Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC BANKOLA AREA BANKOLA AREA OFFICE P O UKHRA DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713363 | UKHRA | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC AS PER TCR | |
| 2 | L2₹2.4 L+₹11,215.38 (5.00%)Rejected-Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | L2 | Rejected-Finance AS PER TCR |
Tender Value
₹2.2 L
EMD Value
₹2,900
Closing Date
12 Jul 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM, BANKOLA AREA
OFFICE OF THE GM, BANKOLA AREA, UKHRA, PIN-713363
Installation of underground substatioin at 1L/1D for SDL section at Shyamsundarpur Colliery under Bankola Area
2022_ECL_248069_1
ECL/GM/BA/E TENDER/22-23/Enm/30 23.06.2022
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
BANKOLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,900
18 Oct 2022
27 Jun 2022
13 Jul 2022
27 Jun 2022
12 Jul 2022
28 Jun 2022
27 Jun 2022 - 1 Jul 2022
120 days
Amount
Item Description/ Heading
Collection of rolley from SDL section and lifting to surface and loading of TSU and its breaker at Surface .
Lowering of TSU and its breaker from piit topp to pit bottom after dismantling of cage and again fitting of cage after lowering .
transportation of TSU and its breaker from pit botttom to 1L/1D and assembling of TSU and its breaker after unloading .
Collection of trolley and dismentling of TSU and its breaker and then loading both of them on trolley at 35L/2D at pit no 2
Transportation of TSU and its breaker from 35L/2D to 1L/1D by manually pulling over trackline and then assembling of TSU and its breaker after unloading
Collection of trolley and loading of one prabhu make VCB and two nos of ACB at 35L/2D at pit no 2 and then transportating them to 1L/1D by manually pulling over .
Collection of trolley and loading of one prabhu make VCB and two nos of ACB at 25L/1D at pit no -3 and then transportation them to pit bottom by haulage
Lifting of one prabhu make VCB and two nos of ACB from pit bottom of pit no 3 to surface and again lowering to pit bottom of pit no 2
Transportation of one prabhu make VCB and two nos of ACB from pit bottom of pit no 2 to 1L/1D and unloading and placing them .
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
stage.html
html • 0.04 MB
techsummary_256284.pdf
PDF • 1.43 MB
finsummary_256284.pdf
PDF • 1.43 MB
enm30.pdf
PDF • 1.43 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .