| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC | ₹27.9 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | Ershad Ibrahim Zaman L1 |
|---|---|---|---|---|
| 1.00(i) Kochor Chuk Road, | ||||
| 1.10 | Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. | 360 | Hect | 8.27 ₹2,977.20 |
| 1.20 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(i) Private Land | 66.96 | Cum | 258.21 ₹17,289.74 |
| 1.30 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
(i) Private Land | 16.65 | Cum | 339.68 ₹5,655.67 |
| 1.40 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402 | 54 | Cum | 2,628.95 ₹1.4 L |
| 2.00(ii) Remaining Portion of Abandon Railway Line Path, | ||||
| 2.10 | Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. | 1,110 | Hect | 8.27 ₹9,179.70 |
| 2.20 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(i) Private Land | 207.76 | Cum | 258.21 ₹53,644.68 |
| 2.30 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
(i) Private Land | 51.34 | Cum | 339.68 ₹17,438.49 |
| 2.40 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402 | 166.5 | Cum | 2,628.95 ₹4.4 L |
Tender Value
₹27.9 L
EMD Value
₹55,740
Closing Date
12 Dec 2025, 2:00 pmClosed
EE, PWRD, Jorhat and Titabor TRD
Office of the EE, PWRD, Jorhat and Titabor TRD
Impr of Kochor Chuk Road, Remaining Portion of Abandon Railway Line Path, Saikia Chuk Road, (2 No. Lakhimikhat), Mena Chuk Road, Borigaon Shiv Mandir to Bortekela Road, Hazarika Path,Umaram Dutta Path, Bosachuk Namghaor Path under SOPD_G
2025_PWD_49090_3
NIT/JTTRD/2024-25/001/1731
Open Tender
Civil Works – Roads
90 days
Jorhat
Please Refer Tender documents
6 documents required · 6 mandatory
₹840
₹55,740
Yes
13 Apr 2026
8 Dec 2025
12 Dec 2025
8 Dec 2025
12 Dec 2025
8 Dec 2025
Amount
(i) Kochor Chuk Road,
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
(ii) Remaining Portion of Abandon Railway Line Path,
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
(iii) Saikia Chuk Road, (2 No. Lakhimikhat),
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
(iv) Mena Chuk Road,
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
(v) Borigaon Shiv Mandir to Bortekela Road,
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
(vi) Hazarika Path
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
Construction of 600mm dia HPC (Laying)
(vii) Umaram Dutta Path
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
Construction of 600mm dia HPC (Laying)
(viii) Bosachuk Namghaor Path
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, commplete as per Technical Specification Clause 402
Construction of 600mm dia HPC (Laying)
stage.html
html • 0.04 MB
technical_77947.pdf
techsummary_77947.pdf
finance_77947.pdf
BOQ Comparative Chart
xlsx
finsummary_77947.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Re_FOB_24.pdf
Tender Documents • 0.12 MB
BOQ_77947.xls
BOQ • 0.29 MB
RE-SBD_24.pdf
Tender Documents • 19.73 MB
Download all tender documents and submit your bid