Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Fee/PreQual/Technical/Finance | -0.50% | ₹13.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.1 L+₹1,313.34 (0.10%)Admitted-Fee/PreQual/Technical/Finance | -0.40% | ₹13.1 L+₹1,313.34 (0.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.4 L+₹32,833.67 (2.51%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹13.4 L+₹32,833.67 (2.51%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.1 L
EMD Value
₹26,274
Closing Date
25 May 2026, 11:00 amClosed
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
PURSTAM NAGAR WARD MOHALLA SEKHANA SOUTH GAUTAM RISHI ASRAM BAYKUNTH DHAN ANTNSTHI STHAL GAT KUMD MARAMAT VISRAMALYA SLAB SWNDERIKARAN KARY
2026_DOLBU_1141189_29
23/NPP/RUDAULI/2026-27
Open Tender
Civil Works
Percentage
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,563
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
₹26,274
5 Aug 2026
25 Apr 2026
26 May 2026
25 Apr 2026
25 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 | 20.28 | sqm | 130.46 | ₹2,645.73 |
| 2 | P/L cement concrete 1:4:8 in cand cement all complete | 3.38 | cum | 5,006.82 | ₹16,923.05 |
| 3 | P/L In position specified grade reinforced all complete | 6.02 | cum | 6,648.62 | ₹40,024.69 |
| 4 | P/L 1:1.5:3 in cement, C. Sand and 20mm stone grit in RCC Slab. All complete as per SI no. 284 B | 10.29 | cum | 7,976.91 | ₹82,082.4 |
| 5 | Stell reinforced for R.C.C work all complete | 12.8 | qtl | 7,926 | ₹1,01,452.8 |
| 6 | P/L position cement concrete 1:2:4 all complete | 1.72 | cum | 5,790.69 | ₹9,959.99 |
| 7 | Brick work all complete | 3.51 | cum | 5,417.42 | ₹19,015.14 |
| 8 | Brick work common burnt clay all complete | 15 | cum | 6,868.09 | ₹1,03,021.35 |
| 9 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 | 118.67 | sqm | 262.65 | ₹31,168.68 |
| 10 | P/A White cement based putty all complete SI NO 13.8 | 118.67 | sqm | 114.96 | ₹13,642.3 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.50 MB
BOQ_2132299.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .