| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.1 Cr+₹1.3 L (1.26%)Accepted-Finance | ₹1.1 Cr+₹1.3 L (1.26%) | L2 | Accepted-Finance L2 |
Tender Value
₹1.3 Cr
EMD Value
₹73,000
Closing Date
13 Feb 2025, 3:00 pmClosed
Executive Officer
Arulmigu Vamsatharenyeeshwarar Temple at Allur Village, Thiruvaiyaru Taluk, Thanjavur District.
Re Construction of swamy Sannathi, Thirumadhill wall, Madapalli, Providing cut stone prahara flooring and Renovation of Amman sannathi, Vinayagar sannathi, Mahamandapam and Erection of bore well arrangements
2025_HRCE_520312_1
01/2025 Vamsatharenyeeshwarar Temple at Allur
Open Tender
Civil Works - Others
Item Rate
365 days
Arulmigu Vamsatharenyeeshwarar Temple
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹73,000
15 Feb 2025
24 Jan 2025
13 Feb 2025
24 Jan 2025
13 Feb 2025
24 Jan 2025
Amount
Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects..
Supplying and filling with Sand and Gravel mix in 1: 3 ratio, filled up in 150mm layers with moisture percentage of 18% including cost and conveyance of Quarry Dust, gravel and all labour charges for filling ramming etc. complete with standard specifications as directed by the Dept,Officers.
Cement concrete 1:5:10 (One cement, five crushed stone sand and ten aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed, watered etc., complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
a) For Basement
b) For curved surface (Doom)
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
a) Foundation and Basement
Supplying, fabricating and placing in position Mild steel or Ribbed tor steel in all size for all RCC works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specifications. (The contratctor will have to make his own arrangements for the supply of MS plain rod / RTS rod and binding wire)
Brick masonry lime mortar 1:2 (One Lime and two Sand) using Stock bricks including all varivargams, mould sthambams mokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharams Agarais, Karanakoodu, etc., forming core walls of Rajagopuram / Vimanam complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft
a) For Kalkaram
b) Vimanam / gopuram of ht. Up to 25' excluding Kalkaram.
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 (One Lime and One and a half Sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
a) For Kalkaram
b) Vimanam / gopuram of ht. Up to 25' excluding Kalkaram.
c) Vimanam / gopuram of ht. Up to 15' excluding Kalkaram.
Brick work in lime Mortor 1:2 (One Lime and two Sand) using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Plastering with Lime mortar1:1.5,(one part of lime and one and half part of sand) 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications and as directed by the Dept,Officers.
Plastering with Lime mortar1:1.5,(one part of lime and one and half part of sand) 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications and as directed by the Dept,Officers.
Clean removal of lime plaster and Replastering with Lime Mortor1:1.5,(One Lime and One and a half Sand) 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
a) Vimanam /Gopuram upto 25'-0" Height
b) Vimanam /Gopuram upto 15'-0" Height
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
a) Vimanam /Gopuram upto 15'-0" Height
b) Vimanam /Gopuram upto 25'-0" Height
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Varnishing new and old wood work two coats of approved quality in all floors the rate includes cost of all materials, brushes scaffolding charges etc., complete
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.and as directed by the departmental officers
Finishing the top of roof with one course of machine pressed tiles of size 20cmx 20cmx20mm approved quality set in lime Mortar 1:3 (One Cement and Three crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supply of cut stone for carrying out Garbagraham, Arthamandapam , Mahamandapam and other temple structure up to 10 feet length Side wall, Pavukkal , Uthiram and all hire charegs for all tools and plants and clearing the site after completeion of work etc., complete.
Removing the old stone and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the old stone including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Fixing the New stone Kalvari including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Labour charges for cut stone Nilaikkal (Nagapantham Kodikarukku and Karukku) excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Nasi Thalai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Fixing the New stone Chitravanam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete. Nandhi Mandapam
Supply and laying of Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 etc complete. (inner flooring)
Supply and laying of Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 etc complete .(outer flooring)
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor 1:3 finishing the same with Lime Mortor 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size above 2'6" up to 3'6"
Drilling of Bore walls anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in Alluvial Soil Sedimentary strata of day and stone shale pebbles boulders etc.By first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs,fuel,labour and drilling at site (Site will shown by the TWAD Board Officers) including construction of mud pit.
Drilling 150mm pilot bore
Reaming from 150mm dia to 300mm dia bore as directed by dept. officers.
Supply and delivery of vertical wet type submersible pumpset 2 HP capable of discharging with control panel with necessary pipes and fitting and labour charges etc.complete.
3 PAHSE 2 HP ISI make 4 stage submersible pumpset 100x40 with Excise duty and taxes etc.
160mm PVC end cup
GM white
500ML Solvent cement
Bolt and Nut
50mm PVC Coupling
50mm PVC Bend
50mm PVC Elbow
6 Sqmm 3 core flat Cable
PVC Tap Roll (Empier Tape)
Nool Kandy
Gusket shellac
50mm class PVC 10 KSC
150mm CS Casing Medium depth PVC pipe.
3 Phase panel board - D.O.L with two level guard and auto start ( 13390+1951 ) Rate + 4% vat
Slotter charge
Labour charges for inserting 150mm dia M.S Casing pipes assembly (With Slots or without slots)in the drilled hole including welding the joints an packing annular space with Pebbles of size and quality as approved by the Executive Engineer / TWAD Board.
Charges for developing the borewells with air compressor of 300 cfm capacity (minimum 8 hours) including transporation, labour and fuel charges for compressor as directed by TWAD Board Officers and conducting Yield test by "V" Notch method.
Supplying laying and jointing HDPE pipe of approved quality and best variety conforming to ISS and with ISI mark of 50mm including cutting threading and fixing PVC specials and including earth work exvcavation for 1M depth below ground level etc complete as per standard specifications.(For sub-marsible pump in borwell class-5 ,1mpa)
sub total
SHANMUGAM C (BID ID -1247575)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_619174.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .