 1:6 (1 cement : 6 coarse sand | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_609276.xls
BOQ • 0.27 MB
Estimete28.pdf
Additional Documents • 3.86 MB
TenderDocument.pdf
Tender Documents • 2.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .