| 1 | 1₹35.6 LAccepted-AOC | ₹35.6 L | 1 | Accepted-AOC Awarded |
| 2 | 2₹39.7 LRejected-AOC | ₹39.7 L | 2 | Rejected-AOC Not Awarded |
| 3 | 3₹45.1 LRejected-AOC | ₹45.1 L | 3 | Rejected-AOC Not Awarded |
| 4 | 4₹46.2 LRejected-AOC | ₹46.2 L | 4 | Rejected-AOC Not Awarded |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
14 Dec 2021, 5:00 pmClosed
SE ETC Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Shifting / Height Raising Work of 220KV D.C. Budaun-Roza Line between Tower Loc. No. 141 to 145 alongwith other associated Works under E.T.D., Budaun
2021_UPTCL_651143_1
E-tender No. 52/ETC(B)/2021-22
Open Tender
Electrical Works
60 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
SE ETC BAREILLY
₹47,000
2 Aug 2023
3 Dec 2021
15 Dec 2021
3 Dec 2021
14 Dec 2021
3 Dec 2021
Amount
Shifting / Height Raising Work of 220KV D.C. Budaun-Roza Line between Tower Loc. No. 141 to 145 alongwith other associated Works under E.T.D., Budaun, with all cost of Men, Materials, Misc. Consumables, T&Ps, Transportation of Materials for satisfactory completion of the work as per Technical Specifications and direction of the Supervising Engineer, as per details below :
Supply Component :
Compression type Double Tension Fitting Assembly suitable for ACSR Zebra Conductor consisting of Compression Dead End Clamp with Jumper Terminal (Cone), Anchor Shackle (2 No.), Yoke Plate (2 No.), Chain Link, Socket Clevis, Clevis Eye, Line side Arcing Horn, Tower side Arcing Horn complete with Bolts-Nuts-Spring Washers, Split Pin etc. as per Technical Spec. & Sample.
Compression type Single Tension Fitting Assembly suitable for ACSR Zebra Conductor consisting of Compression Dead End Clamp with Jumper Terminal (Cone), Anchor Shackle, Ball Clevis (HH type), Socket Clevis (HH type), Line side Arcing Horn, Tower side Arcing Horn complete with Bolts-Nuts-Spring Washers, Split Pin etc. as per Technical Specifications & Sample.
Single Suspension Fitting Assembly suitable for ACSR Zebra Conductor consisting of Suspension Clamp, Ball Hook, Socket Eye (HH type), Line side Arcing Horn complete with Bolts-Nuts-Spring Washers, Split Pin etc. as per Technical Specifications & Sample.
Mid Span Compression Joint suitable for ACSR Zebra Conductor consisting of extruded Aluminium Outer Sleeve (OD 38 mm, ID 23 mm, L 610 mm) and Mild Steel Inner Sleeve (OD 18 mm, ID 9.5 mm, L 203 mm) as per Technical Specifications & Sample.
Repair Sleeve suitable for ACSR Zebra Conductor duly made of extruded Aluminium Sleeve (OD 38 mm, ID 23 mm, L 241 mm) as per Technical Specifications & Sample.
Stock Bridge Vibration Damper (4R type) suitable for ACSR Zebra Conductor as per Technical Specifications & Sample.
Compression type Tension Fitting Assembly suitable for 7/10 SWG Earth Wire consisting of Dead End Tube, Jumper Tube, Anchor D-Shackle complete with Bolts-Nuts-Spring Washers, Cotter Pin etc. as per Technical Specifications & Sample.
Mid Span Compression Joint suitable for 7/10 SWG Earth Wire duly made of Mild Steel Tube (OD 18 mm, ID 10.3 mm, L 203 mm) as per Technical Specifications & Sample.
Stock Bridge Vibration Damper (4R type), suitable for 7/10 SWG Earth Wire as per Technical Specifications & Sample.
Flexible Copper Bond of size 12 mm x 570 mm duly made of Electrolytic Copper and crimped with Copper Lugs at both ends as per Technical Specifications & Sample
Number Plate in size of 165 mm x 150 mm duly made of 16 SWG M.S. Sheet with Letters and Numerals in enamelled Red colour on White colour enamelled background indicating name of Transmission Line in short (in English Letter of size 35 mm height) and Tower No. (in English Letter of size 65 mm height) as per requirement alongwith 2 No. 16 mm x 40 mm size G.I. Bolts - Nuts - Spring Washers with of 2 No. holes in Number Plate for fixing as per Technical Specifications & (From Loc. No. 141 to Loc. No. 145).
Phase Plate in Sets of both sides enamelled Red, Yellow & Blue colour Circular Discs of dia. 100 mm duly made of 16 SWG M.S. Sheet alongwith 1 No. 16 mm x 40 mm size G.I. Bolt - Nut - Spring Washer with 1 No. hole in Phase Plate for fixing as per Technical Specifications & Sample.
Danger Plate in size of 380 mm x 250 mm duly made of 16 SWG M.S. Sheet written 'DANGER' in English letter of size 35 mm height, ¼[krjk½ in Hindi Letter of size 45 mm height, '220000 Volt' in English Letter of size 30 mm height indicating 'Sign of Danger' in size of 70 mm x 80 mm all shown symmetrically in enamelled Red Colour on White Colour Enamelled background alongwith 2 No. 16 mm x 40 mm size G.I. Bolts - Nuts - Spring Washers with 2 No. holes in Danger Plate for fixing as per Technical Specifications & Sample.
Pipe type Earthing Equipment Set consisting of 32 mm dia. 3050 mm long heavy duty perforated 'C' Class G.I. Pipe, 50 mm x 6 mm size & 4750 mm long Galvanized Steel Flat, 2 No. 12 mm x 40 mm size G.I. Bolts - Nuts - Spring Washers etc. as per Technical Specifications & Sample.
Work Component :
Survey including making of Location Route, Preparation of Profile, Tower Schedule, Schedule of Materials for diversion of Existing 220KV D.C. Budaun-Roza on new Route on 220KV D.C. Towers.
Check Survey & Peg marking of Tower / Gantry Locations.
Excavation of Foundation Pits for 220KV Towers including all Earth work, Back filling, Leveling etc.
Setting of Stubs of 220KV D.C. Towers including all Foundation Work but excluding the Cost of Concerting & Excavation as per details below :
(a) 'B+5' type Tower
(b) 'C+5' type Tower
(c) 'C+15' type Tower
Concreting of Foundations using M20 Grade Cement - Concrete - Coarse Sand mixture in the Ratio of 1:2:4 with 20 mm Stone Metal for Towers & Gantries including Cost of Materials, De-watering, Shoring, Shuttering, Framing, Curing etc.
Installation of Steel Reinforcement Bars in R.C.C. Foundation for Towers & Gantries including Cost of Steel Reinforcement Bars with due Cutting, Bending, Placing, Binding etc.
Transportation of new Tower Parts, Gantry Structures, ACSR Zebra Conductors, 7/10 SWG Earth Wire, Disc Insulators / Polymer Insulator Strings, Hardware Fittings etc. from Storage Place at the designated Sub Stations to Line Site, Line Site to Line Site as per direction of the Supervising Engineer including Loading, Unloading & Stacking etc.
Erection of Super Structures of above 220KV Towers, their Extensions wherever required and Gantries including all work above Ground Level with proper Fixing & Tightening of all Tower Parts including Fitting of Danger Plate, Phase Plate, Number Plate, Bird Guard etc. but excluding the Hoisting of Insulators, Fixing of Hardware Fittings, Conductor / Earth Wire Fittings / Accessories etc.
Laying, Stringing, Tensioning, Clamping of 7/10 SWG Earth Wire including Fixing of Tension Fittings, Suspension Fittings, Vibration Dampers etc. between Section Towers to Section Tower between existing Tower Location No. 141 to Loc. No. 145 on new Line Route.
Laying, Stringing, Tensioning, Clamping of ACSR Panther Conductor in all the 3 Phases including Hoisting of Tension / Suspension Insulator Strings, Double / Single Tension Fittings, Single Suspension Fittings, Vibration Dampers etc. between Section Towers to Section Tower between existing Tower Location No. 141 to Loc. No. 145 on new Line Route.
Tack Welding of all the Bolts - Nuts upto 2nd Section of the Towers from Ground Level with 3 Tacks of 10 mm thickness & finally, applying of Zinc Rich Aluminium Paint on the affected surface.
Earthing work including Earth Work etc. for Pipe type Earthing of new Section Towers / Gantries including cost of Coke, Salt etc.
Anchoring by providing of Stay on Cross Arms of Section Towers at Loc. No. 141 & 145 before removal of old Conductors by making C.C. Foundation for Anchoring of Stay Wire, Fixing of suitable Stay Wire / Rod etc. and finally, removal thereof after Stringing of new Conductors. (1 Job per Cross Arm)
De-stringing of ACSR Zebra Conductor of all the 3 Phases between Section Tower to Section Tower including De-hoisting of Tension / Suspension Disc Insulator Strings, Hardware Fittings, Conductor Fittings / Accessories etc. between existing Tower Location No. 141 to Loc. No. 145 on the Line.
De-stringing of 7/10 SWG Earth Wire between Section Tower to Section Tower including De-hoisting of Hardware Fittings, Earth Wire Fittings / Accessories etc. between existing Tower Location No. 141 to Loc. No. 145 of the Line.
Dismantling of Super Structure of existing Tower Location No. 142 to Loc. No. 144 above Ground Level including necessary use of Gas Cutter for cutting of Welded Bolts - Nuts etc.
Removding of RCC Chimeny of dismentalled Tower (all 4 legs) below 1 meter from ground level including cutting of stub, back filling and dispose of use less concerting.
Transportation of Dismantled Tower Parts, Conductor, Earth Wire, Disc Insulators, Hardware Fittings, Conductor / Earth Wire Fittings / Accessories etc. and Transporting back the unused new Items from Line Site to Stores at the designated Sub Stations as per direction of the Supervising Engineer including Loading, Unloading & Stacking etc.
Round the Clock Watch & Ward of the Line / Line Materials during Line diversion work to avoid theft of Tower Parts, Conductors, Hardware Fittings, Accessories etc. (1 Job per Day)
LASHANI ENTERPRISES
YASHRAJ CONSTRUCTION PRIVATE LIMITED
Shaurya Shakti Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid