Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25 LAccepted-AOC | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | V.V.ELECTRICALS AND CIVIL CONTRACTORS L1 |
|---|---|---|---|---|
| 1.00EXCAVATION OF POLE PITS / Stay Set: | ||||
| 2.00 | For pole upto 8.00m length by using JCB/Manual | 1 | per pit | 800 ₹944 Lowest |
| 3.00 | For pole above 8.00m length by using JCB/Manual | 1 | per pit | 810 ₹955.8 Lowest |
| 4.00 | In Hard Soil (common to all size of poles) | 1 | per pit | 810 ₹955.8 Lowest |
| 5.00 | In rocky area (common to all size of poles) by blasting / Manual | 1 | per pit | 810 ₹955.8 Lowest |
| 6.00 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 1 | per pit | 750 ₹885 Lowest |
| 7.00 | Excavation & back filling of stay pit per location - Hard rock requires blasting | 1 | each | 750 ₹885 Lowest |
| 8.00 | Excavation & back filling of stay pit per location - Hard rock without blasting | 1 | each | 750 ₹885 Lowest |
| 9.00 | Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting | 1 | each | 750 ₹885 Lowest |
| 10.00ERECTION OF POLES AND ACCESSORIES | ||||
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
25 Aug 2026, 2:00 pmClosed
SE/CEDC/S/CBE
coimbatore
Works contract for carrying out HT LT DCW, Improvement and capital extension works for the period of one year from the date of execution of agreement or commencement of work of the contract in Negamam Sub division of Negamam Division
2026_EB_692958_1
Spec No.18/26-27, Dt 06.08.2026
Open Tender
Electrical Works
Works
365 days
COIMBATORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
29 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION OF POLE PITS / Stay Set: | - | - | - | - |
| 2 | For pole upto 8.00m length by using JCB/Manual | 1 | per pit | - | - |
| 3 | For pole above 8.00m length by using JCB/Manual | 1 | per pit | - | - |
| 4 | In Hard Soil (common to all size of poles) | 1 | per pit | - | - |
| 5 | In rocky area (common to all size of poles) by blasting / Manual | 1 | per pit | - | - |
| 6 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 1 | per pit | - | - |
| 7 | Excavation & back filling of stay pit per location - Hard rock requires blasting | 1 | each | - | - |
| 8 | Excavation & back filling of stay pit per location - Hard rock without blasting | 1 | each | - | - |
| 9 | Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting | 1 | each | - | - |
| 10 | ERECTION OF POLES AND ACCESSORIES | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_833187.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .