Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | -0.20% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.4 L
EMD Value
₹12,150
Closing Date
24 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF RETAINING WITH FENCING AND GATE AT SHIPPORA GRAVEYARD IN WARD 5 AND WARD 6 CHAIROO
2026_RDPR_318826_28
NIT_27_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
S K Pora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹12,150
Yes
15 Sept 2026
31 Jul 2026
25 Aug 2026
31 Jul 2026
24 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Providing and laying of stone soling hand packed including dressing,filing the interstices including carriages of lead 10km avg' complete job | 3.24 | CUM | 1,265.31 | ₹4,099.6 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 12.96 | CUM | 5,733.6 | ₹74,307.46 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 72 | SQM | 286.35 | ₹20,617.2 |
| 0_) | High-Rib GI Roofing Sheets Providing and fixing precoated galvanised iron coloured High-Rib sheets (size, shape and colour as approved by Engineer-in-Charge), 0.50 mm (+0.05%) total coated thickness with 120 g/sqm zinc coating as per IS:277, 240 MPa steel grade, 5–7 micron epoxy primer on both sides and 15–18 micron polyester top coat. Sheet shall have 25 micron protective guard film and be fixed using 5.5 × 100 mm self-drilling/self-tapping screws with EPDM seal, complete including cutting to required size and shape, excluding cost of purlins, rafters and trusses. | 149.24 | SQM | 904.1 | ₹1,34,927.88 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: Sand/Fine Agg. for an average lead of 10 Km | 5.83 | CUM | 279 | ₹1,626.57 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:Coarse Agg./Aggregrate for an average lead of 15 Km | 11.66 | CUM | 344.5 | ₹4,016.87 |
| 0_) | Add provisions for signboard, Photographes and other unforseen items. | 1 | job | 3,404 | ₹3,404 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1052861.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .