Tender Value
₹4.1 Cr
EMD Value
₹4.8 L
Closing Date
14 Sept 2026, 6:00 pm
CHIEF ENGINEER JABALPUR ZONE
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur Cantt 482001
PROVN OF TRANSIT ACCOMMODATION FOR 06 X OFFRS 06 X JCOs AND 20 X OR AT MFA PIPARIYA CARE OF PACHMARI MIL STN
2026_MES_779722_1
753063A PROVN OF TRANSIT ACCN FOR 06 X OFFRS, 06 X JCOs AND 20 X OR AT MFA PIPARIYA CARE OF PACHMARI
Open Tender
Civil Works
Lump-sum
550 days
PACHMARI
AS PER NIT
8 documents required · 8 mandatory
₹2,000
AGE I PACHMARHI
₹4.8 L
Yes
10 Aug 2026
10 Aug 2026
21 Sept 2026
10 Aug 2026
14 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01A : Design and Construction of Transit Accn Building (G+2 ) Storey, with permanent spceifications RCC framed structure construction with PCC block masonry, all as shown in Architectural drawings complete and as specified. Soil bearing capacity repport, complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | 1 | Each Block | - | - |
| 3 | Sch 'A' Part-II (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 4 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 5 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 6 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-VII (Rain Water Harvesting) Lump sum price worked out by the contractor for (Rain Water Harvesting) as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-VIII (Chain link fencing) Lump sum price worked out by the contractor for (Chain link fencing) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-IX (Refrigeration and Air Conditioning ) Lump sum price worked out by the contractor for (Refrigeration and Air Conditioning ) as listed in Schedule 'A' Part-IX against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
BOQ_878009.xls
BOQ • 4.37 MB
1TENDER.pdf
Tender Documents • 4.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].